GeM Tenders
Found 1672 tenders for your search .
Supply Of Diesel Engine Operated Fork Lift Truck Of Capacity 5000kg As Per Specification Uploaded As A Nnexure-i. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 26 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 26 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Diesel Engine Operated Fork Lift Of Capacity 3000kg As Per Specification Uploaded As Annexu Re-i. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 26 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 26 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Manufacturing And Supply Of Complete Set Of Inspection Gauges For As Per Rdso Drg. No. T-6 215 (part) For 10125 Mm Over Riding Fan Shaped Curved Switch B.g For 60 Kg (uic)/60e1 On Psc Sleeper To R Dso Drg. No. Rt-4219. One Set Consist Of (i) End Templates-y At Point 'r' (ats), Gauge No. 1, (ii) Under Cutt Ing Of Tongue Rail Foot At Ats, Gauge No.2, (iii) 13 Mm Head Thickness (at 1682 Mm From Ats), Gauge No. 3, (iv) 12r Toe Radius At Ats, Gauge No.6, (v) Tongue Rail Head Thickness (at 4244 Mm From Ats), Gauge N O.35. Make-mechelonic Industries Or Similar. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 26 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 26 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Dc Link Capacitor As Per Alstom Part No. : Tc3eh-208273p2018, For Traction Converter Type, Make : M/s Alstom. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 26 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 26 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Design, Supply, Erection, Testing & Commissioning Of 2x25 Kv, 50 Hz, Single Phase, Traction Over-head Equipment, Switching Station, Scada, General Electrical Services Works Along With Telecommunication Work, Civil Engineering Work And Other Associated Works Between Section Taroki (excl.) - Rowghat (incl.) 18.85 Rkm / 24.74 Tkm Of Raipur Division In South East Central Railway, Chhattisgarh, India
Read MorePublish Date | 26 Feb 2025 | |
Bid Submission End Date | 24 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 26 Feb 2025 | |
Bid Submission End Date | 24 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
GFN Insulating liners for Rail Track;1364900; M7520756561 M7520756564 M7520756604 M7520756607 M7520756608 M7520756609 M7520756610 M7520756565 GeMARPTS / Searched Strings used in GeMARPTS Glass Filled Nylon Liner for Rail Track GeMARPTS / Searched Result generated in GeMARPTS Category not available on GeM for the text string uploaded by the buyer / Relevant Categories selected for notification Cylinder Liner Polythene liner
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
15; Geographic Information System GIS Software V2 Q2 Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 24 Lakh s OEM Average Turnover Last 3 Years/ 3 3 190 Lakh s Years of Past Experience Required for same/similar service/ 45 45 3 Year s MSE Exemption for Turnover/ 78 78 Yes Startup Exemption for Turnover/ 78 78 Yes
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | 95 K | |
Tender Amount | Refer Doc |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | 95 K | |
Tender Amount | Refer Doc |
4; SAP integration of 04 nos. of Pre-weigh hopper systems GeMARPTS / Searched Strings used in GeMARPTS SAP integration of 04 nos. of Pre-weigh hopper systems GeMARPTS / Searched Result generated in GeMARPTS Category not available on GeM for the text string uploaded by the buyer / Relevant Categories selected for notification Slamps Algorithm based Street Light Automatic Switch MSE Exemption for Years Of Experience/Yes Startup Exemption for Years Of Experience/Yes Document required from seller/ Additional Doc 1 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ No Bid to RA enabled/ No
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | 33.63 K | |
Tender Amount | 16.82 L |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | 33.63 K | |
Tender Amount | 16.82 L |
Scanning and Digitisation Service Version 2 - 600 A2 Contract Period/ 1 Years Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 100 Lakh s Years of Past Experience Required for same/similar service/ 45 45 3 Year s Past Experience of Similar Services required/ Yes MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaBidder TurnoverCertificate Requested in ATCOEM Authorization CertificateOEM Annual TurnoverAdditional Doc 1 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 29 Mar 2025 | |
