- Splitting
- Advisory Bank
- Reserved for MII
- Reserved for MSE
- Bid to RA Enabled
- Evaluation Method
- MSE Purchase Preference
- MSE Exemption
Splitting
Advisory Bank
Reserved for MII
Reserved for MSE
Bid to RA Enabled
Evaluation Method
MSE Purchase Preference
MSE Exemption
Showing 1 to 25 of 10,000 results.
Indian Air Force
Procurement Of Spares For Su-30 Mki Aircraft - Spring, 1/4 Unf Wire Locking Bolt, Lead Bonding, Hex Hd Bolt, 8x32 Unc Crst Washer, Pin Split, P Clip, Bolt Hex Hd, 10-32 Unf, O Ring, Bolt Hex Hd, 10-32 Unf, Bolt Hex Hd, 10-32 Unf, Seal O Ring, Connector Cover (frl)
Eastern Railway
Supply Of Set Of Hex. Head Bolts And Screws For Hitachi Tr. Motor Consisting Of 4 Items. [i ]
South Eastern Railway
Supply Of Traction Centre Elastic Joint Drawing No. : Fiat Drg. No. C53973 Ref Bred 8397 R Ev.-02. Matl.& Specn : To Be Read With Technical Specn.no.17.533 100 00, Technical Specn.no. 17.617 100 02, And Mdts-148 Rev-01, Mdts-122 Rev-03. [ Warranty Period: 30 Months After The Da Te Of Delivery ]
Modern Coach Factory Raebareli
Supply Of 70ah, 110v, Vrla Maintenance Free Mono Block Battery Set (with 9 Modules Of 12v Each), Factory Precharged As Per Spec. No. Rdso/pe/spec/ac/0009-2014, Rev-2. Packing Instruction - Spi182 [ Warranty Period: 30 Months After The Date Of Delivery ]
South Eastern Railway
Supply Of Safety Wire Rope Assembly For Fiat Ir Bogie. Drawing No. : Rcf Drawing No. Lw05105, Alt. - Nil. Matl.& Specn : As Per Drawing. [ Warranty Period: 30 Months After The Date Of Delivery ]
Northern Railway
Supply Of Connecting Rod / Crank Shaft With Bearing (07 03 0067a)for Elgi Compressor Model Rr 20100 Pt. No. A07 0078. [ Warranty Period: 30 Months After The Date Of Delivery ]
Northern Railway
Supply Of Ultra Light Weight Triangular Shaped, Self- Sharpening Cubitron Mineral Grits Grinding Dis C Size 180x2.6x22.23 Mm Grit 36 Plus For Pull, Cutting And Finishing In One Step Without Burn Mark.one Set Supporting Pads Consisting Of 3 Nos. In Size 7 Inch, 5 Inch And 4 Inch Operation To Be Provided With Every 25 No. Of Grinding Disc. [ Warranty Period: 30 Months After The Date Of Delivery ]
Advanced Weapons And Equipment India Limited
Implementation And Maintenance Of Centralized Erp System In Aweil Hq And Its Units As Per Scope Of Work
Eastern Railway
Supply Of Bottom Arching Horn Of E.p Contactors (t1 To T9) For Bhel Emu's. As Per Spec N. Kpa Drg.no.er/kpa/el/ct.3he.1762b Or M/s Bhel Drg No 35801130045p1. [ Warranty Period: 30 Months After The Date Of Delivery ]
Northern Railway
Supply Of Tbu Brake Block For Wag-9 Loco As Per Clw Drg No. 1209-01-316-037 Alt-1 Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ]
South Eastern Railway
Supply Of Gear Case Assembly For Wap4 & Wag7 Locos Provided With Hitachi Tm For Hs15250a To Clw's Drg. No. 05/1/13/166 (alt. 15) And Modified Spring Loaded Oil Filter Cover To Cee's Drg. No. Loc O/3/gp/064. [ Warranty Period: 30 Months After The Date Of Delivery ]
North Western Railway
Supply Of Brush Paint And Varnish Flat 75 Mm Grade-i, Rubber Set To Is:384/2023 (part-1) And Bristle T O Is:1844/1993 Amndt.1, Soft Type, Special Quality, &rdso Guide Line As Per Rdso Letter M&c/pcn/1/42 Date D- 01.10.2004 ]
NORTH EAST FRONTIER RAILWAY
Supply Of Set Of Side Buffer Assembly (helical Spring Type)(lh & Rh) For Lhb Coaches [ One Set Consist Of 01 (one) Left Hand Buffers And 01 (one) Right Hand Buffers ]
South Eastern Railway
Supply Of Earthing Cable Complete 95 Sq. Mm (short) For Lhb Coach. Drawing No. Rcf Drawing No. Lw71249, Alt.- C. Material & Specification: As Per Drawing. [ Warranty Period: 30 Months After The Dat E Of Delivery ]
INTEGRAL COACH FACTORY
