PGCIL GeM Tenders — Updated March 2026
Latest Power Grid Corporation Tenders(Updated Daily)
Access active PGCIL tender notices and get expert consultancy to ensure your technical bid is 100% compliant. Don't let documentation errors lead to rejection — 40% of bids are rejected at the technical stage.
100+ Bids Managed
98% Technical Compliance Rate
Post Bid Support
4.9★ Google Rating
100+
Bids Managed
98%
Technical Compliance Rate
300+
Clients Across India
4.9★
Google Reviews
24hr
Response Turnaround
Showing 1 to 25 of 183
for Meghalaya Tenders
Information Technology Department
Rfp For Engagement Of A System Integrator (si) For Upgrade, Supply, Installation, Commissioning And Maintenance Of Meghalaya State Wide Area Network (mswan) On Engineering, Procurement And Construction (epc) Mode
End Date
02 Apr 2026
7 days left
Location
Shillong, Meghalaya
Department
Refer doc
Amount
₹ 57.31 Cr
Amount:
₹ 57.31 Cr
North Eastern Indira Gandhi Regional Institute Of Health
1 day left
1;Walk in Cooler (Q3)
End Date
27 Mar 2026
1 day left
Location
East Khasi Hills, Meghalaya
Department
Department Of Health And Family Welfare
Amount
₹ 22.5 L
Amount:
₹ 22.5 L
Power Grid Corporation Of India Limited
270;Anti - Corrosive Zinc Rich Galvanized Paint (Q3)
End Date
30 Mar 2026
4 days left
Location
Jaintia Hills, Meghalaya
Department
Power Grid Corporation Of India Limited
Amount
₹ 2.7 L
Amount:
₹ 2.7 L
Meghalaya Infrastructure Development Finance Corporation
Expired Today
Consultancy Services For Project Management Consultant Pmc For Implementation Of World Bank Funded Meghalaya Logistics And Connectivity Improvement Project Mlcip
End Date
Expired
Location
East Khasi Hills, Meghalaya
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
North Eastern Indira Gandhi Regional Institute Of Health And
Expired Today
1;Ophthalmic ND Yag laser (Q2)
End Date
Expired
Location
East Khasi Hills, Meghalaya
Department
Department Of Health And Family Welfare
Amount
₹ 30 L
Amount:
₹ 30 L
national highways infrastructure and development corporation ltd
Corrigendum : Development, Maintenance, Management, Operation Of Greenfield Hsc From Mawlyngkhung (near Shillong) In Meghalaya To Panchgram (near Silchar) In Assam By 4-laning With Paved Shoulders On Ham For Pkg-1 From Km 0.000 To Km 45.645, Design Length-45.645
End Date
01 Apr 2026
6 days left
Location
UMIAM, Meghalaya
Department
Refer doc
Amount
₹ 4,734.24 Cr
Amount:
₹ 4,734.24 Cr
Dg Armed Forces Medical Service
2 days left
21;Q switched Nd Yag Laser
End Date
28 Mar 2026
2 days left
Location
East Khasi Hills, Meghalaya
Department
Department Of Defence
Amount
Refer doc
Amount:
Refer doc
Dg Armed Forces Medical Service
2 days left
41;Fractional CO2 L: aser
End Date
28 Mar 2026
2 days left
Location
East Khasi Hills, Meghalaya
Department
Department Of Defence
Amount
Refer doc
Amount:
Refer doc
national highways infrastructure and development corporation ltd
Construction Of Remedial Measures For Treatment Of Sinking Zone At 72 Locations In Between Km 85.000 To Km 95.000 And Km 101.000 To Km 145.000 Of Tura-dalu Section Of Nh-51 In The State Of Meghalaya On Epc Mode
End Date
06 Apr 2026
11 days left
Location
Tura, Meghalaya
Department
Refer doc
Amount
₹ 123.86 Cr
Amount:
₹ 123.86 Cr
Assam Rifles
17 hours left
