Punjab Tenders — Updated March 2026
Latest Punjab Tenders — Live State E-Procurement Listings
GeMTech PARAS aggregates live Punjab tenders from PWRD, Punjab Irrigation, PSPCL, and PUDA across all 23 districts. Our AI checks your eligibility for every Punjab tender and our expert team prepares complete bid documentation.
Read More
Latest Punjab Tenders — Live State E-Procurement Listings
100
Punjab Tenders Tracked
100
Clients Across India
4.9★
Google Rating
24hr
Response Turnaround
98%
Compliance Rate
Showing 1 to 25 of 5,672
for Punjab Tenders
Military Engineer Services
Certain Repairs Of Sewage System Under Age Br-i Of Ge(n) Patiala
End Date
08 Jul 2026 12:00 PM
8 days left
Location
Patiala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Indian Railway
1 day left
Supply Of Long Life Loco Side Buffer Assly (capacity 30 Kj Minimum) To Rdso Drg No. Sk.dl-4748 Alt.-2, Rdso Spec No. : (1) Mp-0.41.00.03 (rev.03) Aug 2024 With Amendment Slip No. 1, September' 2025 & Annexure -1,2 & 3, And Mp-0.41.00.07 (rev. 01) April 2024 With Annexure -1 & 2. [ Warranty Period: 99 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
01 Jul 2026 12:00 PM
1 day left
Location
Patiala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Indian Army
650;Exoskeleton
End Date
03 Jul 2026 04:00 PM
3 days left
Location
Bathinda, Punjab
Department
Department Of Military Affairs
Amount
Refer doc
Amount:
Refer doc
Indian Army
Air traffic services modernisation;19;Airfield Lighting System of Runway with Helicopter Approach Path Indicator , Voice Communication Control System , Automatic Weather Station AWOS with Frangible Mast , PTZ Day and Night Camera System for Air Traffic Control Recording , Power Generation System , Stabilized Uninterrupted Power distribution network for Air Traffic Services Equipment , ATC and user consoles , Trailer Mounted Mobile ATC , Server and Work Station
End Date
04 Jul 2026 11:00 AM
4 days left
Location
Bathinda, Punjab
Department
Department Of Military Affairs
Amount
₹ 30 Cr
Amount:
₹ 30 Cr
Indian Railway
2 days left
Supply Of Aluminium Chequered Sheet Size 2.03 Mm X 1220-1500 Mm X 2440-3360 Mm To Rdso Specn. C-8217 Rev.-02. Note: Five Bar Pattern Is Acceptable. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
02 Jul 2026 12:00 PM
2 days left
Location
Patiala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Indian Railway
Supply Of Differential Amplifier To Sensor Oil Circuit As Per Clw Spec. No. Clw/es/3/0035 Alt.-h, & Str No. Clw/2020/eldo/e/str/0075 Rev- 0. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
20 Jul 2026 12:00 PM
20 days left
Location
Patiala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Military Engineer Services
Repair/ Replacement And Maint Of Storage Water Heater, Solar Water Heater Alongwith Allied Works At Tibri Mil Stn Under Ge Gurdaspur.
