We are not affiliated with, endorsed by, authorised by, or otherwise connected in any manner whatsoever with the Government e-Marketplace (GeM) or the Government of India. We provide independent advisory and consultancy services only and do not act as or represent ourselves as agents, representatives of any government authority or government entity or government company.

    Uttar Pradesh
    Showing 50 - 75 of 10,000
    Directorate of Local Bodies UP
    2 days left
    Work Of Development Of Infrastructure Facilities In Shri Ram Janaki Temple Located In Ward No. 12 Sardar Bhagat Singh Nagar Of Nagar Panchayat Mathauli District Kushinagar.
    End Date 22 Jul 2026 12:00 PM 2 days left
    Location Kushinagar, Uttar Pradesh
    Department Refer doc
    Amount ₹ 1.25 Cr
    Amount: ₹ 1.25 Cr
    North Eastern Railway
    1 day left
    Ner-ljn Division:-providing Rcc Boundary Wall To Prevent Enchrochment & Tresspassing Bet Gkp-uvla Section From Km 390/5-385/0 Under Jurisdiction Of Sse/works/east/gkp.
    End Date 21 Jul 2026 12:00 PM 1 day left
    Location Lucknow, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    North Eastern Railway
    Ner-ljn Division:- Babhanan:- Provision Of Deep Tubewell With Rcc Over Head Tank (50000 Gallon) For Providing Drinking Water Facilities.
    End Date 24 Jul 2026 12:00 PM 4 days left
    Location Lucknow, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    North Eastern Railway
    Supply Of Cable Isi Marked 70 Sq. Mm Welding Cable With General Purpose Hofr Compound Covered With Aluminium Conductor As Per Is: 9857/90 (re- Affirmed95). [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 29 Jul 2026 12:00 PM 9 days left
    Location Gorakhpur, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    North Eastern Railway
    Supply Of Side Panel Sheet For Corrosion Repair Icf/rcf Coaches (2x450x2500 Mm Long) To Ner Gkps Drg. No. G/sd3-689, At. Nil, Item No. 1. Matl. & Specn. As Per Drg. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 23 Sept 2026 12:00 PM 65 days left
    Location Gorakhpur, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Northern Railway
    1 day left
    Supply Of Isolating Cock With Vent 1 / 2 '' Left Designed For Motor Coach And Trailer Coach. Drawing No: Escorts Drg. No.kb 1080 Or Recon / Ic - 4023 / 5 Or Wsf Part No. Ib / 101 / 5". [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
    End Date 21 Jul 2026 12:00 PM 1 day left
    Location Lucknow, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    North Eastern Railway
    Supply Of Constant Contact Polyurethane Side Bearer Pad Assembly Design B (2-rings) For Nlb Bogies As Per Firm's Own Rdso's Approved Drawing To Fit Within The Dimensional Envelope Of Rdso Drawing No. Wx-04057 And Conforming To Rdso's Spec Wd-38-misc-2004 (rev-3) Of Apr'25. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 15 Oct 2026 12:00 PM 87 days left
    Location IZATNAGAR, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    North Eastern Railway
    Engineering, Procurement & Construction (epc) Tender For Civil Engineering Works, Electrification Works And Signalling Works Of New Single Broad-gauge Line From Maharajganj (excluding) - Anand Nagar (excluding) Section (length: 25.800 Km) In Connection With Anand Nagar-ghughli New Bg Railway Line Project Of North Eastern Railway.
    End Date 24 Jul 2026 12:00 PM 4 days left
    Location Gorakhpur, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    North Eastern Railway
    14 hours left
    Supply Of Bush Size-45x35x32mm, As Per Clw Drawing No. 03/4/19/34 Alt- 3, Ref-5. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 20 Jul 2026 12:00 PM 14 hours left
    Location Gorakhpur, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    North Eastern Railway
    Supply Of Set Of Gasket For Oil Circuit Joint Of Transformer Type Hett-5400 As Per Drg. No. A3/04/cnb/1898/5133/gk/alt. C,one Set Consisting Of 06 Items : 18 Nos. (1) Rubber Gasket For Mph Vent Nipple Qty. 04 Nos. (2) Rubber Gasket For Conservator 3 Way Cock Connection Qty.04 Nos. (3) Rubberised Corkgasket For Radiator Priming Pipe Joint Qty. 02 Nos.(4) Rubberised Cork Gasket For Radiator Flang Qty. 02 Nos. (5) Rubberised Cork Gasket For Radiator Bend Qty. 02 Nos.. (6) Rubberised Cork Gasket For Mph Flange Qty. 04 Nos. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 05 Aug 2026 12:00 PM 16 days left
    Location IZATNAGAR, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    North Eastern Railway
    Supply Of Pressure Switch For 25kv Ac Electric Locomotive, Class Wag-7/wap-4, Model Type Rt-200-sbx Pressure Range 0.2 To 6 Kg/cm Square Differential 0.25 To 1.2 Kg/cm?, Max. Pressure 25 Kg/cm Square As Per Clw Spec. No.clw/es/s-24, Alt.-i Or Latest. [ Warrantyperiod: 30 Months After The Date Of Delivery ] ]
    End Date 05 Aug 2026 12:00 PM 16 days left
