East Coast Railway
    Showing 1 - 25 of 594
    East Coast Railway
    Construction Of Road Over Bridge (1 X 24.0 M + 1 X 42.0 M) Composite Girder For Railway Portion In Lieu Of Lc No. Kp-09 And Proposed Span Of 8 X 25.04 M Rcc Girder On Jatani Side And 8 X 25.04 M Rcc Girder On Puri Side For Approach Portion, At Railway Km 464/31-33 Between Stations Motari And Kanas Road On Khurda-puri Line Under Khurda Road Division
    End Date 09 Jun 2026 12:00 PM 3 days left
    Location Khurda, Odisha
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    I. Construction Of Road Over Bridge (rob) With 1 X 63.400 M (camel Back Type Truss Girder) + 1 X 25.080 M (composite Girder) For Railway Portion In Lieu Of Lc No. 281 At Km 565/01-03, And Proposed Span Of 1 X 25.040 M + 11 X 20.040 M Rcc T-beam Girder On Nh-16 Side And 5 X 25.040 M Rcc T-beam Girder On Satrusola Side For Approach Portion Between Rambha (rba) And Humma (hma) Stations On The Howrah-visakhapatnam Main Line Under Khurda Road Division.ii. Construction Of Road Over Bridge (rob) With 1 X 60.00 M Camel Back Type Truss Girder + 1 X 24.00 M Composite Girder For Railway Portion At Km 572/11-13 In Lieu Of Lc No. 284, And Proposed Span Of 5 X 25.040 M Rcc T-beam Girder On Nh-16 Side And 7 X 25.040 M Rcc T-beam Girder On Palibandh Side For Approach Portion At Km 572/09-11 Between Ganjam (gam) And Chatrapur (cap) Stations On The Howrah-visakhapatnam Main Line Under Khurda Road Division.
    End Date 12 Jun 2026 12:00 PM 6 days left
    Location Visakhapatnam, Andhra Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    2 days left
    Supply Of Route Led Signal Lighting Unit 110v Ac,integrated Type Retrofittable In Existing Cls Housing And Compatible With Ac Led Ecr As Per Rdso Spec. No. Rdso/spn/153/2023 (rev.5.0) With Latest Amendments. [ Warranty Period: 60 Months After The Date Of Delivery ]
    End Date 08 Jun 2026 12:00 PM 2 days left
    Location Khurda, Odisha
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    2 days left
    Supply Of Metallised Carbon Strips Suitable For High Reach Pantographs With Add Provision As Per Spec. Rdso.2014/el/spec/0114, Rev.0, Dt. May 2014. [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 08 Jun 2026 12:00 PM 2 days left
    Location Mancheshwar, Odisha
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    Expired Today
    Construction Of Road Over Bridge (rob) (1 X 60.0 M) Camel Back Type Truss Girder For Railway Portion In Lieu Of Lc Cp-48, And Proposed Span Of 8 X 25.04 M Rcc Girder On Chatua Chowk Side And 7 X 25.04 M And 2 X 20.04 M Rcc Girder On Kujanga Side For Approach Portion At Railway Km 478/31-479/1 Between Rahama And Badabandha Stations On The Cuttack-paradeep Branch Line Under Khurda Road Division.
    End Date Expired
    Location Cuttack, Odisha
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    I. Construction Of Road Over Bridge (rob) With 1 X 60.00 M (camel Back Type Truss Girder) + 1 X 24.00 M (composite Girder) For Railway Portion At Km 566/15-17 In Lieu Of Lc No. 282, And Proposed Span Of 5 X 20.040 M + 4 X 25.040 M On Nh-16 Side And 4 X 25.040 M Rcc T-beam Girder On Gadahumma Side For Approach Portion At Km 566/01-03 Between Humma (hma) And Ganjam (gam) Stations On The Howrah-visakhapatnam Main Line Under Khurda Road Division.ii. Construction Of Road Over Bridge (rob) At Km 584/11-13 With Span Of - 21x 24.0m Rcc T-beam Girder+1x24.0m Composite Girder (nuapalli Village Side)+ 1x36.0m Composite Girder(railway Span)+ 1x24.0m Composite Girder + 6x 24.0m Rcc T-beam Girder(nh-16 Side), In Lieu Of Lc No. 294 At Km 584/15-17 ( 584/16-18) In Between Chatrapur (cap)-jagganathpur (jnp) Stations (khurda Road-palasa Section) On Howrah-vishakhapatnam Main Line Under Khurda Road Division.