Earnest Amount | 2.4 L | |
Tender Amount | 2.4 Cr |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 29 Mar 2025 | |
Earnest Amount | 2.4 L | |
Tender Amount | 2.4 Cr |
666; Fishing Nets Q3 Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 50 Lakh s OEM Average Turnover Last 3 Years/ 3 3 300 Lakh s MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Bidder TurnoverCertificate Requested in ATCOEM Authorization CertificateOEM Annual TurnoverAdditional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATCAdditional Doc 3 Requested in ATCAdditional Doc 4 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ No
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 29 Mar 2025 | |
Earnest Amount | 3 L | |
Tender Amount | Refer Doc |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 29 Mar 2025 | |
Earnest Amount | 3 L | |
Tender Amount | Refer Doc |
100; Self Propelled Weeder Q3 OEM Average Turnover Last 3 Years/ 3 3 319 Lakh s MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Past PerformanceBidder TurnoverCertificate Requested in ATCOEM Authorization CertificateOEM Annual TurnoverAdditional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATCAdditional Doc 3 Requested in ATCAdditional Doc 4 Requested in ATCCompliance of BoQ specification and supporting document In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ Yes Past Performance/20 Bid to RA enabled/ No
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 29 Mar 2025 | |
Earnest Amount | 3.99 L | |
Tender Amount | Refer Doc |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 29 Mar 2025 | |
Earnest Amount | 3.99 L | |
Tender Amount | Refer Doc |
ERECTION AND STRINGING T AND P;8396; ERECTION T AND P STRINGING T AND P ERECTION AND STRINGING ERECTION AND STRINGING TOOLS ERECTION AND STRINGING T AND P GeMARPTS / Searched Strings used in GeMARPTS Erection and stringing TP GeMARPTS / Searched Result generated in GeMARPTS PT Shoes Having Textile Upper and Shoe Canvas with Moulded Rubber Sole Mens Cotton Knitted Sports Shirt / T- Shirt conforming to IS 4375 Portable Voice Recorder Pears Gauva Seeds Office Chair V3 Cast Copper Alloy Traps Industrial Safety Belts and Harnesses as per IS 3521 Tent Extendable Frame Supported With Mild Steel Joints and Flooring TPO Industrial Safety Gloves - Leather and Cotton boot ankle leather derby direct moulded pu midsole and moulded tpu outsole / Relevant Categories selected for notification Cutting Tools
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | 2.56 L | |
Tender Amount | Refer Doc |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | 2.56 L | |
Tender Amount | Refer Doc |
Scanning and Digitisation Service Version 2 - 600 A2 Contract Period/ 1 Years Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 100 Lakh s Years of Past Experience Required for same/similar service/ 45 45 3 Year s Past Experience of Similar Services required/ Yes MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaBidder TurnoverCertificate Requested in ATCOEM Authorization CertificateOEM Annual TurnoverAdditional Doc 1 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 29 Mar 2025 | |
Earnest Amount | 75 K | |
Tender Amount | 75 L |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 29 Mar 2025 | |
Earnest Amount | 75 K | |
Tender Amount | 75 L |
1; Tractors V1 Q2 MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Certificate Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ Yes Bid to RA enabled/ No Annual Maintenance Charges Required Yes Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 2 Days
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | 20 K | |
Tender Amount | Refer Doc |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | 20 K | |
Tender Amount | Refer Doc |
Scanning and Digitisation Service Version 2 - 600 A2 Contract Period/ 1 Years Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 100 Lakh s Years of Past Experience Required for same/similar service/ 45 45 3 Year s Past Experience of Similar Services required/ Yes MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaBidder TurnoverCertificate Requested in ATCOEM Authorization CertificateOEM Annual TurnoverAdditional Doc 1 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 29 Mar 2025 | |