One Coach Set Of Roof, Sidewall And End Wall For Amrit Bharat Lws/pp2 (754) 1. Roof Ass Embly To Drg No 75416001, Alt 'a' - 1 No 2. End Roof Assembly To Drg No 97216008, Alt 'a' - 2 Nos 3. Sid E Wall To Drg No 75414001, Alt 'a' - 1 No 4. End Wall To Drg No 75415001, Alt 'e' - 2 Nos Welding Pin Arr Angement To Drg No 58110037, Alt 'nil' Had To Be Assembled On Roof And Sidewall. The Firm Shall Fulfil The Requirement As Per Icf/md/specn.200, Issue Status 01, Rev 04 With Amendment No 01. The F Irm Shall Fulfil The Requirement As Per Icf/md/spec-315,issue Status-01, Rev.00 Firm Has To Supply Roof And Sidewall Without Applying Etch Primer. To Be Supplied In Coach Set Special Condition : This Is A New Build And There Will Be Minor Changes In Drawing. Firm Shall Obtain Final D Rawing From Icf Before Start Of Manufcturing. Packing For Roof And Side Wall As Per Icf /j&t/misc-2201, Alt "e" Safety Instruction As Per Icf/j&t/sk-1867, Alt 'nil' Packing For End Wa Ll As Per Drg.icf/j&t/sk 1809, Alt "a". [safety Item ]
Northern Railway
Supply Of Spring Plank For Blc Wagon .drawing No. Contr-9404-s/4, Alt-13, Item No:-1 Spec . No Contr-lccf20( C )-96 (rev-2 Of Dec-06) With Amend. No.2 Of Sept. 2016. [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ]
South Eastern Railway
Supply Of Yoke Pin For Up-graded Ht-cbc.drawing No. : Rdso's Drg. No. Sk-62724, Alt. 31 , Item N O. 12.material And Specification : Rdso's Spec. No. Wd-70-bd-10, (rev. 4) Of November 2024. [ Warra Nty Period: 72 Months After The Date Of Delivery ]
Eastern Railway
Supply Of Elgi Make Disc Type Coupling As Per Elgi Part No. 070310410 Or As Per Drg No . 01-102- 121 A Of Panesar Make For Compressor Type Trc-1000 Mn Ug As Per M/s. Elgi Part No. 070310410 O R As Per Drg No . 01-102-121 A Of Panesar [ Warranty Period: 30 Months After The Date Of Delivery ]
Indian Railway
Corrigendum : Supply Of Cab Heater/ventilation Assly (cat. No. P/0/0136) To Clw Spec No. Clw/es/3/010 9 Alt.- G, And Abb Drg. Nos. (i) 182-00012 (ii) 182-00013 (iii) 182-00045 (iv) 182-00250 (v) Ia086-0 0455 (vi) Ia086-00458 With Str No. Clw/2023/eldo/e/str/172 Rev.- 0. Note: All Hardwares Are To Be Used In Cab Heater Are Made Of Sst Should Procured From Approved Suppliers Per Clw's Latest Approved Vendor List For 3 Phase Locomotive. [ Warranty Period: 30 Mon Ths After The Date Of Delivery ]
CHITTARANJAN LOCOMOTIVE WORKS
Supply Of Fire Detection Equipments Along With Connector In Sb2 As Per Clw Specn. Cl W/es/3/0057 [ Warranty Period: 30 Months After The Date Of Delivery ]
Indian Railway
Supply Of Differential Amplifier To Sensor Oil Circuit As Per Clw Spec. No. Clw/es/3/003 5 Alt.-h, & Str No. Clw/2020/eldo/e/str/0075 Rev- 0. [ Warranty Period: 30 Months After The Dat E Of Delivery ]
Northern Railway
Supply Of Set Of Overhauling Kit For Knorr Bremse Ccb System Consisting Of 3 Sub Kit S As Per Annexure-a, B, C Attached. Set Of (1) Overhauling Kit For Mr Filter Assembly Of C Cb As Per Annexure-a (2) Overhauling Kit For Bp Filter Assembly Of Ccb As Per Anneuxre-b (3) Overhauling Kit For 240lmr/20p/mrep/ac Filter Assembly Of Ccb As Per Annexure-c. [ W Arranty Period: 30 Months After The Date Of Delivery ]
Indian Railway
Supply Of Led Marker Light I) Elrs/spec/pr/0022 (rev.1, Oct. 2004) Except Page No.24 Ii) Cl W/es/sk-1/l-29 Alt-a Spec:i) Elrs/spec/pr/0022(rev.1,oct.2004) Except Page No.24 Ii)clw/es/sk -1/l-29 Alt-a [ Warranty Period: 30 Months After The Date Of Delivery ]
Federal Bank Limited
Sale Of Property By Drt-i, Ernakulam, The Federal Bank Ltd V/s. Abin Baby And Another (drc No.42/2023)
South East Central Railway
Replacement Of Existing Overaged Scada System As Per Rdso Spec Ti/spc/rcc/scada/0134 Or Latest For Durg-ngp Section Over Nagpur Division (including Supply, Erection, Testing And Commissioning Of Scada System As Per Rdso Spec Ti/spc/rcc/ Scada/0134 Or Latest , Dismantle Of Existing Scada System And Workstation Modification At Rcc).