Directorate General Of Lighthouses And Lightships
Andaman And Nicobar Islands | South Andamans |
- Download
Time left to bid
20
Days12
Hours32
MinutesTender Roadmap
Publish Date
22 Nov 2024
Tender is published for seller Participation.
Bid Submission End Date
14 Dec 2024
Last day to participate Tender on GeM platform.
Evaluation Date
14 Dec 2024
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
XXXXXXX | ||||||||||
Tender Amount | ||||||||||
XXXXXXX | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
OIL FILTER FUEL FILTER ELEMENT WITH O RING O RING 18.8 x 1.8 DRAIN PLUG O RING BREATHER CAP O RING 8.3 x 1.78 DIP STICK SEALING WASHER CU 14 x 18 EICHER ENGINE OIL 15W40 9.5 LTR COGGED V BELT AV13 x 1335 MAIN ELEMENT GASKET INSPECTION COVER O RING 29.2 x 3 O RING FOR LIFTER GUIDE O RING 36.2 x 3 SEALING WASHER FUEL PIPE ASSLY GASKET FOR Cyl HEAD COVER ENGINE SHUT OFF SOLENOID OIL PRESSURE SENSOR SINGLE PORT FUEL PIPE FEED PUMP TO FILTER FUEL PIPE FILTER TO FUEL PUMP OIL PRESSURE SWITCH STARTER MOTOR ASSLY BLOWER SHAFT SUB ASSLY AVR 5 to 125 KVA AMF CONTROLLER TEC 9900C 18 Inch EXHAUST FAN GeMARPTS / Searched Strings used in GeMARPTS AMF CONTROLLER Stator Motor Assemble GeMARPTS / Searched Result generated in GeMARPTS Searched String : AMF CONTROLLER Wireless Controller Searched String : Stator Motor Assemble Starter Motor Assembly / Relevant Categories selected for notification Starter Motor Assembly Propeller Type AC Ventilating Fans - Exhaust Fans V2 as per IS 2312 15w - 40 Diesel Engine Oil | ||||||||||
Purchaser Address | ||||||||||
744101,Dte of lighthouses and lightships,44 BS road ,Deep Bhavan, near Phoenix Bay power house Port Blair | ||||||||||
Work Description | ||||||||||
Procurement of Eicher DG set spares for EILH DGNSS Station;412; OIL FILTER FUEL FILTER ELEMENT WITH O RING O RING 18.8 x 1.8 DRAIN PLUG O RING BREATHER CAP O RING 8.3 x 1.78 DIP STICK SEALING WASHER CU 14 x 18 EICHER ENGINE OIL 15W40 9.5 LTR COGGED V BELT AV13 x 1335 MAIN ELEMENT GASKET INSPECTION COVER O RING 29.2 x 3 O RING FOR LIFTER GUIDE O RING 36.2 x 3 SEALING WASHER FUEL PIPE ASSLY GASKET FOR Cyl HEAD COVER ENGINE SHUT OFF SOLENOID OIL PRESSURE SENSOR SINGLE PORT FUEL PIPE FEED PUMP TO FILTER FUEL PIPE FILTER TO FUEL PUMP OIL PRESSURE SWITCH STARTER MOTOR ASSLY BLOWER SHAFT SUB ASSLY AVR 5 to 125 KVA AMF CONTROLLER TEC 9900C 18 Inch EXHAUST FAN GeMARPTS / Searched Strings used in GeMARPTS AMF CONTROLLER Stator Motor Assemble GeMARPTS / Searched Result generated in GeMARPTS Searched String : AMF CONTROLLER Wireless Controller Searched String : Stator Motor Assemble Starter Motor Assembly / Relevant Categories selected for notification Starter Motor Assembly Propeller Type AC Ventilating Fans - Exhaust Fans V2 as per IS 2312 15w - 40 Diesel Engine Oil
|
||||||||||
My Evaluation Notes | ||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.
CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.