Earnest Amount | 2.4 L | |
Tender Amount | 2.1 Cr |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 29 Mar 2025 | |
Earnest Amount | 2.4 L | |
Tender Amount | 2.1 Cr |
255; Heating Element 1700008537 Heating Coil 1700001655 Immersion Water Heater1600021438 Coocking Coil 8 1700001650 GeMARPTS / Searched Strings used in GeMARPTS Coocking Coil 8 GeMARPTS / Searched Result generated in GeMARPTS HDMI 8 x 8 Switcher 8-Hydroxyquinoline Fasteners - Single Coil Rectangular Section Spring Lock Washers as per IS 3063 Condenser Coil Tripping Coil Elecric Bells and Accessories as per IS 2268 Coil Tubular heater Electric Coil Stove water baths Moving Coil - BHEL / Relevant Categories selected for notification Electric Coil Stove MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Bid to RA enabled/ No Type of Bid/Two Packet Bid Primary product category Heating Element 1700008537
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 21 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 21 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
1; HDPE life boat for rescue 8 SEATER as per GSDRF specification Q3 Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 7 Lakh s OEM Average Turnover Last 3 Years/ 3 3 56 Lakh s Years of Past Experience Required for same/similar service/ 45 45 3 Year s MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaPast PerformanceBidder TurnoverOEM Authorization CertificateOEM Annual Turnover In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | 0 | |
Tender Amount | 14 L |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | 0 | |
Tender Amount | 14 L |
1; High Energy Planetary Ball Milling GeMARPTS / Searched Strings used in GeMARPTS High Energy Planetary Ball Milling GeMARPTS / Searched Result generated in GeMARPTS Planetary Ball Mill for Laboratory Solid carbide end mill High Energy Bar Ball Mill for Laboratory Tennis Ball Grinding Media Balls as per IS 6079 Lamp Ballast for HPSV Lamps as per IS 15882:2009 IS 15885 / Relevant Categories selected for notification Planetary Ball Mill for Laboratory Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 12 Lakh s OEM Average Turnover Last 3 Years/ 3 3 96 Lakh s Years of Past Experience Required for same/similar service/ 3 Year s MSE Exemption for Years of Experience and Turnover/ No
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | 66 K | |
Tender Amount | Refer Doc |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | 66 K | |
Tender Amount | Refer Doc |
PROCUREMENT OF MULTI FUNCTION DEVICES FOR NTPC;728; M9717369731NRHQ M9717369732NRHQ M9717369731Singrauli M9717369732Singrauli M9717369734Singrauli M9717369731Rihand M9717369732Rihand M9717369734Rihand M9717369734Unchahar M9717369731Tanda M9717369733Auraiya M9717369734Auraiya M9717369731Anta M9717369732Anta M9717369734Vindhyachal M9717369732Sipat M9717369733ER1HQ M9717369734ER1HQ M9717369733Kolkata M9717369734Kolkata M9717369731Talcher M9717369732Talcher M9717369734Talcher M9717369732Barh M9717369732SRHQ M9717369732Ramagundam M9717369732Kayamkulam M9717369733Koldam M9717369734Koldam M9717369731Mouda M9717369732Mouda M9717369731Lara M9717369734Lara M9717369732Gadarwara M9717369732Kanti M9717369733Kanti GeMARPTS / Searched Strings used in GeMARPTS PRINTER: COLORMFM21-24PPMA4150HZ GeMARPTS / Searched Result generated in GeMARPTS Color Production Printer MHA Multifunction Machine MFM V2 Industrial composite color 3D Printer Nitrile Coated Hand Gloves Offset Four Colour Machine MHA Solar IV Curve Tracer Transcranial Color Doppler Multipara Monitor - Low End Ferrule Printer Stencil Printer
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
