- Splitting
- Advisory Bank
- Reserved for MII
- Reserved for MSE
- Bid to RA Enabled
- Evaluation Method
- MSE Purchase Preference
- MSE Exemption
Splitting
Advisory Bank
Reserved for MII
Reserved for MSE
Bid to RA Enabled
Evaluation Method
MSE Purchase Preference
MSE Exemption
Showing 1 to 25 of 1,242 results for Eastern Railway Tenders
Eastern Railway
Supply Of Kit Of Spares For 2/3 Way Air Filter(wsf Make) Comprising Of One No. Each: (a) Gasket (b) Gasket (c) Deflector (d) Gasket (e) Sinter Bronze Metallic Capsule For Emu/me Mu.specification/drg.no. To M/s Wsf Pt.nos. (a) Ib70629 (b) Ia70946/1 (c) Ib70671 (d) Ia70946/2 (e) Rdso's Drg.no. Cg-k-5032 Alt.1 Or, Kpa Drg.no.er/kpa/el/pn.3he.2300 H & Item No.2,5,6,7 & 8. [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Supply Of Pair Of Ferrozal Bushes With Upper & Lower For Schaku Coupler Of Emu Coa Ches To (i) M/s. Escorts Drg. No. Upper : 40-524-07-03 (4) & Lower: 40-524-07-04 (4) (ii) M/s. Wsf's D Rg. No. 40-524-07- 03 (4) & Lower : 40-524-07-04 (4) , (iii) M/s. Sanrok's Drg. No. 2ed-181-1091 & 2ed - 181-1089, Rdso's Spec. No.61- B-36 Rev. 68-1 With Amendment No. 1 Of October -2016 [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Supply Of Body Side Window Assembly With Fixed Louver Shutter Bottom Shutter Assembly Moveab Le As Per Drg. No.-icf/mrvc/d/bt-5-4-003, Alt. D, Item No.-3. [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Supply Of Relay Qrsi 1 & 2 Type
Eastern Railway
Supply Of Suspension Spring
Eastern Railway
Supply Of Modified Elastomeric Pad (design-a) Etc.
Eastern Railway
Supply Of Rubber Buffer Spring For 1225 Kgm. Capacity Buffer To Rdso's Sk-k2048, Alt. No. Nil And Rdso's Str No. C-k210(rev-3) Of Feb 2006 With Amendment Slip No.1 Of October 2016. [ Warranty Period: 24 Months After The Date Of Delivery ]
Eastern Railway
Supply Of Axle Suspension Bearing Oil For Bgac Emu / Memu Fitted With 4601 Az\bx Type Traction Motor. Specification With /drg No Servo System -57 Or Servo System-68 Of M/s Ioc Talpa - 30 Or Sheel Hydrolic Oil -68 (sho-68) Of M/s Sheel Or Mak Hydrol- 68 Of M/s Bpcl Or Enklo-57 And Enklo -68 Of M /s Hpcl. [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Supply Of Gasket For 20 Mm Nb Pipe To Rdso's Drg.no.wd-83062-s-07, Item No.1, Alt No.6. [ W Arranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Supply Of Breaker Circuit Dynamic Brake Control 10 Amps To Emd Pt.no.9322826 For W Dg 4 Locomotives. [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Supply Of Stainless Steel Pipe 20 Mm Bore Complete With Socket 20mm, Flange 20 Mm, Socke T 20 Mm (special) And Flange 20 Mm (special) To Rdso's Drg. No. Wd-80007-s-11, Item No. 8, 15, 16, 17 & 18, Alt No. 12 And Pipe Will Be Stainless Steel To Astm-a312 Schedule 40 S Gr.tp 304 (erw). (as Per Rdso's Letter No. Mw/apb Dtd. 22.05.2020). [ Warranty Period: 30 Months After The Date Of Deli Very ]
Eastern Railway
Supply Of Suspension Tube Roller Bearing [rwe ]
Eastern Railway
Supply Of Door Arrangements R.h And L.h For Lhb Coaches As Per Rcf's Drg. No. La51100, Alt. No .-b. [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Supply Of Spheroelastic Rubber Bearing For Cbc Coupler Body Assembly For Aar "h" Type As Per D Rawing No. Fasl/sb/0848 To Rdso Specification No. Rdso/2011/cg-03, (rev-1). [ Warranty Period: 48 Months After The Date Of Delivery ]
Eastern Railway
Corrigendum : Supply Of Electro Valve Energised To Open Used In Locos. As Per Clw Specn. No. Clw/es/m-2/i. [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Supply Of Distributor Valve Complete Etc.
Eastern Railway
Supply Of Pressure Transformer Complete Etc
Eastern Railway
Supply Of Bogie Centre Pivot Top For Casnub Bogie Etc.
Eastern Railway
Supply Of Bogie Centre Pivot Bottom For Casnub Bogie Etc.
Eastern Railway
Supply Of Electric Key Transmitter (rotary Type) As Per Drawing No Sa-22601 (alt-4) (with Latest Alt If Any) To Specification No. Irs:s-21/2001 (with Amdt Up To Date); Ward No = 24. [ Warranty Perio D: 30 Months After The Date Of Delivery ]
Eastern Railway
Supply Of Honeycomb Partition Frame Set For Ac 3tier(eog) Coach. As Per Technical Specificati On No Mdts 097 Rev 01, Planning Set List No. Mplhcpf3aceglhb Version 23, Packing Instruction - Pi118 Ver.01 Or Latest Version As Per Mcf Pl. No. 33574662 [ Warranty Period: 30 Months After The Date Of Del Ivery ]
Eastern Railway
Supply Of Member Complete As Per Drg No. 2.10113.0.03.100.010 ( Under Slung Water Tank Suspensio N Bracket ) [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Supply Of Channel As Per Drg No. Ls 11221 [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Supply Of Channel As Per Drg No. Ls 11220 [ Warranty Period: 30 Months After The Date Of Delivery ]
Eastern Railway
Supply Of Narrow Jaw Adapter Fitted For Ctrb Class 'e' 6"x11" In Casnub Type Bogie To Rdso's Drg . No. Wd-89067-s/9, Alt No. -11 And Rdso's Str No. Ab/rb-40-2016 (rev. 2) Of June 2021. [ Warrant Y Period: 48 Months After The Date Of Delivery ]
Select a tender
Eastern Railway Tenders
The Eastern Railway zone, headquartered in Kolkata, covers key railway divisions such as Howrah, Asansol, Sealdah, and Malda. From massive infrastructure projects to daily operational requirements, Eastern Railway eTenders offer high-value opportunities for vendors and contractors across India. Whether you're targeting Eastern Railway tenders in Asansol or Howrah, or seeking all active Eastern Railway tenders, GeMTech PARAS ensures that you never miss a procurement notice relevant to your business.