    Location Gorakhpur, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    North Eastern Railway
    Supply Of Gravity Cock 1/2 Inch Chrome Plated To Rcf Drg. No. Cc63933, Alt. C. Mat. & Spec. As Per Drg. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 11 Aug 2026 12:00 PM 22 days left
    Location Gorakhpur, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    North Eastern Railway
    Supply Of Overhauling Kit For Stop Cock Of Electric Ccb To (part No.i188738) And Kbil Kit No.xki/kit/02483 Of M/s. Kbil Brake System For 3-phase Locomotive, Consisting Of 16 Items In 22 Nos Per Kit, As Per Annexure [ Warranty Period: 30 Months After The Date Of Delivery ]]
    End Date 13 Aug 2026 12:00 PM 24 days left
    Location Gorakhpur, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    North Eastern Railway
    Supply Of Self Lubricating Polyester Resin Based Composite Brake Gear Bush To Rdso Spec. No. C-k605 (rev. 3) Or Injection Moulded High Performance Polyamide (hppa) Brake Gear Bush To Rdso Spec.no. Rdso/2009/cg-17(rev. 3) Size- Phy 70 X Phy 57 X 25.5 Mm Long For Bg Coaches To Rdso Drg. No. Sk - 81039 Alt. 15, Item 7. [ Warranty Period: 24 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
    End Date 30 Jul 2026 12:00 PM 10 days left
    Location Gorakhpur, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    North Eastern Railway
    Supply Of Sponge Celluler Eva Strip, Thick-06 Mm, Width-20mm & Length 1000mm For Main Door & Windows Of Wap-4 & Wag-7 Loco As Per Drg. No.a4/06/cnb/2187/5146/gk, Alt.-a (item Sr. No. 3). [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 07 Aug 2026 12:00 PM 18 days left
    Location Gorakhpur, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    North Eastern Railway
    Supply Of Aoh Kit For Am-12 Type Pantograph. Each Kit Consisting Of 71 Nos. Items As Attached Annexure-a. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 11 Aug 2026 12:00 PM 22 days left
    Location IZATNAGAR, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Northern Railway
    14 hours left
    Supply Of Hex. Head Bolt M16 X 170 (h.t) For Lhb/fiat Bogie. Specification No.:- For Bolt Is: 1364 (pt.1)/2023(sixth Rev.) With Property Class-10.9 To Is:1367 (pt.-3)/2017 (fifth Rev.),ce, Coating As Per Rcf/mdts-057. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 20 Jul 2026 12:00 PM 14 hours left
    Location Lucknow, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Northern Railway
    14 hours left
    Supply Of Railway Carriage Fan 140 Volts Ac, 50hz, Fixed Type, 450 Mm Sweep With Stainless Steel Crash Worthy Guard, Without Regulator. (material To Be Supplied In Assembled Condition). Confirming To Rdso Spec. No. Rdso/pe/spec/tl-0050-2010, Rev. 1. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
    End Date 20 Jul 2026 12:00 PM 14 hours left
    Location Lucknow, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Northern Railway
    Supply ,installation, Testing And Commission Of Vfd Drive 7.5 Kw Operating Voltage-415 Volt Make- Yaskawa, Siemens, Schneider [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 28 Jul 2026 12:00 PM 8 days left
    Location Ghaziabad, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Northern Railway
    Supply Of B Check Kit Nt855r/nta855r As Per Cummins Part No Kit 3238528 ; Make - Cummins Kit Consisting Of Items As Per List Attached [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 28 Jul 2026 12:00 PM 8 days left
    Location Ghaziabad, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Northern Railway
    14 hours left
    Supply Of Sheet Metal Screw 10x 25 Mm, Is :7173-74. [ Warranty Period: 30 Months After Thedate Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
    End Date 20 Jul 2026 12:00 PM 14 hours left
    Location Ghaziabad, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    North Eastern Railway
    14 hours left
    Supply Of Armature Commutature Deburing Brush As Per Drg. No.a1/2010/cnb/2345/5103/tm [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 20 Jul 2026 12:00 PM 14 hours left
    Location Gorakhpur, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    North Eastern Railway
    Supply Of Coupler Body & Shank Wear Plate For Non Transition Cbc For Bogie Wagon To Rdso Drg. No. Sk-62724, Alt.-31, Item No.1 & 10 And Conforming To Rdso Spec. No.-wd-70-bd-2010 (rev.-4) Of Nov-24.
    End Date 29 Sept 2026 12:00 PM 71 days left
    Location IZATNAGAR, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    North Eastern Railway
    Supply Of Rear Cover For Axle Box (gravity Die Casting & Finish Machined) Etc.
    End Date 25 Aug 2026 12:00 PM 36 days left
    Location Gorakhpur, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    North Eastern Railway
    Supply Of Holding Magnet Valve
    End Date 12 Oct 2026 12:00 PM 84 days left
    Location Gorakhpur, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc

    Select a tender to view details