PROCUREMENT OF MULTI FUNCTION DEVICES FOR NTPC;728; M9717369731NRHQ M9717369732NRHQ M9717369731Singrauli M9717369732Singrauli M9717369734Singrauli M9717369731Rihand M9717369732Rihand M9717369734Rihand M9717369734Unchahar M9717369731Tanda M9717369733Auraiya M9717369734Auraiya M9717369731Anta M9717369732Anta M9717369734Vindhyachal M9717369732Sipat M9717369733ER1HQ M9717369734ER1HQ M9717369733Kolkata M9717369734Kolkata M9717369731Talcher M9717369732Talcher M9717369734Talcher M9717369732Barh M9717369732SRHQ M9717369732Ramagundam M9717369732Kayamkulam M9717369733Koldam M9717369734Koldam M9717369731Mouda M9717369732Mouda M9717369731Lara M9717369734Lara M9717369732Gadarwara M9717369732Kanti M9717369733Kanti GeMARPTS / Searched Strings used in GeMARPTS PRINTER: COLORMFM21-24PPMA4150HZ GeMARPTS / Searched Result generated in GeMARPTS Color Production Printer MHA Multifunction Machine MFM V2 Industrial composite color 3D Printer Nitrile Coated Hand Gloves Offset Four Colour Machine MHA Solar IV Curve Tracer Transcranial Color Doppler Multipara Monitor - Low End Ferrule Printer Stencil Printer
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
12; W90313181519 Turbine Integral Piping P-91 GeMARPTS / Searched Strings used in GeMARPTS W90313181519 Turbine Integral Piping P-91 GeMARPTS / Searched Result generated in GeMARPTS Special Proofed Canvas / Duck as per IS 6803 / Relevant Categories selected for notification Steel Tubes Tubulars and Other Steel Fittings as per IS 1239 Part 2 - Steel Pipe Fittings MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Additional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATCAdditional Doc 3 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ No Bid to RA enabled/ Yes
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | 40 L | |
Tender Amount | Refer Doc |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | 40 L | |
Tender Amount | Refer Doc |
12; W90313181519 Turbine Integral Piping P-91 GeMARPTS / Searched Strings used in GeMARPTS W90313181519 Turbine Integral Piping P-91 GeMARPTS / Searched Result generated in GeMARPTS Special Proofed Canvas / Duck as per IS 6803 / Relevant Categories selected for notification Steel Tubes Tubulars and Other Steel Fittings as per IS 1239 Part 2 - Steel Pipe Fittings MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Additional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATCAdditional Doc 3 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ No Bid to RA enabled/ Yes
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | 40 L | |
Tender Amount | Refer Doc |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | 40 L | |
Tender Amount | Refer Doc |
12; W90313181519 Turbine Integral Piping P-91 GeMARPTS / Searched Strings used in GeMARPTS W90313181519 Turbine Integral Piping P-91 GeMARPTS / Searched Result generated in GeMARPTS Special Proofed Canvas / Duck as per IS 6803 / Relevant Categories selected for notification Steel Tubes Tubulars and Other Steel Fittings as per IS 1239 Part 2 - Steel Pipe Fittings MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Additional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATCAdditional Doc 3 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ No Bid to RA enabled/ Yes
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | 40 L | |
Tender Amount | Refer Doc |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | 40 L | |
Tender Amount | Refer Doc |
2; HDPE life boat for rescue 8 SEATER as per GSDRF specification Q3 Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 1 Lakh s OEM Average Turnover Last 3 Years/ 3 3 6 Lakh s Years of Past Experience Required for same/similar service/ 45 45 3 Year s MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaPast PerformanceBidder TurnoverOEM Authorization CertificateOEM Annual Turnover In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | 2 L |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | 2 L |
1; HDPE life boat for rescue 8 SEATER as per GSDRF specification Q3 Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 3 Lakh s OEM Average Turnover Last 3 Years/ 3 3 24 Lakh s Years of Past Experience Required for same/similar service/ 45 45 3 Year s MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaPast PerformanceBidder TurnoverOEM Authorization CertificateOEM Annual Turnover In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Read MorePublish Date | 27 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | 6 K | |
Tender Amount | Refer Doc |
Publish Date | 27 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | 6 K | |
Tender Amount | Refer Doc |