Indian Army
Chhattisgarh | Raipur |
- Download
Time left to bid
12
Days10
Hours5
MinutesTender Roadmap
Publish Date
21 Nov 2024
Tender is published for seller Participation.
Bid Submission End Date
06 Dec 2024
Last day to participate Tender on GeM platform.
Evaluation Date
06 Dec 2024
Technical committe will evaluate Bid and Open Results.
Earnest Amount | |||||||||||||||||||||||||||||
XXXXXXX | |||||||||||||||||||||||||||||
Tender Amount | |||||||||||||||||||||||||||||
XXXXXXX | |||||||||||||||||||||||||||||
Department | |||||||||||||||||||||||||||||
Department Of Military Affairs | |||||||||||||||||||||||||||||
Item Category | |||||||||||||||||||||||||||||
MCB - Miniature Circuit - Breakers for A.C. Operation as per IS / IEC 60898 Part 1 Q2 LED Batten Q2 XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 Part 1 Q2 LED Luminaire for Road and Street Lights as per IS 10322 IS 16107 IS 16108 IS 16103 IS 10322 Q3 Copper Alloy Fancy Taps for Bathroom as per IS 8931 Latest Q3 Electrical connection Lugs or thimbles Q3 Piano Type Modular Domestic Electrical sockets - IS 1293 Q3 Piano Type Non Modular Electrical Switch Socket Combination as per IS 3854 and IS 1293 Q3 Elecric Bells and Accessories as per IS 2268 Q3 Towel Rail / Ring for Bathroom Q3 Fixed Capacitors Fixed Capacitor for Single Phase AC Electric Fan as per IS 1709:1984 Q3 Connection Pipe with Nuts V2 Q3 LED Luminaire for Flood Light as per IS 10322 IS 16107 Q3 Modular Piano Type Domestic Electrical Switches as per IS 3854 Q3 Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 6 Lakh s OEM Average Turnover Last 3 Years/ 3 3 5 Lakh s Years of Past Experience Required for same/similar service/ 23 23 3 Year s | |||||||||||||||||||||||||||||
Purchaser Address | |||||||||||||||||||||||||||||
Raipur | |||||||||||||||||||||||||||||
Work Description | |||||||||||||||||||||||||||||
1781; MCB - Miniature Circuit - Breakers for A.C. Operation as per IS / IEC 60898 Part 1 Q2 LED Batten Q2 XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 Part 1 Q2 LED Luminaire for Road and Street Lights as per IS 10322 IS 16107 IS 16108 IS 16103 IS 10322 Q3 Copper Alloy Fancy Taps for Bathroom as per IS 8931 Latest Q3 Electrical connection Lugs or thimbles Q3 Piano Type Modular Domestic Electrical sockets - IS 1293 Q3 Piano Type Non Modular Electrical Switch Socket Combination as per IS 3854 and IS 1293 Q3 Elecric Bells and Accessories as per IS 2268 Q3 Towel Rail / Ring for Bathroom Q3 Fixed Capacitors Fixed Capacitor for Single Phase AC Electric Fan as per IS 1709:1984 Q3 Connection Pipe with Nuts V2 Q3 LED Luminaire for Flood Light as per IS 10322 IS 16107 Q3 Modular Piano Type Domestic Electrical Switches as per IS 3854 Q3 Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 6 Lakh s OEM Average Turnover Last 3 Years/ 3 3 5 Lakh s Years of Past Experience Required for same/similar service/ 23 23 3 Year s
|
|||||||||||||||||||||||||||||
Eligibility | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
My Evaluation Notes | |||||||||||||||||||||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.
CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.