Western Railway
Madhya Pradesh | Ratlam |
- Download
Time left to bid
4
Days8
Hours22
MinutesTender Roadmap
Publish Date
07 Nov 2024
Tender is published for seller Participation.
Bid Submission End Date
28 Nov 2024
Last day to participate Tender on GeM platform.
Evaluation Date
28 Nov 2024
Technical committe will evaluate Bid and Open Results.
Earnest Amount | |||||||||||||||||||||||||||||
XXXXXXX | |||||||||||||||||||||||||||||
Tender Amount | |||||||||||||||||||||||||||||
XXXXXXX | |||||||||||||||||||||||||||||
Department | |||||||||||||||||||||||||||||
Indian Railways | |||||||||||||||||||||||||||||
Item Category | |||||||||||||||||||||||||||||
Title1 Title2 Title3 Title4 Title5 Title6 Title7 Title8 Title9 Title10 Title11 Title12 Title13 Title14 Title15 Title16 GeMARPTS / Searched Strings used in GeMARPTS SUPPLY AND INSTALLATION 1KVA/168VAH ONLINE UPS Single Phase PURE SINOSIDAL with 1 hour Back up AND ALL ACCESSORIES REQUIRED FOR INSTALLATIONS MAKE APC MICROTEK LUMINOUS ONLY. GeMARPTS / Searched Result generated in GeMARPTS Category not available on GeM for the text string uploaded by the buyer / Relevant Categories selected for notification Online UPS V2 Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 19 Lakh s MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No | |||||||||||||||||||||||||||||
Purchaser Address | |||||||||||||||||||||||||||||
457001,SR Divisional Materials Manager, Divisional Railway Manager Office, Do Batti, RATLAM M P | |||||||||||||||||||||||||||||
Work Description | |||||||||||||||||||||||||||||
1092;ONLINE UPS 1 KVA UPS AS PER SPECIFICATION 1 Nos MAKE APC, MICROTEK, LUMINOUS, GENUS POWER, AMRON SUPPLY OF Standard Tool kit FOR SIGNAL UTILITY 1 Set SHIFTING WORK AS PER ANNEXURE ATTECHED. AC/DC true RMS, low current clamp meter as per 1 Nos specification attached Make KOICO, HIOKI, FLUKE, MOTWANI, PHILIPS, Smoke detector spray Make Aerol or Similer Consignee SR. SECTION ENGINEER (EXCH. RATLAM Delivery Location OFFICE OF SR. SECTION ENGINEER (EXCH.) RATLAM OFFICE OF SENIOR SECTION ENGINEER (SIGNAL)N DAHOD SENIOR SECTION ENGINEER (SIGNAL)N DAHOD SENIOR SECTION ENGINEER (SIGNAL)N OFFICE OF SENIOR SECTION ENGINEER (SIGNAL)N DAHOD DAHOD 104 Nos SENIOR SECTION ENGINEER (SIGNAL) RATLAM OFFICE OF SENIOR SECTION ENGINEER (SIGNAL) RATLAM ONLINE UPS OF RATING 2.0 KVA WITH BATTERY 1 Nos OF BACKUPTIME 120 MINUTE APC, MICROTEK, LUMINOUS AS PER SPECIFICATION Hand Driven Generator type Four terminal Analog 1 Nos Earth Resistance Tester (Range: 0-10-100 Ohm) as per Technical Specification described in Annexure. Test lead, Carrying Case with Manufacturer Warranty Certificate and calibration Certificate to be provided along with supply. Make: CIE/WACO/MEGGER only Firm's offer: Supply of 1 KVA Portable Generator and Power 2 Set generator Petrol start, Kerosene run and wth all accessories. Make: Himalaya Power machine MFG Co.Model:GE-4000KPortable Fuel Multi Generator or superior. Inspection by Consignee. SUPPLY OF TRACK CIRCUIT BATTERY CHARGING 32 nos MONITORING UNIT FOR DC, TC WITH AUDIO VISUAL ALARM GENERATION ALONG WITH POTENTIAL FREE CONTACT FOR CONNECTING WITH DATA LOGGER
|
|||||||||||||||||||||||||||||
Eligibility | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
My Evaluation Notes | |||||||||||||||||||||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.
CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.