Showing 50 - 75 of 361
National Highway Authority Of India
14 hours left
Empanelment Of Advertising Agencies At Nhai, Regional Office, Gandhinagar, Gujarat
End Date
20 Jul 2026 12:00 PM
14 hours left
Location
Gandhinagar, Gujarat
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
National Highway Authority Of India
Supervision Consultancy Services For Existing Nh-312 Of Janipur-omarpur-krishnagar-bongaon-bashirhat Upto Ghojadanha Section From Km 0.000 To Km 327.920 In The State Of West Bengal
End Date
06 Aug 2026 12:00 PM
17 days left
Location
Nadia, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
National Highway Authority Of India
Supervision Consultancy Services For Existing Nh-31 From Bihar/wb Border To Gazole/kadubari More Upto Junction Of Nh-12 From Km 59.697 To Km 0.000 In The State Of Wb
End Date
06 Aug 2026 12:00 PM
17 days left
Location
Malda, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
National Highway Authority Of India
Construction Of Balance Work Of Wsa At Ch 381.850 On Both Sides Lhs And Rhs Of 8 Lane Carriageway Of Dve Nh 148n From Junction With Sh 37a To Junction With Nh 76 Ch 359.170 To Ch 388.420 Package 13 On Risk And Cost Of Contractor On Item Rate Basis
End Date
23 Jul 2026 12:00 PM
3 days left
Location
Kota, Rajasthan
Department
Refer doc
Amount
₹ 38.37 Cr
Amount:
₹ 38.37 Cr
National Highway Authority Of India
Corrigendum : Supply, Installation, Testing, Commissioning, Operation And Maintenance Of Centralized Control And Monitoring System (ccms) For Street Lighting On National Highways Under Piu, Bongaigaon On Five (05) Year Contract Basis.
End Date
29 Jul 2026 12:00 PM
9 days left
Location
Kamrup, Assam
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
National Highway Authority Of India
Corrigendum : Permanent Rectification Of Accident Spots By Construction Of Minor Bridge At Barama, Construction Of Service Road Near Swahid Madan Rauta Civil Hospital Pathsala And 3 Nos Of Foot Over Bridges With Ramps Alongwith Both Sides Service Road Section
End Date
29 Jul 2026 12:00 PM
9 days left
Location
Kamrup, Assam
Department
Refer doc
Amount
₹ 17.89 Cr
Amount:
₹ 17.89 Cr
National Highway Authority Of India
Operation And Maintenance For 10 Years Of The 10.315 Km Puruliya Bypass Section Of Nh-32 Including Balance Work And Dismantling And Re-construction Of Defective Or Damaged Section In The State Of West Bengal
End Date
13 Aug 2026 12:00 PM
24 days left
Location
Puruliya, West Bengal
Department
Refer doc
Amount
₹ 32.22 Cr
Amount:
₹ 32.22 Cr
National Highway Authority Of India
Corrigendum : Maintenance Of Lanka-hathikali Section Of Nh-54e (new Nh-27) From Km 22.000 To Km 83.400 In The State Of Assam At The Risk And Cost Of The Pbmc Contractor , On Item Rate(percentage) Basis.
End Date
29 Jul 2026 12:00 PM
9 days left
Location
Kamrup, Assam
Department
Refer doc
Amount
₹ 53.39 Cr
Amount:
₹ 53.39 Cr
National Highway Authority Of India
Corrigendum : Maintenance Of Hathikali To Narimbangalo Section Of Nh 54e From Km 83.400 To Km 140.700 (new Nh-27) In The State Of Assam At The Risk And Cost Of The Pbmc Contractor , On Item Rate(percentage) Basis.
