Haryana | Rohtak |
- Download
Tender Roadmap
Publish Date
12 Apr 2024
Tender is published for seller Participation.
Bid Submission End Date
07 May 2024
Last day to participate Tender on GeM platform.
Evaluation Date
07 May 2024
Technical committe will evaluate Bid and Open Results.
Earnest Amount | |||||||||||||||||||||||||||||
XXXXXXX | |||||||||||||||||||||||||||||
Tender Amount | |||||||||||||||||||||||||||||
XXXXXXX | |||||||||||||||||||||||||||||
Department | |||||||||||||||||||||||||||||
Industrial Training And Vocational Education Department | |||||||||||||||||||||||||||||
Item Category | |||||||||||||||||||||||||||||
LED BLUB 18 WATT Q3 LED BLUB 15 WATT Q3 LED BLUB 9 WATT Q3 CAPACITER 2-2.5 Q3 CELL 1.5 V Q3 A4 RIM PAPER Q3 LEGAL RIM Q3 BATTERY 9V Q3 tube choke 40 watt Q3 WOODEN BOARD 7INCH X4 INCH Q3 SUNMICA SHEET 7 X4 Inch Q3 Sunmica sheet 8 inch x 5 inch Q3 OLD DHOTI Q3 PVC TAPE Q3 SOCKET 6 AMP Q3 SOCKET 15 AMP Q3 solder Wire 60/40 18ghz Q3 Drill Bitt Wall 6mm Q3 Drill Bitt Wooden 4mm Q3 PUSH BUTTON Q3 DESOLDERING WICK 3 METER Q3 Relays 12 Volt Q3 Inductor 1 to 50 micro Hanery mix Q3 IGBT Q3 SMD Resistance Mix Value Q3 SMD Capacitor Mix Value Q3 SMD IC555 Q3 SMD UJT Q3 SMD MOSFET Q3 SMD SCR Q3 IC 8051 MICRO CONTROLLER Q3 FIBER Optical Cable 4 Core Q3 Bridge Rectifier Phase Square Q3 Networking Cable Q3 Pen Drive 16 GB Q3 Stapler BIG Size Q3 Cotton 500 gram Q3 4 White Patti Roll Q3 Savlon 100 ML Q3 Betadine Tube 20gm Q3 Needles and Syringe 5ML Q3 Gloves Disposal For Medical Purpose Q3 Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 10 Lakh s OEM Average Turnover Last 3 Years/ 3 3 10 Lakh s Years of Past Experience Required for same/similar service/ 23 23 3 Year s | |||||||||||||||||||||||||||||
Purchaser Address | |||||||||||||||||||||||||||||
124001,Sector 5 | |||||||||||||||||||||||||||||
Work Description | |||||||||||||||||||||||||||||
679; LED BLUB 18 WATT Q3 LED BLUB 15 WATT Q3 LED BLUB 9 WATT Q3 CAPACITER 2-2.5 Q3 CELL 1.5 V Q3 A4 RIM PAPER Q3 LEGAL RIM Q3 BATTERY 9V Q3 tube choke 40 watt Q3 WOODEN BOARD 7INCH X4 INCH Q3 SUNMICA SHEET 7 X4 Inch Q3 Sunmica sheet 8 inch x 5 inch Q3 OLD DHOTI Q3 PVC TAPE Q3 SOCKET 6 AMP Q3 SOCKET 15 AMP Q3 solder Wire 60/40 18ghz Q3 Drill Bitt Wall 6mm Q3 Drill Bitt Wooden 4mm Q3 PUSH BUTTON Q3 DESOLDERING WICK 3 METER Q3 Relays 12 Volt Q3 Inductor 1 to 50 micro Hanery mix Q3 IGBT Q3 SMD Resistance Mix Value Q3 SMD Capacitor Mix Value Q3 SMD IC555 Q3 SMD UJT Q3 SMD MOSFET Q3 SMD SCR Q3 IC 8051 MICRO CONTROLLER Q3 FIBER Optical Cable 4 Core Q3 Bridge Rectifier Phase Square Q3 Networking Cable Q3 Pen Drive 16 GB Q3 Stapler BIG Size Q3 Cotton 500 gram Q3 4 White Patti Roll Q3 Savlon 100 ML Q3 Betadine Tube 20gm Q3 Needles and Syringe 5ML Q3 Gloves Disposal For Medical Purpose Q3 Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 10 Lakh s OEM Average Turnover Last 3 Years/ 3 3 10 Lakh s Years of Past Experience Required for same/similar service/ 23 23 3 Year s
|
|||||||||||||||||||||||||||||
Eligibility | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
My Evaluation Notes | |||||||||||||||||||||||||||||
|
Get a credit limit with Kredmint
Kredmint lets you order now & pay later as per convenience.
Check Now
Check Now
Check Now
Avail funding now
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.