1600;Distemper Assorted Shade 20 KG Container
End Date
26 Mar 2026
17 hours left
Location
East Khasi Hills, Meghalaya
Department
Central Armed Police Forces
Amount
Refer doc
Amount:
Refer doc
Assam Rifles
23 hours left
1100;Dust Bin 60 Ltr (02 Piece each set)
End Date
26 Mar 2026
23 hours left
Location
East Khasi Hills, Meghalaya
Department
Central Armed Police Forces
Amount
₹ 1.62 Cr
Amount:
₹ 1.62 Cr
Assam Rifles
15 hours left
400;LED SOLAR STREET LIGHT SYSTEM (ALL IN ONE) 20W WITH POLE
End Date
26 Mar 2026
15 hours left
Location
East Khasi Hills, Meghalaya
Department
Central Armed Police Forces
Amount
Refer doc
Amount:
Refer doc
Meghalaya Energy Corporation Limited
Corrigendum : Design, Manufacture, Testing At Manufacturers Works, Supply And Delivery At Site, Assembly, Erection, Testing And Commissioning Of (2 X 3000) Kw Riangdo Small Hydro-electric Project Along With 33kv Switchyard, West Khasi Hills District, In The State Of Meghalaya
End Date
10 Apr 2026
15 days left
Location
Shillong, Meghalaya
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Assam Rifles
2 days left
250;SUPPLY AND INSTALLATION OF METAL CRASH BARRIER
End Date
28 Mar 2026
2 days left
Location
East Khasi Hills, Meghalaya
Department
Central Armed Police Forces
Amount
Refer doc
Amount:
Refer doc
Assam Rifles
CHANGE OVER SWITCH;1420;3 Pole 63 Amp 08 , Change Over Switch 3 Pole 63 Amp 09 , Change Over Switch 3 Pole 63 Amp 10 , Change Over Switch 3 Pole 63 Amp 11 , Change Over Switch 3 Pole 63 Amp 12 , Change Over Switch 3 Pole 63 Amp 13 , Change Over Switch 3 Pole 63 Amp 14 , Change Over Switch 3 Pole 100 Amp 01 , Change Over Switch 3 Pole 100 Amp 02 , Change Over Switch 3 Pole 100 Amp 03 , Change Over Switch 3 Pole 100 Amp 04 , Change Over Switch 3 Pole 100 Amp 05 , Change Over Switch 3 Pole 100 Amp 06 , Change Over Switch 3 Pole 100 Amp 07 , Change Over Switch 3 Pole 100 Amp 08 , Change Over Switch 3 Pole 100 Amp 09 , Change Over Switch 3 Pole 100 Amp 10 , Change Over Switch 3 Pole 100 Amp 11 , Change Over Switch 3 Pole 100 Amp 12 , Change Over Switch 3 Pole 100 Amp 13 , Change Over Switch 3 Pole 100 Amp 14 , Change Over Switch 4 Pole 63 Amp 01 , Change Over Switch 4 Pole 63 Amp 02 , Change Over Switch 4 Pole 63 Amp 03 , Change Over Switch 4 Pole 63 Amp 04 , Change Over Switch 4 Pole 63 Amp 05 , Change Over Switch 4 Pole 63 Amp 06 , Change Over Switch 4 Pole 63 Amp 07 , Change Over Switch 4 Pole 63 Amp 08 , Change Over Switch 4 Pole 63 Amp 09 , Change Over Switch 4 Pole 63 Amp 10 , Change Over Switch 4 Pole 63 Amp 11 , Change Over Switch 4 Pole 63 Amp 12 , Change Over Switch 4 Pole 63 Amp 13 , Change Over Switch 4 Pole 63 Amp 14 , Change Over Switch 4 Pole 100 Amp 01 , Change Over Switch 4 Pole 100 Amp 02 , Change Over Switch 4 Pole 100 Amp 03 , Change Over Switch 4 Pole 100 Amp 04 , Change Over Switch 4 Pole 100 Amp 05 , Change Over Switch 4 Pole 100 Amp 06 , Change Over Switch 4 Pole 100 Amp 07 , Change Over Switch 4 Pole 100 Amp 08 , Change Over Switch 4 Pole 100 Amp 09 , Change Over Switch 4 Pole 100 Amp 10 , Change Over Switch 4 Pole 100 Amp 11 , Change Over Switch 4 Pole 100 Amp 12 , Change Over Switch 4 Pole 100 Amp 13 , Change Over Switch 4 Pole 100 Amp 14 , Change Over Switch 4 Pole 200 Amp 01 , Change Over Switch 4 Pole 200 Amp 02 , Change Over Switch 4 Pole 4...