End Date
03 Jul 2026 12:00 PM
3 days left
Location
Gurdaspur, Punjab
Department
Refer doc
Amount
₹ 49 L
Amount:
₹ 49 L
Indian Railway
1 day left
Supply Of Polypropylene Components As Per Set List El 29170771 ( Rev-3) Specification: Clw/ms/3/065 Alt.-10. Drawing:1209-12.417-027 Alt.-1, 1209-16.417-026 Alt.- 1. And Str No. Clw/2023/eldo/m/166 Rev.-0. [ Warranty Period: 72 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
01 Jul 2026 12:00 PM
1 day left
Location
Patiala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
2 days left
Supply Of Lubricating Grease For Traction Motor Bearing (wap7, Wag9) 5780/052 (medium), Spec: Technical Data Sheet Of Servoplex Shc-120 (indian Oil Corporation). [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
02 Jul 2026 12:00 PM
2 days left
Location
Amritsar, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Punjab State Power Corporation Limited
2 hours left
Corrigendum : Repair & Maintenance Od D/s Sub Division Paldiat Kot Fatuhi Under Hoshiarpur Circle Tender Document
End Date
30 Jun 2026 12:00 PM
2 hours left
Location
Hoshiarpur, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Punjab State Power Corporation Limited
2 hours left
Corrigendum : Repair & Maintenance Of Ds Sub Urban Sub-division Hoshiarpur Under Hoshiarpurcircle. Tender Document
End Date
30 Jun 2026 12:00 PM
2 hours left
Location
Hoshiarpur, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
National Fertilizers Limited nfl
23 hours left
1;HYDRAULIC EXCAVATOR
End Date
01 Jul 2026 09:00 AM
23 hours left
Location
Bathinda, Punjab
Department
Department Of Fertilizers
Amount
Refer doc
Amount:
Refer doc
Indian Army
1 day left
3;Mobile Jammer for Div IDSC
End Date
01 Jul 2026 11:00 AM
1 day left
Location
Patiala, Punjab
Department
Department Of Military Affairs
Amount
Refer doc
Amount:
Refer doc
Punjab State Power Corporation Limited
2 hours left
G.i. Pipes And Fittings. Tender Documents Annexure-b
End Date
30 Jun 2026 12:00 PM
2 hours left
Location
Multi City, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Power Department
2 hours left
Dnit For Cuuting/removal Of Wild Grass From Non-yard Area At Various 09 No. Substations As Per Clause 5(e) Of Pstcl Horticulture Policy 2016 Under P And M Div Jamsher
End Date
30 Jun 2026 12:00 PM
2 hours left
Location
Jalandhar, Punjab
Department
Refer doc
Amount
₹ 4.73 L
Amount:
₹ 4.73 L
Power Department
1 day left
Corrigendum : 7804/p-1/emp-13315 Dtd.05.05.2026 For Procurement Of Mcbs, Icdp, Ictp Switches ,socket, Push Button Etc Under Ea Group For The Year 2026-27
End Date
01 Jul 2026 12:00 PM
1 day left
Location
Rupnagar, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
RAIL COACH FACTORY
Supply Of End Wall Assembly For Lhb Gs & Scn (amrit Bharat ) Coaches Note:-(1)in Drawings "mig Welding (131) Is To Be Read As Tig Welding (141)" As Per Design Letter No. Md46231 Dated 16.03.2024. ., As Per Drawing: 75415001 Alt. 'br2', Packing Instruction: Pi187ver2.0. [ Warranty Period: 84 Months After The Date Of Delivery ] ]
End Date
08 Jul 2026 12:00 PM
8 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Power Department
1 day left