    End Date 17 Jun 2026 12:00 PM 11 days left
    Location Visakhapatnam, Andhra Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    Expired Today
    Supply Of High Capacity Thermoplastic Polyester Elastomer (hytrel) Lower Washer, To Drawing/specification Rdso Specn. C-k409(rev-3) Of April 2023, Rdso Drg No. Cg-k4059, Alt-4 Mat. & Spec. As Per Drawing. [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date Expired
    Location Mancheshwar, Odisha
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    Expired Today
    Supply Of Ball Joint Roll Link, To Drawing/specification Fiat Drg. No. C53973 Reb Bred 8416 Rev. 03, Spec. No T.s.17.531.100.03, T.s.17.617.100.02, Mdts-148 Rev.01 And Mdts-122 Rev.03. [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date Expired
    Location Mancheshwar, Odisha
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    2 days left
    Supply Of Primary Vertical Damper (colour-ral 7012:basalt Grey), To Drawing/specification Rdso Spec. No. Rdso/cg-18005, Rev.02, Rdso Drg. No. Rdso/cg/drg/21047_alt-3. [ Warranty Period: 72 Months After The Date Of Delivery ]
    End Date 08 Jun 2026 12:00 PM 2 days left
    Location Mancheshwar, Odisha
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    Expired Today
    Supply Of Rubber Pad For Longitudinal Bump Stop, To Drawing / Specification Rcf Drg. No.lw 05109, Alt. No. C. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
    End Date Expired
    Location Mancheshwar, Odisha
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    Supply Of Boron Free Corrosion Inhibitor For Locomotive Engine Cooling Water System To Hp Power Kool Rr, Quantity 187 Ltrs Per Loco Set, As Per Rdso Report No.mp.misc-184, Rev.00 (dec'06) And Rdso's Specification No.mp2.99.00.03 (rev-latest) And Rdso Report No. Mp.mi-15 (revision-13), May'2023 [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 15 Jun 2026 12:00 PM 9 days left
    Location Visakhapatnam, Andhra Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    2 days left
    Supply Of Split Pin, Size- 6.3 Mm X 80 Mm, To Drawing / Specification Is:549/2005 (3rd Rev.). [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 08 Jun 2026 12:00 PM 2 days left
    Location Angul, Odisha
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    Supply Of Motor For Oil Cooler To Icf Specification No. Icf/elec/014, Rev.-a, Annexure B With Cs-01(motor Portion) And Icf Drg. No. Icf/sk 9-0-606, Alt.e. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
    End Date 09 Jun 2026 12:00 PM 3 days left
    Location Mancheshwar, Odisha
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    I. Construction Of Road Over Bridge (rob) At Rly Km 531/1- 3 Of (1 X 60.0m) Camel Back Type Truss Girder And 10 X 20.04m Rcc T-beam Girder On Nh-16 Side And 8 X 25.0m On Barkul Pantha Niwas Side For Approach Portion, In Lieu Of Lc No- 261 At Km 531/3-5, In Between Stations Balugaon (balu) & Chilka (clka) On Howrah- Visakhapatnam Main Line Under Khurda Road Division.ii. Construction Of Road Over Bridge (rob) With 1 X 60.00 M Camel Back Type Truss Girder For Railway Portion At Km 538/15-17 In Lieu Of Lc No. 267, And Proposed Span Of 8 X 20.04 M On Nh-16 Side And 7 X 25.04 M On Pathara Jetty Side For Approach Portion At Km 538/19-21 Between Chilka (clka) And Khallikote (klt) Stations On The Howrah-visakhapatnam Main Line Under Khurda Road Division.
