WB Tenders — Updated March 2026
Latest WB Tenders — Live West Bengal Tender Listings
GeMTech PARAS indexes live wbtenders from West Bengal's major departments and local bodies into one searchable dashboard. Every West Bengal tender is tracked for closing dates, value, and category — and our AI checks your eligibility automatically so you only spend time on tenders you can win. Our expert team then prepares all your documents.
Read More
One platform for every active wbtender — PWD, irrigation, panchayat, and more across West Bengal. AI eligibility before you invest in a bid.
10,000
West Bengal Tenders Tracked
333+
Clients Across India
4.9★
Google Rating
24hr
Response Turnaround
98%
Compliance Rate
Showing 1 to 25 of 10,000
for West Bengal Tenders
South Eastern Railway
Supply Of Guide Ring For Axle Box Guide Arrangement. Drawing No. : Icf's Drg. No. T-0-1-640, Alt. B/ 2. Material And Specification : As Per Drawing And Conforming To Rdso's Str No. C-8215 (rev. Ii)/ Dec.1991 With Amend. 1 Of Apr. 1992 And Amend. 2 Of Aug. 2019 . [ Warranty Period: 30 Months After The Date Of Delivery ]
End Date
10 Aug 2026 12:00 PM
26 days left
Location
Kharagpur, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
South Eastern Railway
Supply Of Control Arm Assembly Right Consisting Of 2 (two) Items. Drawing No. : (i) Control Arm Upper To Rcf's Drg. No.- 1277122, Version-01r3, Qty.-01 No., And (ii) Control Arm Lower Right To Fiat-sig Schienenfahrzeuge Ag's Drg. No.1267717, Ver-00r2, Qty-01 No. Material & Specification: T.s. 17.334 100 06, T.s. 17.334 107 01, Mdts-166, Rev.-02 Or Latest, Mdts-241, Rev.-02, Is: 1865-1991, Reaffirmed 2005, Sg 400/18l. [ Warranty Period: 30 Months After The Date Of Delivery ]
End Date
30 Jul 2026 12:00 PM
15 days left
Location
Kharagpur, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
South Eastern Railway
Supply Of Control Rod With Head Complete For Bobrn Wagon. Drawing No. : Rdsos Drg. No. Wd-90002-s-01- Rc, Alt. 2, Item Nos. 26, 44, 45 & 49. Material And Specification : As Per Drawing And Conforming To Rdsos Spec. No .07-abr- 92, Amend. No. 5 Of Sept. 2016 . [ Warranty Period: 36 Months After The Date Of Delivery ]
End Date
20 Jul 2026 12:00 PM
5 days left
Location
Adra, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Jute Corporation of India Limited
Suppliers Of Jute Products / Jute Handicraft Items / Jute Hand Spun Yarn/jute Based Carpet/ Jute Braid/jute Geo-textiles/jute Agrotextiles/jute Allied Fibres/new Age Fibre
End Date
11 Nov 2026 12:00 PM
119 days left
Location
Parganas, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
South Eastern Railway
Supply Of Secondary Spring For Lhb Coaches (outer). Drawing No. : Fiat-sig Schienenfahrzeugeag's Drg. No. 1269514, Version-02. Matl.& Specn : Conforming To Rdso Specification No. Rdso/2017/cg-01, (rev. 03), Spring Code No. F18. [ Warranty Period: 72 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variationpermitted: Max 8 Lacs ] ]
End Date
06 Aug 2026 12:00 PM
22 days left
Location
Kharagpur, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
South Eastern Railway
Supply Of Secondary Vertical Damper For Nac Gs Lhb Type Coaches Drawing No. : Rdso/cg/drg /21018, Alt.-3. Matl.& Specn : Rdso/cg-18005, Rev.- 2, Amendment-1. [ Warranty Period: 36 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variationpermitted: Max 8 Lacs ] ]
End Date
12 Aug 2026 12:00 PM
28 days left
Location
Kharagpur, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
South Eastern Railway
Supply Of Non-asbestos Based 'k' Type High Friction Composite Brake Block For Bmbc. Drawing No. : Rdso's Drg. No. Sketch - 98066, Alt. 6. Material And Specification : Rdso's Str No. C-9809 (rev. 4 / May 2009 With Amend. 1 / Sept. 2016). [ Warranty Period: 18 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variationpermitted: Max 8 Lacs ] ]
End Date
04 Aug 2026 12:00 PM
20 days left
Location
Howrah, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Jute Corporation of India Limited