Supply Of Hotline Tools For Live Line Maintenance Upto 400kv Substations And Transmission Lines Of Pstcl - Line Man Tool Bag, Ehv Trough-design Insulator Cradle Assembly, Swivel Boom Assembly Including Bases, Mast And Side Poles, Spliced Heavy Duty Hook Ladders Assembly(top, Middle And Bottom Section), Attachment For Ladder Assembly Includes Required Swivel Sticks- 8 Nos, Spreader Bar-2 Nos, Ladder Clamp- 5nos, Double Clamp- 2nos, Vertical And Horizontal Ladder Bases Each One., Platform Ladders, Universal Pole Of Minimum Length Of, I) 2.4meter, Ii) 3.0meter, Iii) 3.6meter, Iv) 4.2meter, Insulated Wire Tongs/ Spliced Wire Tongs Of Minimum Length Of, I) 3.6m Including Wire Tong Bands, Ii) 4.8m Including Wire Tong Bands, Insulated Strain Link Stick Of Minimum Length Of, I) 3.0meter, Ii) 3.6meter, Insulated Swivel Stick Of Minimum Length 2.4m, 3.0m And 3.5m, I) 2.4meter, Ii) 3.0meter, Iii) 3.5meter, Trolley Pole Suspension Insulator Tool, Insulated Static Ground, Insulated Telescopic Hot Stick:, All Angle Cog Wrench, I) 3.0meter, Ii) 3.6meter, Scaffold System Up To 15 Meters, Universal Tool Kit Consist Of Pin Holder, Cutout Tool Ratchet Wrench, Cotter Key Remover, Locating Pin, Ball Socket Adjuster, Screw Driver, Clear Vision Mirror, Shepherd Hook, Wrench Head, Insulator Fork, Spiral Disconnect, Cotter Key Tool, Universal Adopter, Ball Socket Cotter Key Remover, Clevis Pin Installer, Knocker, Ball Socket Adjuster, Chuck Blank, Cotter Key Installing Tool, Hacksaw And All Angle Plier, Bypass Clamp, I) Tower Type Wire Tong Saddle, Ii) Tower Type Saddle With Extensions, Pole Clamps, Nylon Rope Blocks With 45 Meter Long, 12mm Composite Fiber Braided Rope, Tool Hanger & Clamp, Live Line Tools Racks, Grip-all Clamp Stick Assist Ring, Swivel Hook Ladder, Ratchet Wrench Including Hex Socket Sets, Tool Bucket, Composite Fiber Braided Rope Of 180 Meter Length:, I) 10mm, Ii) 12mm, Iii) 20mm, Poly Dacron Rope 16mm, Polypropylene Rope 12mm, Conductive Suits, I) Medium (set Of Pan...
End Date
01 Jul 2026 12:00 PM
1 day left
Location
Ludhiana, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
1 day left
Supply Of Underframe Complete For Lhb Slrd Amrit Bharat Coaches Note:-(1)special Condition As Per Annexure-abc Dy Cple-iii Letter No. Rcf/hsq/plg/mpsh/510003 Dated 27/05/2024. Note-(2).mounting Arrangement On Underframe For Biological Tank As Per Drg No. Lr11961 Alt ' F ', As Per Drawing: Lr11991 Alt. 'a' Note:- Shot Blasting Or Grit Blasting As Per Mdts-166 (latest), Packing Instruction: Pi042 Ver 3.0 [ Warranty Period: 84 Months After The Dateof Delivery ] ]
End Date
01 Jul 2026 12:00 PM
1 day left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Indian Railway
1 day left
Supply Of Complete Cubicle-f, Along With All Equipments, Hardware & Wiring/cabling To Clw Specification No. Clw/es/3/0652 Alt.- D, Clw Drg. No. 1209/15/143/003 Alt- 2, Str No. Clw/2023/eldo/e/str/0168 Rev.- 0. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
01 Jul 2026 12:00 PM
1 day left
Location
Patiala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Indian Railway
Supply Of Axle Box Complete Without Bearing (cru-150) To Set List No. El29010044 Rev. 08, Specn. No. Clw/ms/3/003 Alt. 5, Str No. Clw/2020/eldo/m/str/020 (rev. 2) And Drg. No. 1209-01.111-005 Alt. 3, 1209-01.111-006. Alt. 2, & 1209-01.111-007 Alt. 3. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
06 Jul 2026 12:00 PM
6 days left
Location
Patiala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
RAIL COACH FACTORY
Supply, Installation, Commissioning And Testing Of Ep Brake Equipment For 3phase Memu/tc Coaches To Rdso Specification Rdso/2013/cg-03 And To Drawing/material Schedule No. Icf/sk-10-2-573 ,issue Status :01 Rev.03, Cs-01, Cs-02 (without Item At Sr.no. 3.5 & 3.6) & Cs-03. Note: Scope Of Installation, Commissioning & Testing Is As Per Letter No. Rcf/mp/510002/3ph/02 Rev-00 Dated 05-08-2019 Issued By Dy Cple-iii . [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
07 Jul 2026 12:00 PM
7 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
South Eastern Railway
1 day left