End Date
28 Mar 2026
3 days left
Location
East Khasi Hills, Meghalaya
Department
Central Armed Police Forces
Amount
Refer doc
Amount:
Refer doc
Power Grid Corporation Of India Limited
1 day left
Supply and retrofittment of 145 kV CB;33;Supply of 145 kV, 1600A, 31.5 kA Circuit Breaker 3-phase with support structure complete set as per TS for agartala , Service Charge for Retrofitment of the supplied Circuit Breaker , Service Charge for DIsmentalling of the old Circuit Breaker , Supply of 145 kV, 1600A, 31.5 kA Circuit Breaker 3-phase with support structure complete set as per TS , Supply of 145 kV, 1600A, 31.5 kA Circuit Breaker 3-phase with support structure complete set as per TS for arkhliehriat , Supply of 145 kV, 1600A, 31.5 kA Circuit Breaker 3-phase with support structure complete set as per TS for aizwal , Supply of 145 kV, 1600A, 31.5 kA Circuit Breaker 3-phase with support structure complete set as per TS for nirjuli , Supply of 145 kV, 1600A, 31.5 kA Circuit Breaker 3-phase with support structure complete set as per TS for bongaigaon
End Date
27 Mar 2026
1 day left
Location
Jaintia Hills, Meghalaya
Department
Power Grid Corporation Of India Limited
Amount
Refer doc
Amount:
Refer doc
national highways infrastructure and development corporation ltd
Development,maintenance,management And Operation Of Greenfield Hsc From Mawlyngkhung (near Shillong) In Meghalaya To Panchgram (near Silchar) In Assam By 4-laning With Paved Shoulders On Ham. (pkg-4 From Km 133.32 To Km 164.35,design Length -31.035km - Development, Maintenance, Management And Operation Of Greenfield High-speed Corridor From Mawlyngkhung (near Shillong) In Meghalaya To Panchgram (near Silchar) In Assam By 4-laning With Paved Shoulders On Hybrid Annuity Basis. (package-4: From Km 133+320 To Km 164+355, Design Length 31.035 Km).
End Date
13 Apr 2026
18 days left
Location
Tura, Meghalaya
Department
Refer doc
Amount
₹ 2,206.55 Cr
Amount:
₹ 2,206.55 Cr
Indian Air Force
6;ECO FRIENDLY CABIN WITH PORTABLE SHOWER AND TOILET FACILITY
End Date
30 Mar 2026
4 days left
Location
East Khasi Hills, Meghalaya
Department
Department Of Military Affairs
Amount
Refer doc
Amount:
Refer doc
Central Agricultural University Imphal Manipur
1;Procurement of Infra Red Gas Analyser
End Date
30 Mar 2026
4 days left
Location
Ri Bhoi, Meghalaya
Department
Department Of Agricultural Research And Education dare
Amount
Refer doc
Amount:
Refer doc
Assam Rifles
Oils Lubricants Greases and General Items;171421;Engine Oil 4T 10W20 , Engine Oil 4T Active 20W40 , Engine Oil CH4 SAE 15W40 API , Engine Oil 4T 10W30 , Engine Oil RX Diesel 20W40 , Eng Oil 20W50 GTX , Power Steering Oil , Transmission Oil Red Colour oil with low static friction , Gear Differential Oil 85W140 , HYPOC 80W90 LS , Sulphuric Battery Acid , Grease Gem RR3 , Grease WB , Grease MP 3 , Coolant Readicool Heavy Duty , Clutch Brake Fluid DOT 4 , Clutch Brake Fluid DOT 3 , Rear Axle Oil SAE 140 EP , HD 30 for Generator , Engine Oil CI4 Plus SAE 15W40 API , Distilled Water , Nipple Grease LG 280 , Mineral Jelly , Hub Grease SG 240 , Oil OX 52 Gun Rifle Oil , Protective PX6 , Grease XG 279 , Grease XG 285 , Grease XG 280 , Grease XG 340 , Grease Resisting Paper , Silica Gel , Spirit Denatured , Oil C 70 Compound Oil , Oil OX 13 Armament Cleaning Fluid , Bees Wax , Oil Linseed Raw , Gear Box Oil HP 90 , Gear box Oil SAE 30 , Front and Rear Axle Oil 85W90 , Front Axle Oil T 20 , 2T Oil for 2 Stroke Engine , Engine Oil 15W50 API SL , Coolant Ultracool , Hydraulic Oil VG 68 , Gear Box Oil GL 4 80W90 , Coolant Red Colour , Rear Axle Oil GL-5 80W140 , Coolant Non Amino Base , Engine Oil Maximile Feo , SAE 0W20 Petrol , Engine Oil 5W30 , Engine Oil Maximile Ultra V4 , Gear Oil 75W90 , Test Oil H-S oblique EFFP 170 Calibrator , Diesel Exhaust Fluid , Gear Box Oil F 10 , Engine Oil 5W20 , Engine Oil 5W40 , Engine Oil 20W30 SAE for Generator
