Northern Railway Tenders — Updated March 2026
Latest Northern Railway Tenders — Live NR E-Tender Listings
GeMTech PARAS tracks live Northern Railway tenders across all six divisions — Delhi, Ambala, Ferozepur, Lucknow, Moradabad, and Allahabad — into one searchable platform. Our AI checks your eligibility for every NR tender instantly and our expert team prepares complete bid documentation.
Read More
Track every active Northern Railway tender — civil, electrical, signalling, supply, and AMC — across all NR divisions. AI eligibility before you bid.
1,297
Northern Railway Tenders Tracked
348+
Clients Across India
4.9★
Google Rating
24hr
Response Turnaround
98%
Compliance Rate
Showing 1 to 25 of 1,297
for Northern Railway Tenders
Northern Railway
Supply Of Contact Segment Assembly Type 'c' As Per Clw Drg. No. 3twd.101.109 Alt-5 In Sheet No.1 & 3twd.101.109 Alt-2 In Sheet No.2 (2 Sheets) [ Warranty Period: 30 Months After T He Date Of Delivery ]
End Date
16 Dec 2026 12:00 PM
146 days left
Location
Lucknow, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Corrigendum : Supply Of Cushion For Transverse Middle Berth For Scn/lcn. Drawing No.:- Ls61178, Alt. (nil) Item- 6 Specification: - C-k607 (rev.-2 Of Dec.-2015) Amendment.-1 Of Aug.2016 [ Warranty Period: 30 Months After The Date Of Delivery ]
End Date
12 Aug 2026 12:00 PM
20 days left
Location
Yamunanagar, Haryana
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Corrigendum : Supply Of Maintenance Kit For Double Brake Indicator Ftrtil Part No.790 045 110 (for Faiveley Make Air Brake System) Of Lhb Coaches As Per Pdf Attached. [ Warranty Period: 36 Months After The Date Of Delivery ] ]
End Date
27 Aug 2026 12:00 PM
35 days left
Location
Lucknow, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Corrigendum : Supply Of Bush For Brake Beam Drawing No. :- Contr-9404-s/17, Alt-10, Item No- 6 [ Warranty Period: 30 Months After The Date Of Delivery ]
End Date
27 Jul 2026 12:00 PM
4 days left
Location
Yamunanagar, Haryana
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Corrigendum : Supply Of Polyurethane Thinner (compatible To Pu Paint). Specification:- Rdso Specification No. M&c/pcn/109/2020_(rev. 1.0) With Rdso Amendment No. 1b (rev.2.0) As An Additional Requirement. Special Terms & Conditions:- (i) Material Shall Be Packed In 20 Ltrs. Metal Containers Conforming To Is:2552/1989_amend.1(third Revision) (reaffirmed 2018) Grade B-1. (ii) The Goods Should Be Dispatched Within 04 Months From The Date Of Manufacturing And Firm Will Give An Undertaking That The Material Supplied Is Not More Than 04 Months Old. (iii) - Keeping Properties:- Min. 12 Months From The Date Of Manufacture Which Shall Be Subsequent To The Date Of Placement Of Contract. (iv) Suppliers Have To Write On The Containers Batch No., Date, Month, Year Of Manufacturing And Also Write The Paint Can Be Used Before 12 Months From The Date Of Manufacturing. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
14 Sept 2026 12:00 PM
53 days left
Location
Yamunanagar, Haryana
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
13 hours left
Supply Of Water Reservoir Assembly For Wiper As Per Clw Drawing No.1209-07-303-020 Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
23 Jul 2026 12:00 PM
13 hours left
Location
Ghaziabad, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Supply Of Frp Glass Shutter Assembly For 3 Feet Windows To Icf Drg. No. Icf/sk/5-4-196, Item No.1 To 17, Alt. B . [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
10 Aug 2026 12:00 PM
18 days left
Location
Lucknow, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Supply Of Dowel Pin For Coupler To Is:6401/1986, Each Set Contsisting Of 02 Items 1. Dowel Pin Size Od-10 Mm, Id-8mm Length 20 Mm, Dowel Pin Od-10 Mm, Length 60 Mm. [ Warrantyperiod: 30 Months After The Date Of Delivery ] ]
End Date
28 Jul 2026 12:00 PM
5 days left
Location
Ghaziabad, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
13 hours left
Supply Of Earthing Shunt For 3 Phase Locomotives (wap-7 & Wag-9) Of 120 Mm Sq, 750 Volts,length:600 Mm. Both End Fitted With Copper Cable Socket For Cable Size 120 Mm Sq. Stud Dia-14 Mm & Mechanical Splicing Portion Duly Covered By Insulated Cable Jacket Of Suitable Size [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
23 Jul 2026 12:00 PM
13 hours left
Location
Ghaziabad, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
13 hours left
Supply Of O-ring Din3771-180x4-n-nbr 70 As Per Medha Part No. Sptsa700013p0025 Size 180mmx4mm Material Nbr-70 For Medha Traction Motor Type Tme 48-45-6. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
23 Jul 2026 12:00 PM
13 hours left
Location
Ghaziabad, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Supply Of Ss Tube (ss 304) Size 1/2" O.d. (12.7 Mm) Xthickness (1.55 Mm) As Per Astm A269 Gr.tp 304, As Per Icf Specification.icf-md-spec-166. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
28 Jul 2026 12:00 PM
5 days left
Location
Ghaziabad, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Supply Of Gear Flywheel Ring Part No. 4851 [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
28 Jul 2026 12:00 PM
5 days left
Location
Ghaziabad, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
13 hours left
Supply Of Door Handle Set For Body Side Sliding Door Drg. No- Icf/mrvc/m/ss 5-8-004 Alt. D [ Warrantyperiod: 30 Months After The Date Of Delivery ] ]
End Date
23 Jul 2026 12:00 PM
13 hours left
Location
Ghaziabad, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
13 hours left
Supply And Installation Of Modular Stand Type Stainless Steel Wash Basin, Material Ss-304, 16 Gauge, As Per Annexure A Attached [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
23 Jul 2026 12:00 PM
13 hours left
Location
Ghaziabad, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Supply Of Metallic Capsules (sintered Bronze) For Pipe Line Filter As Per Rdso Drg. No. Cg - K - 5032. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
28 Jul 2026 12:00 PM
5 days left
Location
Lucknow, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Balance Work Of Fob At Delhi Inderpuri Halt In The Section Of Sse/w/hnzm Under Aden/hnzm.