    End Date 19 Jun 2026 12:00 PM 13 days left
    Location Visakhapatnam, Andhra Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    I. Construction Of Road Over Bridge (rob) (1 X 60.0m) Camel Back Type Truss Girder + (1 X 36.0m) Composite Girder For Rly. Portion In Lieu Of Lc No-224 And Proposed Span Of 6 X 25.04m Rcc Girder On Routapada & 10 X 25.04m Rcc Girder On Tentuliapada Side For Approach Portion, At Rly Km 488/3-5 In Between Stations Nirakarpur & Bhusanpur On Howrah- Visakhapatnam Main Line Under Khurda Road Division.ii. Construction Of Road Over Bridge (rob) (1 X 60.0 M Camel Back Type Truss Girder) For Railway Portion In Lieu Of Lc No. 244, And Proposed Span Of 19 X 25.04 M Rcc Girder On Nachuni Side And 15 X 25.04 M Rcc Girder On Baula Side For Approach Portion At Railway Km 512/21-23 Between Kuhuri And Gangadharpur Stations On The Howrah-visakhapatnam Main Line Under Khurda Road Division.
    End Date 19 Jun 2026 12:00 PM 13 days left
    Location Visakhapatnam, Andhra Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    Supply Of Split Pin, Size: 13 Mm X 125 Mm, To Drawing / Specification Is:549/2005 (3rd Rev.). [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 12 Jun 2026 12:00 PM 6 days left
    Location Mancheshwar, Odisha
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    2 days left
    Supply Of Vinyl Coated Upholstery Fabric (artificial Leather) For Ac Coaches, Width - 127 Cm, To Drawing / Specification Rdso/2008/cg-07, Rev-01 Of Sep-2023, As Per Rdso Approved Sample Code No. Alac-01. [ Warranty Period: 54 Months After The Date Of Delivery ] ]
    End Date 08 Jun 2026 12:00 PM 2 days left
    Location Mancheshwar, Odisha
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    Supply Of Paint Enamel Synthetic Exterior- Post Office Red Finishing(isc No- 538), To Drawing / Specification Is:8662/2024, Rdso Amendment No. 1 (revision - 0) For Pigment Content As An Additional Requirement To Is:8662-2024, With Additional Requirements Of Icf/md/spec-045, Issue Status - 02, Rev-03 Dated 14.06.2007 And Rdso Amendment No. 1a As An Additional Requirement. [ Warranty Period: 12 Months Afterthe Date Of Delivery ] ]
    End Date 16 Jun 2026 12:00 PM 10 days left
    Location Mancheshwar, Odisha
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    Supply Of Welding Electrodes Class M-5, Size 3.15 X 350 Mm To Rdso Approved Specn.no.irs:m- 28/2020, Code E18.8mnr26 As Per Is:5206-2003. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 10 Jun 2026 12:00 PM 4 days left
    Location Angul, Odisha
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    Supply Of Cloth Angola For Shirt (1.63 Mtrs.)/no Or Similar.:-i)the Yarn Used To Manufacture The Fabric Shall Be Made From Uniform And Intimate Blend Of 50-50 Poly Wool In Drab Shade. Ii)the Fabric Shall Be Uniformly Woven In Plain Wave And The Selvedge Shall Be Firm And Straight, The Fabric Shall Be Well Signed. The Fabric Shall Be Heat Set And Fully Shrunk. Iii)no Major Flaws (defects) In The Fabric Are Allowed. No Flag Allowance Will Be Accepted For The Major Flaw (defects) Iv)the Number Of Pieces To Be Selected At Random Form A Lot For Inspection Shall Be Accorded And Method Of Test As Per Is:8331 :2003. V)the Manufacturer Name Of Trade Mark Shall Be Woven On The Both Side Of Selvedge Throughout The Length Using Suitable Yarn. The Same Shall Be Clearly Visible Even After Processing/finishing. Vi)material To Be Supplied In A Cut Length Of Cloth For Cloth Shirting Angola 1.63 Mtrs. Each Number/piece Shall Be Packed In Button Down/seal Tape Poly Bag Printed With Railway Protection Force, East Coast Railway, Bhubaneswar. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 09 Jun 2026 12:00 PM 3 days left