End Date
30 Mar 2026
4 days left
Location
East Khasi Hills, Meghalaya
Department
Central Armed Police Forces
Amount
₹ 4.95 Cr
Amount:
₹ 4.95 Cr
North Eastern Indira Gandhi Regional Institute Of Health
5148;Rectified Spirit for Industrial use (V3) as per IS 323 (Q3)
End Date
30 Mar 2026
4 days left
Location
East Khasi Hills, Meghalaya
Department
Department Of Health And Family Welfare
Amount
Refer doc
Amount:
Refer doc
Military Engineer Services
Expired Today
Corrigendum : Widening Of Roads And Construction Of Footpath At 509 Su At Af Stn Shillong
End Date
Expired
Location
East Khasi Hills, Meghalaya
Department
Refer doc
Amount
₹ 2.99 Cr
Amount:
₹ 2.99 Cr
Meghalaya Energy Corporation Limited
Corrigendum : Construction Of Civil & Hydro Mechanicalworks Of Riangdo Small Hydro Project (2 X 3 Mw)
End Date
10 Apr 2026
15 days left
Location
Shillong, Meghalaya
Department
Refer doc
Amount
₹ 13.85 Cr
Amount:
₹ 13.85 Cr
Bharat Sanchar Nigam Limited Portalbsnl
10;Professional Large Format Display (V2) (Q2)
End Date
31 Mar 2026
5 days left
Location
East Khasi Hills, Meghalaya
Department
Department Of Telecommunications dot
Amount
₹ 4.3 L
Amount:
₹ 4.3 L
Iti Limited
Expired Today
Selection Of Backend Partner For Participation In The Bid For Upgrade, Supply, Installation, Commissioning And Maintenance Of Meghalaya State Wide Area Network (mswan) On Engineering, Procurement And Construction (epc) Mode.
End Date
Expired
Location
Shillong, Meghalaya
Department
Refer doc
Amount
₹ 57.31 Cr
Amount:
₹ 57.31 Cr
Select a tender to view details
The Problem
Why 40% of Bids Fail at Technical Stage
These are the most common rejection reasons our team sees — all 100% avoidable with the right support.
Incorrect EMD Format
EMD submitted as DD instead of Bank Guarantee, or from a non-approved bank branch —
rejected without exception.
Failing QR Requirements
Turnover or experience certificates not meeting Qualifying Requirements — especially
the similar-work clause.
Missing / Invalid MAF
Manufacturer Authorization Form absent, not on OEM letterhead, or missing proper
stamp/authorized signatory.
Wrong BID Security Amount
EMD value calculated incorrectly — even a small rounding error vs. estimated bid value
leads to automatic disqualification.
Expired Registrations
MSME/NSIC certificates lapsed, or GST registration not updated for the specific bid
category.
Non-Compliant Document Format
Technical bid not paginated, indexed, or notarized as per Special Conditions of
Contract (SCC).
The Solution
How GeMTech PARAS Ensures You Win
End-to-end bid support from documentation to order confirmation.
Documentation Support
We prepare your complete technical & financial bid folders — rejection-proof.
- EMD / Bank Guarantee preparation
- QR certificate compilation & verification
- MAF & OEM authorization letters
- Notarization & affidavit support
- Document indexing per SCC
Portal Management
End-to-end bid submission so you never miss a deadline.
- Bid submission on portal
- Document upload & correct tagging
- Corrigendum / amendment tracking
- Pre-bid query filing
- Deadline alerts & reminders
Post-Bid Support
We stay with you from submission to order confirmation.
- Technical Query (TQ) response drafting
- Evaluation stage liaisoning
- Price negotiation support
- LOI / Work Order follow-up
- Grievance filing if rejected
Our Process
How It Works — 4 Simple Steps
1
Free Eligibility Check
WhatsApp us your company profile — we check QR fit within 2 hours
2
Document Review
We audit your existing documents against NIT requirements
3
Bid Preparation
We prepare all technical & financial folders — 100% compliant
4
Submit & Win
We submit on the portal and support you through evaluation
FREE DOWNLOAD
Tender Checklist:
10 Must-Have Documents
10 Must-Have Documents
The exact checklist our consultants use for every bid — never get rejected for missing
documents again.
FAQ