Expression Of Interest/ Applications For Empanelment Of Outsourcing Agencies Inicare Scheme- 2026
End Date
31 Jul 2026 12:00 PM
16 days left
Location
Kolkata, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
ZILLA PARISHAD
Installation Of Submersible Pump At Jobani Kayalpara Near Kabarsthan
End Date
06 Dec 2026 12:00 PM
144 days left
Location
Birbhum, West Bengal
Department
Refer doc
Amount
₹ 1.2 L
Amount:
₹ 1.2 L
ZILLA PARISHAD
Construction Of Boundary Wall Of Baral Baroary Hari Mondir, Location - Baral Baroary Hari Mondir Landmark- Baral
End Date
06 Dec 2026 12:00 PM
144 days left
Location
Dinajpur, West Bengal
Department
Refer doc
Amount
₹ 5 L
Amount:
₹ 5 L
MUNICIPAL AFFAIRS DEPARTMENT
Bm/pwd/apas/niet-19/25-26
End Date
22 Dec 2026 12:00 PM
160 days left
Location
Barasat, West Bengal
Department
Refer doc
Amount
₹ 1.32 L
Amount:
₹ 1.32 L
South Eastern Railway
Supply Of Water Tank Assembly (455 Litres), Two Piece Design.drawing No. : Icf's Drg. No. Icf/sk-6-3-444, Alt. N / Nil, Col. Ii. Material And Specification : As Per Drawing. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variationpermitted: Max 8 Lacs ] ]
End Date
20 Jul 2026 12:00 PM
5 days left
Location
Kharagpur, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
South Eastern Railway
Supply Of Emergency Lighting System For Eog Type Lhb Ac & Non Ac Coaches As Per Rdso's Specification No. Rdso/pe/spec/ac/0180-2016 Rev-0, Type-ii And Rdso's Drg. No. Rdso/pe/sk/tl/0181- 2016 Rev-0 Sheet 1&2. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variationpermitted: Max 8 Lacs ] ]
End Date
10 Aug 2026 12:00 PM
26 days left
Location
Howrah, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
South Eastern Railway
8 hours left
Supply Of Solid Drawn Copper Tube 20 Mm Od, 02 Mm Thickness, 3 Meter Long. [ Warranty Period: 30months After The Date Of Delivery ] ]
End Date
15 Jul 2026 12:00 PM
8 hours left
Location
Kharagpur, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
South Eastern Railway
8 hours left
Supply Of Cordless Impact Wrench, 1050 Nm, 3/4 Sq Drive With Battery And Charger. [ Warranty Period: 6 Months After The Date Of Delivery ] ]
End Date
15 Jul 2026 12:00 PM
8 hours left
Location
Kharagpur, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
South Eastern Railway
8 hours left
Supply Of Liquid Xylol For 3 Phase Loco In 20 Ltrs. As Per Specific Properties (1) Density 0.86-0.87gramm/cucm (2) Flash Point 20-25 Degree Centigrade (3) Boiling Point 137-143 Degree Centigrade (material To Be Supplied With Test Certificate) [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
15 Jul 2026 12:00 PM
8 hours left
Location
Kharagpur, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
South Eastern Railway
8 hours left
Supply Of Self Adjusting Insulated Stripper (insulation Remover) Of Cable Size 0.03 To 10 Sq. Mm. Copper Cables. Hsn Code: 82034090, Make/brand: Knipex / Te Connectivity/ Intercable / Wezag / Thomas & Betts / Wera / Proskit / Any Reputed Make. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
15 Jul 2026 12:00 PM
8 hours left
Location
Kharagpur, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
South Eastern Railway
8 hours left
Supply Of Portable Test Bench For Testing Over Voltage Relay Used In Emu/memu Coaches Input 230v 10a 50hz Ac [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
15 Jul 2026 12:00 PM
8 hours left
Location
Kharagpur, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
South Eastern Railway
8 hours left
Supply Of Molygraf Cc2 Grease Or Spelub Cc2 Or Autol Top 2000 Or Equivalent With Capacity Of 01 Kg Jar, For The Use In M/s. Schunk Pantographs. (to Be Procured From Oem Or Its Authorized Dealers With Certification And Recent Manufacturing Month & Year) [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
15 Jul 2026 12:00 PM
8 hours left
Location
Kharagpur, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
South Eastern Railway
8 hours left
