Hindustan Petroleum Corporation Ltd
Andhra Pradesh | Chittoor |
- Download
Time left to bid
1
Days12
Hours47
MinutesTender Roadmap
Publish Date
14 Dec 2024
Tender is published for seller Participation.
Bid Submission End Date
24 Dec 2024
Last day to participate Tender on GeM platform.
Evaluation Date
24 Dec 2024
Technical committe will evaluate Bid and Open Results.
Earnest Amount | |||||||||||||||||||||||||||||
XXXXXXX | |||||||||||||||||||||||||||||
Tender Amount | |||||||||||||||||||||||||||||
XXXXXXX | |||||||||||||||||||||||||||||
Department | |||||||||||||||||||||||||||||
Item Category | |||||||||||||||||||||||||||||
Supply of DIGITAL PRESSURE TRANSMITTERS 0 to 100 kg per sqcm range Supply of DIGITAL DIFFERENTIAL PRESSURE TRANSMITTERS 0 to 5 Kg per sqcm range Supply of DIGITAL PRESSURE TRANSMITTERS 0 to 20 Kg per sqcm range Supply of DIGITAL TEMPERATURE TRANSMITTERS 0 to 80 dec or 0 to 100 deg c Supply of Digital Insulator Tester Supply of Digital Multimeter Supply of Sound level or db level or noise level meter GeMARPTS / Searched Strings used in GeMARPTS MEASURING EQUIPMENTS SUPPLY-VVSPLVDPL GeMARPTS / Searched Result generated in GeMARPTS HELIBORNE EQUIPMENTS MHA Resistance Monitoring Device Measuring Spoon Measuring Tape Measuring Travelling Microscope as per IS 4329 Measuring Mug / Cup Live Remote Temperature and Humidity Monitoring and Alert System Measuring Tape V2 Laboratory Measuring Scoop Measuring Instrument BHEL / Relevant Categories selected for notification Digital Multimeter as per IS 9000 Digital Pressure Transmitter Temperature Transmitter | |||||||||||||||||||||||||||||
Purchaser Address | |||||||||||||||||||||||||||||
517236,HINDUSTAN PETROLEUM CORPN LTD VIJAYAWADA DHARMAPURI PIPELINE, KALAKADA PUMPING STATION, KONA SINGANODDUPALLE ROAD, DEVALAPALLE, KALAKADA MANDAL, CHITTOOR 517236 ANDHRA PRADESH | |||||||||||||||||||||||||||||
Work Description | |||||||||||||||||||||||||||||
SUPPLY OF MEASURING EQUIPMENTS SUPPLY VVSPL AND;10; Supply of DIGITAL PRESSURE TRANSMITTERS 0 to 100 kg per sqcm range Supply of DIGITAL DIFFERENTIAL PRESSURE TRANSMITTERS 0 to 5 Kg per sqcm range Supply of DIGITAL PRESSURE TRANSMITTERS 0 to 20 Kg per sqcm range Supply of DIGITAL TEMPERATURE TRANSMITTERS 0 to 80 dec or 0 to 100 deg c Supply of Digital Insulator Tester Supply of Digital Multimeter Supply of Sound level or db level or noise level meter GeMARPTS / Searched Strings used in GeMARPTS MEASURING EQUIPMENTS SUPPLY-VVSPLVDPL GeMARPTS / Searched Result generated in GeMARPTS HELIBORNE EQUIPMENTS MHA Resistance Monitoring Device Measuring Spoon Measuring Tape Measuring Travelling Microscope as per IS 4329 Measuring Mug / Cup Live Remote Temperature and Humidity Monitoring and Alert System Measuring Tape V2 Laboratory Measuring Scoop Measuring Instrument BHEL / Relevant Categories selected for notification Digital Multimeter as per IS 9000 Digital Pressure Transmitter Temperature Transmitter
|
|||||||||||||||||||||||||||||
Eligibility | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
My Evaluation Notes | |||||||||||||||||||||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.
CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.