End Date
09 Dec 2026 12:00 PM
139 days left
Location
Delhi, Delhi
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Supply Of Sheet Metal Screw Size 10x38 Mm To Is: 7173-1974. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
29 Jul 2026 12:00 PM
6 days left
Location
Ghaziabad, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Supply Of 2025-26 (ami No. 33.1.1) Mueller Hinton Agar Equivalent To M173 Of Hi-media, Pack Size - 500 Gram/ Pack (13 Items Clubbed).
End Date
14 Dec 2026 12:00 PM
144 days left
Location
Delhi, Delhi
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Supply Of Set Of Copper Pipes For Elgi Make Compressor Consisting Of 04 Items One No Each- (1) Delivery Pipe A With Flange To Elgi Pt. No. 070304930, (2) Delivery Pipe B With Flange To Elgi Pt. No. 070304960, (3) Pipe Cic Tp Hp Cylinder To Elgi Pt No.070401400, (4) Pipe D Cylinder To Ac Elgi Pt No.070301530. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
30 Jul 2026 12:00 PM
7 days left
Location
Ghaziabad, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Supply Of Guide Bush For Axle Box Guide Arrangement To Drg. No. Emu/ M-0-1-023, Alt. E Item No.1col. I. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
12 Aug 2026 12:00 PM
20 days left
Location
Lucknow, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Supply Of Lock Pin For Centre Pivot & Side Bearer Assembly. Drawing No. :- Contr-9404-s/8, Alt-15, Item No-3 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
30 Jul 2026 12:00 PM
7 days left
Location
Delhi, Delhi
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Supply Of Spool Body With Mm Threads For Use In Sand Ejectors Of 3 Phase Wag-9/wap-7 Locos As Per Drawing No. Ngp/trs/4/25.205 Alt 0. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
30 Jul 2026 12:00 PM
7 days left
Location
Ghaziabad, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Supply Of Hammer Sledge Double Faced 3.2kgs Is:841/1968 Table-iii. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
28 Jul 2026 12:00 PM
5 days left
Location
Lucknow, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Supply Of Articulation Bearing Sub Assembly For Outer End Coupler Drg. No. Esc: 40 Sk-3021 (4) Wsf:40-sk - 1960(3) Or Equivalent Part Nos. Of Rdso Approved Firms Confirming To Rdso Spec No. 61-b-36 Rev-68-1 With Amendment No.1 Of Oct-2016. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
20 Aug 2026 12:00 PM
28 days left
Location
Lucknow, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Northern Railway
Supply ,installation, Testing And Commission Of Vfd Drive 7.5 Kw Operating Voltage-415 Volt Make- Yaskawa, Siemens, Schneider [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
28 Jul 2026 12:00 PM
5 days left
Location
Ghaziabad, Uttar Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Select a tender to view details
The Problem
Why Northern Railway Tenders Get Rejected
These are the most common rejection reasons our team sees — all 100% avoidable with the right support.
Northern Railway Vendor Registration Missing
Valid Northern Railway vendor registration is a prerequisite — unregistered vendors are rejected before technical evaluation begins.
Incorrect EMD Instrument
EMD not submitted as a Bank Guarantee from an approved bank — Northern Railway rejects non-compliant EMD instruments immediately.
QR Threshold Not Met
Annual turnover or similar work experience falling below the NIT-specified threshold — always verify QR before bidding.
Missing Experience Certificate
Similar work completion certificate not in Northern Railway's prescribed format or not covering the required period and value.
Non-Compliant Bid Format
Technical bid not formatted, indexed, and uploaded as per Northern Railway's standard tender document conditions.
Expired Statutory Documents
GST registration, PAN, or trade licence copies not current at the time of bid submission.
The Solution
Everything You Need to Win Northern Railway Tenders
End-to-end bid support from documentation to order confirmation.
Documentation
Complete Northern Railway bid documentation — vendor registration, EMD, QR certificates, and all compliance documents prepared by our team.
AI Eligibility + Expert Docs
AI checks your eligibility against Northern Railway tender criteria instantly — expert team handles document creation for qualifying bids.
Post-Bid Support
Post-bid support including TQ responses and liaisoning with Northern Railway procurement teams through evaluation and award.
Our Process
How It Works — 4 Simple Steps
1
Eligibility Check
WhatsApp company profile, AI checks QR fit within 2 hours
2
Document Review
we audit existing documents against tender requirements
3
Bid Preparation
we prepare all technical & financial folders, 100% compliant
4
Submit & Win
submission supported through evaluation
FREE DOWNLOAD
Northern Railway Tender Checklist:
10 Must-Have Documents
10 Must-Have Documents
The exact checklist our team uses for every Northern Railway bid — never get
rejected for a missing document.
FAQ
Frequently Asked Questions about Northern Railway Bidding
Chat with a Northern Railway tender Expert