Supply Of Tool Holders And Its Mounting Accessories For Turning And Finishing Operation As Per Annexure-a [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
15 Jul 2026 12:00 PM
8 hours left
Location
Kharagpur, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
South Eastern Railway
Supply Of Pressure Switch For Air Flow Relay Of Emu/memu Rectifier. As Per Switzer Model Gm-021-00-b5 D-5 Of Range 5 To 50 Mm Wc. With Process Connection 1/4 Inch Nptf [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
20 Jul 2026 12:00 PM
5 days left
Location
Kharagpur, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
South Eastern Railway
Supply Of Metallised Carbon Strip For Pantograph Of Electric Locos And Emu/memu Asper Rdso's Spec.no. Rdso/2009/el/spec/0097, (rev.-1) Of September 2013. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
11 Aug 2026 12:00 PM
27 days left
Location
Howrah, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
South Eastern Railway
8 hours left
Supply Of Gasket For Axle Cap Thick 1.18 Mm Conforming To Dy.cee/w/kgpws Drg No. Dy.cee/ws/kgp/emu/1199. Firm Should Submit Gc Along With The Material [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
15 Jul 2026 12:00 PM
8 hours left
Location
Kharagpur, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
South Eastern Railway
Supply Of Pinion Mounting And Dismounting Arrangement For Traction Motor Of 3phase Memus(medha Make) Rake Of Traction Motor Type- Tme 48-45-6 As Per Annexure/specification Attached [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
20 Jul 2026 12:00 PM
5 days left
Location
Kharagpur, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
South Eastern Railway
Supply Of Resistance Adjustable Type Silicon Coated 12 K Ohms [plus Minus] 5 % 160 Watt, As Per Dy Cee [ws] / Kgp's Drg No: Dy Cee/ws/kgp/emu/0317 [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
20 Jul 2026 12:00 PM
5 days left
Location
Kharagpur, West Bengal
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Select a tender to view details
The Problem
Why West Bengal Tenders Get Rejected at the Technical Stage
These are the most common rejection reasons our team sees — all 100% avoidable with the right support.
WB PWD Registration Missing
West Bengal PWD contractor registration not held — mandatory for all civil tenders above threshold value.
WBSEDCL Vendor Empanelment
Electrical tenders require active WBSEDCL vendor empanelment — not interchangeable with registrations from other states.
Incorrect Financial QR
Turnover threshold not matching WB-specific NIT QR — often based on cost index different from other states.
Missing Solvency Certificate
WB tenders frequently require banker's solvency certificate for a specific amount — missed by first-time bidders.
Non-WB EMD Bank
EMD Bank Guarantee from a bank branch outside West Bengal not accepted for many WB department tenders.
Unsigned Price Schedule
Financial bid pages not signed by authorized signatory on every page — a common WB PWD rejection ground.
The Solution
Everything You Need to Win West Bengal Tenders — In One Platform
End-to-end bid support from documentation to order confirmation.
Complete WB bid documentation — EMD, WB PWD registration, WBSEDCL empanelment proofs, and QR certificates.
AI eligibility check against West Bengal tender criteria — expert team prepares all documents for qualifying bids.
Post-bid liaisoning with WB PWD, WBSEDCL, and KMDA through evaluation and award stage.
Our Process
How It Works — 4 Simple Steps
1
Eligibility Check
WhatsApp company profile, AI checks QR fit within 2 hours
2
Document Review
we audit existing documents against tender requirements
3
Bid Preparation
we prepare all technical & financial folders, 100% compliant
4
Submit & Win
submission supported through evaluation
FREE DOWNLOAD
West Bengal Tender Checklist:
10 Must-Have Documents
10 Must-Have Documents
The exact checklist our team uses for every West Bengal bid — never get
rejected for a missing document.
FAQ
Frequently Asked Questions about West Bengal Bidding
Chat with a West Bengal tender Expert