We are not affiliated with, endorsed by, authorised by, or otherwise connected in any manner whatsoever with the Government e-Marketplace (GeM) or the Government of India. We provide independent advisory and consultancy services only and do not act as or represent ourselves as agents, representatives of any government authority or government entity or government company.

    Indian Railway
    Showing 25 - 50 of 506
    Indian Railway
    Corrigendum : Supply Of Shaft Mounted Zr Cu Stamping Type Resistance Ring Design Of Rotor (scheme-i) For Tm Type 6fra 6068 For Wag-9/wap-7 Loco .to Drg No. Skel- 4881,alt.0 , To Spec.rdso/2007/el/ Spec/ 0060, Rev.0 & Str No: Clw/2012/3ph Tm Rotor/ Str/0003, Rev.1. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 23 Jul 2026 12:00 PM 3 days left
    Location Patiala, Punjab
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    Corrigendum : Supply Of Foot Step Light Elsk-252 Rev. A Spec:rdso/pe/spec/tl/0091-2016 (rev.1 Or Latest) [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 24 Jul 2026 12:00 PM 4 days left
    Location Varanasi, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    13 hours left
    Corrigendum : Supply, Installation And Commissioning Of Waterless Urinal System For Wap7 Locomotives As Per Rdso Functional Requirement Specification (frs No. Rdso/2023/el/frs/0034 (rev. 02) With The Stay & Mounting Arrangement For Electric Locomotives (rdso Ms No. Rdso/2025/el/ms/0508, Rev. 0 Dated 23.04.2025). Material: Ss-304 (for Toilet Module Main Structure Wall Sheets, Commode, Floor & Bowl). [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 20 Jul 2026 12:00 PM 13 hours left
    Location Patiala, Punjab
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    Corrigendum : Supply Of Clay Graphite Stopper As Per Rwp Specification No. Rwp/m/specn-1/019/2023 Alt [nil] And Drawing No. C/mo-16/13 Alt [h] [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
    End Date 24 Jul 2026 12:00 PM 4 days left
    Location Saran, Bihar
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    Corrigendum : Supply Of Master Controller (integral Cam Shaft Type) With Bkcp And Dowel Pin. As Perdrg.no. El/pt/0633 Alt R3 Specn: Nil This Is A Safety Item [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 27 Jul 2026 12:00 PM 7 days left
    Location Varanasi, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    1 day left
    Annual Comprehensive Maintenance Contract Of Two Years, For 13 Nos. Passenger Capacity Lift At Ratnagiri Station In Ratnagiri Region Of Konkan Railway.
    End Date 21 Jul 2026 12:00 PM 1 day left
    Location Ratnagiri, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    13 hours left
    Provision, Of Anti-climbing Devices Including Supply And Installation, In Monkey Prone Areas To Prevent Climbing Monkeys On Ohe Portals And Masts In Ratnagiri Region Of Konkan Railway.
    End Date 20 Jul 2026 12:00 PM 13 hours left
    Location Ratnagiri, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    13 hours left
    Repairs To Down Take Drainage Pipes Of Staff And Officers Quarters At Konkan Rail Vihar, Seawoods (west), Nerul, Navi Mumbai (computer No.71569 Rate Quoted Shall Be Excluding Gst. Gst Shall Be Payable As Applicable).
    End Date 20 Jul 2026 12:00 PM 13 hours left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    13 hours left
    "maintenance Of 2x25kv Power Supply Installations (psi) On New Unchdih (excl.) - New Bhaupur (excl.) Section Of Dfccil Including The Cheoki Link Line, Iradatganj Link Line, Sujatpur Link Line, Rooma Link Line And New Bhimsen Link Line For A Period Of 24 (twenty-four) Months Under Cgm/dfccil Prayagraj Unit."
