Hindustan Aeronautics Limited hal
Orissa | Koraput |
- Download
Time left to bid
10
Days21
Hours20
MinutesTender Roadmap
Publish Date
10 Dec 2024
Tender is published for seller Participation.
Bid Submission End Date
01 Jan 2025
Last day to participate Tender on GeM platform.
Evaluation Date
01 Jan 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
XXXXXXX | ||||||||||
Tender Amount | ||||||||||
XXXXXXX | ||||||||||
Department | ||||||||||
Department Of Defence Production | ||||||||||
Item Category | ||||||||||
Pos. 9601 Hydraulic Unit SMA05-44/16.0-C00-55S. F-000 30366804 PN. R281C9601B21B as per spec. Pos. 1361 Hydraulic Block BKP-A-04/4/2TS 30355500 PN. R282C1361C41 as per specification Pressure Switch EDS8446-2-0250-000 920861 SP36 PN. 4252210960 Connecting Cable WAK4-2-WAS4/S90-8006739 7000- 40021-2240200 PN. 5129510537 GeMARPTS / Searched Strings used in GeMARPTS Connecting Cable WAK4-2-WAS4/S90-8006739 7000- 40021-2240200 PN. 5129510537 GeMARPTS / Searched Result generated in GeMARPTS Cable Cross Over Version 2 Radio Frequency Co - Axial Cable Type 75 - 7 - 2 Coaxial Cable as per IS 5802 PVC Insulated Heavy Duty Electric Cables Suitable for use in Mines as per IS 1554 Part 2 PVC Insulated Heavy Duty Electric Cables Category:01 as per IS:1554 Part 2 PVC Insulated Heavy Duty Electric Cables Category C1 - FR as per IS 1554 Part 2 PVC Insulated Heavy Duty Electric Cables Category C2 - FR - LSH as per IS 1554 Part 2 PVC Copper Cable Heavy Duty - Type A PVC Compound Category C 2 - FR - LSH as per IS 1554 Part 1 XLPE Cables for Working Voltages From 3.3 KV up to and Including 33 KV as per IS 7098 Part 2 XLPE Cables Categpory C1 - FR for Working Voltages from 3.3 KV up to and Including 33 KV as per IS 7098 Part 2 Elastomer Insulated Textile Braided Cables - IS 9968 Part 1 / Relevant Categories selected for notification Control Cable | ||||||||||
Purchaser Address | ||||||||||
KORAPUT | ||||||||||
Work Description | ||||||||||
4; Pos. 9601 Hydraulic Unit SMA05-44/16.0-C00-55S. F-000 30366804 PN. R281C9601B21B as per spec. Pos. 1361 Hydraulic Block BKP-A-04/4/2TS 30355500 PN. R282C1361C41 as per specification Pressure Switch EDS8446-2-0250-000 920861 SP36 PN. 4252210960 Connecting Cable WAK4-2-WAS4/S90-8006739 7000- 40021-2240200 PN. 5129510537 GeMARPTS / Searched Strings used in GeMARPTS Connecting Cable WAK4-2-WAS4/S90-8006739 7000- 40021-2240200 PN. 5129510537 GeMARPTS / Searched Result generated in GeMARPTS Cable Cross Over Version 2 Radio Frequency Co - Axial Cable Type 75 - 7 - 2 Coaxial Cable as per IS 5802 PVC Insulated Heavy Duty Electric Cables Suitable for use in Mines as per IS 1554 Part 2 PVC Insulated Heavy Duty Electric Cables Category:01 as per IS:1554 Part 2 PVC Insulated Heavy Duty Electric Cables Category C1 - FR as per IS 1554 Part 2 PVC Insulated Heavy Duty Electric Cables Category C2 - FR - LSH as per IS 1554 Part 2 PVC Copper Cable Heavy Duty - Type A PVC Compound Category C 2 - FR - LSH as per IS 1554 Part 1 XLPE Cables for Working Voltages From 3.3 KV up to and Including 33 KV as per IS 7098 Part 2 XLPE Cables Categpory C1 - FR for Working Voltages from 3.3 KV up to and Including 33 KV as per IS 7098 Part 2 Elastomer Insulated Textile Braided Cables - IS 9968 Part 1 / Relevant Categories selected for notification Control Cable
|
||||||||||
My Evaluation Notes | ||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.
CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.