End Date
29 Jul 2026 12:00 PM
9 days left
Location
Kamrup, Assam
Department
Refer doc
Amount
₹ 94.58 Cr
Amount:
₹ 94.58 Cr
National Highway Authority Of India
Annual Maintenance Of Krishnagiri (km.0.000) To Tindivanam (km.182.182) Section Of Nh-77 In The State Of Tamil Nadu For A Period Of 1 (one) Year
End Date
28 Jul 2026 12:00 PM
8 days left
Location
Krishnagiri, Tamil Nadu
Department
Refer doc
Amount
₹ 15.72 Cr
Amount:
₹ 15.72 Cr
National Highway Authority Of India
Corrigendum : One Time Improvement Of Nh-9 (rohtak Road) From Punjabi Bagh Underpass Till Tikri Border In The State Of Delhi On Epc Mode
End Date
30 Jul 2026 12:00 PM
10 days left
Location
Delhi, Delhi
Department
Refer doc
Amount
₹ 341.48 Cr
Amount:
₹ 341.48 Cr
National Highway Authority Of India
Rectification Work On 8 Lane Access Controlled Expressway From Ch 359170 To Ch 388420 Pkg 13 Of Delhi Vadodara Greenfield Expressway Nh 148n In Rajasthan On Risk And Cost Of Contractor Item Rate Basis
End Date
11 Aug 2026 12:00 PM
22 days left
Location
Kota, Rajasthan
Department
Refer doc
Amount
₹ 25.92 Cr
Amount:
₹ 25.92 Cr
National Highway Authority Of India
Consultancy Services For Preparation Of The Detailed Project Report For 4 Laning Of The Section From Ghazipur In The State Of Uttar Pradesh To Chausa In The State Of Bihar.
End Date
17 Aug 2026 12:00 PM
28 days left
Location
Delhi, Delhi
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
National Highway Authority Of India
Construction Of Foot Over Bridges With Ramp And Stair Facility At 14 Nos. Of Locations Between Km 323.475 To Km 483.687, Etawah Chakeri (kanpur) Section Of Old Nh-2 (new Nh-19) In The State Of Uttar Pradesh On Epc Mode. 2nd Call
End Date
30 Jul 2026 12:00 PM
10 days left
Location
Lucknow, Uttar Pradesh
Department
Refer doc
Amount
₹ 32.36 Cr
Amount:
₹ 32.36 Cr
National Highway Authority Of India
Cs For Independent Engineer For Widening And Upgradation Of Existing Highway From Khagaria Design Ch.270.000 To Purnea Ch.413.529 Section Of Nh31-nh231 To 4 Lane With Paved Shoulder Under Nho On Bot (toll) In The State Of Bihar (2nd Call)
End Date
14 Aug 2026 12:00 PM
25 days left
Location
Delhi, Delhi
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
National Highway Authority Of India
Supervision Consultancy Services During Operation And Maintenance Stage Of 8 Lane Access Controlled Greenfield Delhi Vadodara Expressway Ne4 From Chainage Km 452.420 To Km 696.920 Pkg 17 To 25 In The State Of Madhya Pradesh
End Date
29 Jul 2026 12:00 PM
9 days left
Location
Ratlam, Madhya Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
National Highway Authority Of India
Consultancy Services For Preparation Of Detailed Project Report For Development Of Samba Mansar Udhampur Road To Four/six Lane Nh Standards In The Ut Of J And K.
