National Institute Of Ocean Technology niot
Tamil Nadu | Chennai |
- Download
Time left to bid
10
Days13
Hours25
MinutesTender Roadmap
Publish Date
14 Aug 2024
Tender is published for seller Participation.
Bid Submission End Date
30 Sept 2024
Last day to participate Tender on GeM platform.
Evaluation Date
30 Sept 2024
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
XXXXXXX | ||||||||||
Tender Amount | ||||||||||
XXXXXXX | ||||||||||
Department | ||||||||||
Department Of Earth Sciences | ||||||||||
Item Category | ||||||||||
Fabrication supply and transportation of end clump steel of weight In air and delivery at project site Inclusive of GST Fabrication supply and transportation of all concrete blocks as per the drawings delivery at project site Inclusive of GST Trenching up to minus 2 C point D including onshore and offshore 80 m x 3 Inclusive of GST WeldingofHDPEpipelineincludingsupplyofmachinemanpower materialmobilizationanddemobilizationanchoringsystemforse curingthepipelineinthelagoonandaligningHDPEpipelineasitgr owsintothelagoonforwelding Mobilization and Demobilization of all required marine spread for all marine operations Inclusive of GST Assembly of attachments and load out of the pipeline Inclusive of GST Installation of the coldwater pipeline towing lowering and topend connection to onshore sump Inclusive of GST Manpower divers seamen skilled assistants etc Inclusive of GST Installation of warm water intake and discharge pipeline Inclusive of GST All risk Insurance during welding and deployment of cold water pipeline Inclusive of GST | ||||||||||
Purchaser Address | ||||||||||
601302,National Institute of Ocean Technology Velacherry Tambaram Main road,Pallikarnai Chennai 600100 | ||||||||||
Work Description | ||||||||||
Joining and Installation of HDPE Pipeline for OTEC Powered;387; Fabrication supply and transportation of end clump steel of weight In air and delivery at project site Inclusive of GST Fabrication supply and transportation of all concrete blocks as per the drawings delivery at project site Inclusive of GST Trenching up to minus 2 C point D including onshore and offshore 80 m x 3 Inclusive of GST WeldingofHDPEpipelineincludingsupplyofmachinemanpower materialmobilizationanddemobilizationanchoringsystemforse curingthepipelineinthelagoonandaligningHDPEpipelineasitgr owsintothelagoonforwelding Mobilization and Demobilization of all required marine spread for all marine operations Inclusive of GST Assembly of attachments and load out of the pipeline Inclusive of GST Installation of the coldwater pipeline towing lowering and topend connection to onshore sump Inclusive of GST Manpower divers seamen skilled assistants etc Inclusive of GST Installation of warm water intake and discharge pipeline Inclusive of GST All risk Insurance during welding and deployment of cold water pipeline Inclusive of GST
|
||||||||||
Corrigendum | ||||||||||
|
||||||||||
My Evaluation Notes | ||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.
CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.