Central Manufacturing Technology Institute
Karnataka | Bengaluru Urban |
- Download
Time left to bid
13
Days20
Hours2
MinutesTender Roadmap
Publish Date
16 Dec 2024
Tender is published for seller Participation.
Bid Submission End Date
06 Jan 2025
Last day to participate Tender on GeM platform.
Evaluation Date
06 Jan 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | |||||||||||||||||||||||||||||
XXXXXXX | |||||||||||||||||||||||||||||
Tender Amount | |||||||||||||||||||||||||||||
XXXXXXX | |||||||||||||||||||||||||||||
Department | |||||||||||||||||||||||||||||
Department Of Heavy Industry | |||||||||||||||||||||||||||||
Item Category | |||||||||||||||||||||||||||||
FTIR Spectrometer Should collect IR spectrum in different modes such as transmittance absorbance pellets stand- alone films and ATR mode Spectral range- Mid IR - 7800 to 350 cm-1 Spectral resolution- At least 0.6 cm-1 or lower in Mid IR range without using any external J-stop card Wavenumber precision- lower than 0.002 cm-1 at 2000 cm- 1 or better Wavenumber accuracy- lower than 0.06 cm-1 at 2000 cm-1 or better Signal to Noise ratio Beam splitter Detectors ATR Assembly- Single-reflection ATR with diamond Calibration standards and performance verification Sample holder Spectral library Software for data acquisition processing and evaluation. PC requirement Work Bench for the system Warranty GeMARPTS / Searched Strings used in GeMARPTS Fourier Transform infrared Spectroscopy GeMARPTS / Searched Result generated in GeMARPTS Infrared Spectroscopy System Fourier Transform Infra Red FTIR Spectrometer / Relevant Categories selected for notification Fourier Transform Infra Red FTIR Spectrometer | |||||||||||||||||||||||||||||
Purchaser Address | |||||||||||||||||||||||||||||
560022,Central Manufacturing Technology Institute, Tumkur Road, Yeshwanthpur post, | |||||||||||||||||||||||||||||
Work Description | |||||||||||||||||||||||||||||
FTIR System;18; FTIR Spectrometer Should collect IR spectrum in different modes such as transmittance absorbance pellets stand- alone films and ATR mode Spectral range- Mid IR - 7800 to 350 cm-1 Spectral resolution- At least 0.6 cm-1 or lower in Mid IR range without using any external J-stop card Wavenumber precision- lower than 0.002 cm-1 at 2000 cm- 1 or better Wavenumber accuracy- lower than 0.06 cm-1 at 2000 cm-1 or better Signal to Noise ratio Beam splitter Detectors ATR Assembly- Single-reflection ATR with diamond Calibration standards and performance verification Sample holder Spectral library Software for data acquisition processing and evaluation. PC requirement Work Bench for the system Warranty GeMARPTS / Searched Strings used in GeMARPTS Fourier Transform infrared Spectroscopy GeMARPTS / Searched Result generated in GeMARPTS Infrared Spectroscopy System Fourier Transform Infra Red FTIR Spectrometer / Relevant Categories selected for notification Fourier Transform Infra Red FTIR Spectrometer
|
|||||||||||||||||||||||||||||
Eligibility | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
My Evaluation Notes | |||||||||||||||||||||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.
CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.