End Date
29 Jul 2026 12:00 PM
9 days left
Location
Delhi, Delhi
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
National Highway Authority Of India
1 day left
Corrigendum : Cons Of 6l Gf Ac Indore Eastern Bypass From Km 113.000 On Nh 347bg Near Simrol/datoda End At Km 139.630 Nanded Pkg2 Of Indore Dist N Rehab N Upgrade Of Exist Nh52 From Km 18.000 Khandwa To Km 27.000 Ahilyapur From 4to6l Pkg2 Of Indore In Mp On Ham
End Date
21 Jul 2026 12:00 PM
1 day left
Location
Delhi, Delhi
Department
Refer doc
Amount
₹ 1,345.65 Cr
Amount:
₹ 1,345.65 Cr
National Highway Authority Of India
1 day left
Corrigendum : Construction Of 6l Gf Ac Indore Eastern Bypass Starting From Dc Km 64.000 Near Pirkaradiya Village And Ending At Dc Km 113.000 On Nh 347bg Near Village Simrol/datoda Pkg 1 Of Indore And Dewas District In Madhya Pradesh On Ham Mode. L 49.00 Km
End Date
21 Jul 2026 12:00 PM
1 day left
Location
Delhi, Delhi
Department
Refer doc
Amount
₹ 2,271.73 Cr
Amount:
₹ 2,271.73 Cr
National Highway Authority Of India
Corrigendum : Balance Works For Construction Of 4-lane Greenfield Delhi Amritsar Katra Exp. From Jun. With Ludhiana Malerkotla Road (sh11) Near Bhogiwal Village To Junction With Ludhiana Moga Road (nh5) (km 225.770 To Km 260.860)on Epc Mode Under Nh(o) In Punjab (pkg-08)
End Date
18 Aug 2026 12:00 PM
29 days left
Location
Delhi, Delhi
Department
Refer doc
Amount
₹ 1,110.23 Cr
Amount:
₹ 1,110.23 Cr
National Highway Authority Of India
Corrigendum : Bw Construction 4lane Gf Dake From Jalandhar Moga Road (nh703) To Jalandhar-kapurthala Road (nh703a) (km 303.900 To 319.400) And Jalandhar Moga Road (nh703) To Kapurthala Sultanpur Lodhi Road (nh703a) (km 0 To 24.000) In Punjab (p10)
End Date
18 Aug 2026 12:00 PM
29 days left
Location
Delhi, Delhi
Department
Refer doc
Amount
₹ 669.12 Cr
Amount:
₹ 669.12 Cr
National Highway Authority Of India
Corrigendum : Bw For Cons.of 4lane Greenfield Dake From Jun. With Jalandhar Kapurthala Road (nh703a) Near Khojewal Village To Junction With Amritsar Mehta Sri Hargobindpur Tanda Road (nh503a) (km 319.400 To 362.420) On Epc Mode Under Nh(o) In Punjab (pkg-11)
End Date
18 Aug 2026 12:00 PM
29 days left
Location
Delhi, Delhi
Department
Refer doc
Amount
₹ 1,273.99 Cr
Amount:
₹ 1,273.99 Cr
National Highway Authority Of India
Corrigendum : Cs For Ae For Supervision Of Construction Of 4l Of Southern Bypass To Jhansi And Connecting Link For Nh44 N Nh39 In The State Of Mp And Up On Epc Mode.
End Date
05 Aug 2026 12:00 PM
16 days left
Location
Delhi, Delhi
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
National Highway Authority Of India
Corrigendum : Const.of 4l Ac Gf Alignment Of Southern Bypass To Jhansi And Cl For Nh44 N Nh39 From Km.16.920 Of Nh44 Near Bangay Khas Vill.dc 0.030 And Terminating Forming T Junc At Km6.650 Of Nh39 Near Orchha Tigela Dc15.542 L15.572km In Mp And Up On Epc Mode
End Date
05 Aug 2026 12:00 PM
16 days left
Location
Delhi, Delhi
Department
Refer doc
Amount
₹ 427.29 Cr
Amount:
₹ 427.29 Cr
National Highway Authority Of India
Corrigendum : Construction And Upgradation Of Existing 2l.ps To 4l With Paved Shoulder Configuration From Km 0.000 (tansen Chowk Purani Chhawani Gwalior) To Km 77.000 (near Village Prithvipur) Of Nh719 In Madhya Pradesh On Hybrid Annuity Mode (package1).
End Date
06 Aug 2026 12:00 PM
17 days left
Location
Delhi, Delhi
Department
Refer doc
Amount
₹ 1,182.25 Cr
Amount:
₹ 1,182.25 Cr
Select a tender to view details