    Location Bhubaneswar, Odisha
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    Supply Of Ball Joint Traction Lever, To Drawing/specification Fiat Drg. No. C53973 Ref Bred 8403 Rev.02, Spec. No. T.s.17.532.100.00, T.s.17.617.100.02, Mdts-148 Rev.01 And Mdts-122 Rev.03. Alt. No. Nil. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
    End Date 10 Jun 2026 12:00 PM 4 days left
    Location Mancheshwar, Odisha
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    Supply Of Jungle Boot;-1. Upper Shall Consist Of Polyester Viscose (pv) Fabric, Water-repellent As An Outer Layer And 100% Non- Woven Nylon (camarilla Type) Lining As Inner Layer. The Two Fabrics Shall Be Adheredtogether With Flexible Adhesive And Polyurethane Foam Of 5 Mm Thickness. Colour-olive Green,colour Of Sole And Toe Cap-black (for All Other Boots),blend Composition Of Polyester Viscose Fabric Water Repellent-polyester-80% Viscose-remainder.binding Material Of Polyester Blended Fabric, Black Having Blend Compositionof Polyester-67%, Cotton -33% & Confirming To Is:15852-2009 For Colour Fastness To Light, Washing & Ph Value. In Socks- In Sock Each Boot Shall Be Provided With A Detachable 4.0 Mm + 1.0 Mm Thick Full In Sock Of Compressed Molded Rubber Having Instep Arch Support And Adequate Ribs For Grip Ad Comfort. The Outer Layer Of The Knock Hill Be Covered With Cambrelle Type Material In Black Color. Toe Cap &stiffener Well Struck Heat Activated Thermoplastic Toe Puff & Stiffeners Of Minimum Thickness 1.5 Mm & 2 Mm Respectively Shall Beused.thread Polyester- Nil Lace Each Pair Of Boots Shall Be Provided With A Pair Of Nylon Black Laces Of Length160 +width 6 Cm. Thickness Of Sole In The Finished Condition, 1 Min. Thickness Of Sole 4mm 2. Cleat Height 2.5 Mm 3. Thickness Of Sole When Measured From Outside With Side Wall Forepart 20mm. 4.thickness Of Sole When Measured At Waist From Outside With Side Wall(mm)16, 5. Thickness Of Sole When Measured At Heel From Outside With Side Wall(mm) (min)35. 6. Mass The Mass Of One Pair Of Finished Boots Of Size 8 Shall Be750 To 850 Gms With An Increase Or Decrease Of 50 Gms For Each Bigger Or Smaller Size Respectively. 7-marking The Outsole Of The Boot Must Be Embossed /engraved With The Manufacturers Name Or His Recognized Trade Mark, Size, Month And Year Of Manufacture.8- Packing Each Pair Of Boots Shall Be Packed In Individual Boxes To Prevent Damage.
    End Date 10 Jun 2026 12:00 PM 4 days left
    Location Bhubaneswar, Odisha
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    2 days left
    Custom Bid for Services - Outsourcing of Repair of wagons during Examination of Rakes at Reception Yard (RYD) of Waltair division for a period of Two years
    End Date 08 Jun 2026 03:00 PM 2 days left
    Location Visakhapatnam, Andhra Pradesh
    Department Indian Railways
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    Supply Of Rubber Hose For Oxy Acetylene Welding & Cutting With Braided Textile Reinforcement In Redcolour, Size- 8 Mm X 7.5 Mtr In Length To Drawing / Specification Is:447/1988 (reaffirmed -2018). [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 18 Jun 2026 12:00 PM 12 days left
    Location Mancheshwar, Odisha
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    East Coast Railway
    Monthly Basis Cab & Taxi Hiring Services - MUV; Balance work for Hiring of 01 One Road vehicle like TATA Sumo- Mahindra Bolero or equivalent for a period of 19 months for ADEN-JDB; Outstation 24*7
    End Date 09 Jun 2026 03:00 PM 3 days left
    Location Visakhapatnam, Andhra Pradesh
    Department Indian Railways
    Amount Refer doc
    Amount: Refer doc

    Select a tender to view details