    End Date 20 Jul 2026 12:00 PM 13 hours left
    Location Prayagraj, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    13 hours left
    Supply, Erection, Testing And Commissioning Of A) 132 Kv Transmission Lines Works With Lilo Arrangement For The Proposed 132 Kv/55kv Tss At Pusad And B) 132 Kv Transmission Line Works With Radial Feeder Arrangement For The Proposed 132 Kv/55kv Tss At Waranga In Connection With Construction Of New Bg Line With Railway Electrification Works Between Yavatmal-nanded Section In The State Of Maharashtra, India
    End Date 20 Jul 2026 12:00 PM 13 hours left
    Location Nagpur, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    13 hours left
    Supplyinstallation And Commissioning Of Hrd Power Pack Model No-p 630sg Make- Lukas/germany (warranty Period Upto 30 Months From The Date Of Delivery) [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 20 Jul 2026 12:00 PM 13 hours left
    Location Ratnagiri, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    1 day left
    Supply Of Stud Slip Ring 3/8-16x4" As Per Drg.no. 8310266 Alt Ab [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 21 Jul 2026 12:00 PM 1 day left
    Location Varanasi, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    13 hours left
    Supply Of Long Hood Structure Asm. (pl.no.-17544555) Alt. "c" And Specification (misc - 180, R-6) [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 20 Jul 2026 12:00 PM 13 hours left
    Location Varanasi, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    1 day left
    I) Replacement Of Damaged Asbestos Sheet Of Mumties And Backyard Of Quarters In Colony-i Area Including Covering Of Stair Case In Quarters 4,5,6 & 7 In Col-i Area Plw Patiala Ii) Laying Pathway In Stadium, Boring Of Shallow Tubewell Including Allied Works In Stadium Area Plw Patiala
    End Date 21 Jul 2026 12:00 PM 1 day left
    Location Patiala, Punjab
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    1 day left
    Provision Of Steel Flooring And Concrete Flooring In Main Plnat At Rwp/bela
    End Date 21 Jul 2026 12:00 PM 1 day left
    Location Saran, Bihar
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    Corrigendum : Design, Manufacture, Supply, Testing & Commissioning Of Points & Crossings Changingmachine (pccm) Along With Training Of Indian Railway Personnel. ]
    End Date 04 Aug 2026 12:00 PM 15 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    1 day left
    Repair/refurbishment And Installation Of Panel-i Unit Of Cnc Surface Wheel Lathe-156 In Wagon Workshop, Guntupalli.
    End Date 21 Jul 2026 12:00 PM 1 day left
    Location Prayagraj, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    1 day left
    Supply And Fixing Motorised Rolling Shutter With 02 Years Warranty And Further 5 Years Annual Maintenance Contract In Shop Floor, Store Building And Other Location At Rwp/bela.
    End Date 21 Jul 2026 12:00 PM 1 day left
    Location Saran, Bihar
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    1 day left
    Construction Of Office Block, Staff Rest Room And Sub-store For Melt, Mould Shop & Wfps At Rwp/bela
    End Date 21 Jul 2026 12:00 PM 1 day left
    Location Saran, Bihar
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    13 hours left
    Electrical Work Required For " Repair Of 1000 Kva Transformer Installed In Workshop Area, Plw/patiala"
    End Date 20 Jul 2026 12:00 PM 13 hours left
    Location Patiala, Punjab
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    1 day left
    Setting, Fitment, Full Welding, Riveting/lock Bolting Of Various Wagon Components At The Premises Of Wagon Workshop, Guntupalli.
    End Date 21 Jul 2026 12:00 PM 1 day left
    Location Prayagraj, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    2 days left
    Proposed Out Sourcing Of Usfd Testing Of Track (rails) For The Year 2026-28 In Vskp, Bza, Gnt & Gtl Divisions Of Scor:carrying Out Through Usfd Testing Of Running Rails & Welds (excluding Flangetesting) Including Level Crossings, Lead Portion Of Points And Crossings And Scabbed Rail Testing Of All Types Of Rails By Nbc (need Based Concept) Method Under Trafficconditions As Per Provisions Of Ir's "usfd Manual & Specifications For Ultrasonictesting Of Rails And Welds" With Latest Correction Slips & Related Instructions, Duly Marking Defects , Submission Of Daily Reports And Storing Backup Data As Specified & Directed With Contractor's Usfd Machine. Note: (the Srt/drt Machine Should Have Minimum Of 9 Probes B-scan (including 37 Degree Forward /backward Probe For Detecting Bolt Hole Cracks). With Contractors Usfd Machine.
    End Date 22 Jul 2026 12:00 PM 2 days left
    Location Multi City, Multi State
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    2 days left
    Tree Cutting/trimming Under Sse/works/vid In Ratnagiri Region Of Konkan Railway In The State Of Maharashtra.
    End Date 22 Jul 2026 12:00 PM 2 days left
    Location Ratnagiri, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    13 hours left
    Supply Of Stud Slip Ring 3/8-16x5-5/8" As Per Drg.no. 8345700 Alt Ab [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 20 Jul 2026 12:00 PM 13 hours left
    Location Varanasi, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Indian Railway
    1 day left
    E-tender No. Railtel/wr/e-tender/ot/2026-27/o&m/ofc Patch Replacement/01-04 Dt. 01.07.2026 Name Of Work: Trenching/hdd/clamping, Laying Of Duct, Blowing Of Optical Fiber Cable Through Ducts, Splicing, Testing & Commissioning For Optical Fiber Cable Patch Replacement At Various Sections Of Mumbai, Ahmedabad, Nagpur & Bhopal Territory Of Western Region.
    End Date 21 Jul 2026 12:00 PM 1 day left
    Location Ahmedabad, Gujarat
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc

    Select a tender to view details