Supply Of Kit Consists Of Two Piece Design Water Tank Assembly Of 390 Litres Capacity Of Each - (a) Water Tank Assembly (rh-390 Litres) To Rcf/kapurthala's Drg. No. Lg63105, Alt.-g, Qty. -01 No. And(b) Water Tank Assembly (lh-390 Litres) To Rcf/kapurthala's Drg. No. Lg63106, Alt.-g, Qty. -01 No. Drawing: As Mentioned In Description Matl.& Specn : As Per Drawing. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variationpermitted: Max 8 Lacs ] ]
End Date
01 Jul 2026 12:00 PM
1 day left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Set Of End Part (driving & Non-driving End ) For 3phase Memu/dmc [note:- For Details Of Free Supply Items & Loose Items Please See Annexure 'c' Ver 04], As Per Drawing:mp18endpt3phdmc Version 8, Packing Instruction: Pi100 Ver1.0. [ Warranty Period: 84 Months After The Date Of Delivery ] ]
End Date
13 Jul 2026 12:00 PM
13 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Indian Railway
1 day left
Supply Of Fuel Filling Connection Arrgt For Detc/us As Per Drawing No. Dmw-detc/us-9-0-014 Alt. Z. Note: Fuel Filling Connection Arrgt For Detc/us As Per Drawing No. Dmw-detc/us-9-0-014 Alt. Z. Note: (1) Item No.-13 Of Drg. No. Dmw-detc/us-9-0-014 Alt. Z. Materialto Be Used Is:2062-2011 Gr E250a Instead Of Is:2062-06 E-250 A. (2) Mig Welding To Be Used For Manufacturing Of Subject Item. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
01 Jul 2026 12:00 PM
1 day left
Location
Patiala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Select a tender to view details
The Problem
Why Punjab Tenders Get Rejected at the Technical Stage
These are the most common rejection reasons our team sees — all 100% avoidable with the right support.
Punjab Vendor Registration Missing
Valid Punjab vendor registration is a prerequisite — unregistered vendors are rejected before technical evaluation begins.
Incorrect EMD Instrument
EMD not submitted as a Bank Guarantee from an approved bank — Punjab rejects non-compliant EMD instruments immediately.
QR Threshold Not Met
Annual turnover or similar work experience falling below the NIT-specified threshold — always verify QR before bidding.
Missing Experience Certificate
Similar work completion certificate not in Punjab's prescribed format or not covering the required period and value.
Non-Compliant Bid Format
Technical bid not formatted, indexed, and uploaded as per Punjab's standard tender document conditions.
Expired Statutory Documents
GST registration, PAN, or trade licence copies not current at the time of bid submission.
The Solution
Everything You Need to Win Punjab Tenders — In One Platform
End-to-end bid support from documentation to order confirmation.
Documentation
Complete Punjab bid documentation — vendor registration, EMD, QR certificates, and all compliance documents prepared by our team.
AI Eligibility + Expert Docs
AI checks your eligibility against Punjab tender criteria instantly — expert team handles document creation for qualifying bids.
Post-Bid Support
Post-bid support including TQ responses and liaisoning with Punjab procurement teams through evaluation and award.
Our Process
How It Works — 4 Simple Steps
1
Eligibility Check
WhatsApp company profile, AI checks QR fit within 2 hours
2
Document Review
we audit existing documents against tender requirements
3
Bid Preparation
we prepare all technical & financial folders, 100% compliant
4
Submit & Win
submission supported through evaluation
FREE DOWNLOAD
Punjab Tender Checklist:
10 Must-Have Documents
10 Must-Have Documents
The exact checklist our team uses for every Punjab bid — never get
rejected for a missing document.
FAQ
Frequently Asked Questions about Punjab Bidding
Chat with a Punjab tender Expert