Govt. Tenders
Found 167 tenders for your search .
14; Food testing system 1 Food testing system 2 Food testing system 3 Food testing system 4 Food testing system 5 Food testing system 6 Food testing system 7 Food testing system 8 Food testing system 9 Food testing system 10 Food testing system 11 Food testing system 12 Food testing system 13 Food testing system 14
Read MorePublish Date | 26 Mar 2025 | |
Bid Submission End Date | 16 Apr 2025 | |
Earnest Amount | 3.93 L | |
Tender Amount | 1.97 Cr |
Publish Date | 26 Mar 2025 | |
Bid Submission End Date | 16 Apr 2025 | |
Earnest Amount | 3.93 L | |
Tender Amount | 1.97 Cr |
20; Desktop Computer
Read MorePublish Date | 29 Mar 2025 | |
Bid Submission End Date | 21 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 29 Mar 2025 | |
Bid Submission End Date | 21 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
REPAIR AND MAINTENANCE OF FIBER OPTIC BACKBONE;7650; Supply of 48 core 9 125 250 Singlemode dry core Multi tube ECSS Armor Bend insensitive Outside Plant Fiber Cable HDPE Sheath Supply of 48 core 9 125 250 Singlemode dry core Multi tube ECSS Armor Bend insensitive Outside Plant Fiber Cable HDPE Sheath same as serial No 1 Supply of Outdoor Fiber Optic Joint Closure dome and base type with mechanical seals IP68 rated outdoor suitable for upto 48F splice Supply and installation of 4 inch diameter and 6 meter length GI Pipe ISI Marked to be fixed on the pillars of boundary walls using GI Clamps Laying and pulling of Fiber Cables 48 core OFC Steel Messenger Wire of 6 sqmm and PVC Spiral Support for the OFC Cable between GI Pipes
Read MorePublish Date | 26 Mar 2025 | |
Bid Submission End Date | 16 Apr 2025 | |
Earnest Amount | 1 L | |
Tender Amount | Refer Doc |
Publish Date | 26 Mar 2025 | |
Bid Submission End Date | 16 Apr 2025 | |
Earnest Amount | 1 L | |
Tender Amount | Refer Doc |
Supply Of Electrocautery Machine (v2) (q2)
Read MorePublish Date | 27 Mar 2025 | |
Bid Submission End Date | 28 Apr 2025 | |
Earnest Amount | 62 K | |
Tender Amount | Refer Doc |
Publish Date | 27 Mar 2025 | |
Bid Submission End Date | 28 Apr 2025 | |
Earnest Amount | 62 K | |
Tender Amount | Refer Doc |
Providing Of Canteen Service - Best Price On Fixed Menu Rate Model - Vegetarian, Non-vegetarian; Breakfast, Lunch, Dinner, Snacks; Inside Building Premises (exclusive For Employees/ Patients/ In House Personnel)
Read MorePublish Date | 26 Mar 2025 | |
Bid Submission End Date | 25 Apr 2025 | |
Earnest Amount | 5.6 L | |
Tender Amount | 2.8 Cr |
Publish Date | 26 Mar 2025 | |
Bid Submission End Date | 25 Apr 2025 | |
Earnest Amount | 5.6 L | |
Tender Amount | 2.8 Cr |
Construction Of R.c.c Building For Workshop, Laboratories, Examination Center &cdl, Smart Class, Teachers Room, Etc At Shillong Polytechnic
Read MorePublish Date | 27 Mar 2025 | |
Bid Submission End Date | 21 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 Mar 2025 | |
Bid Submission End Date | 21 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Redevelopment Of Anjalee Junction
Read MorePublish Date | 27 Mar 2025 | |
Bid Submission End Date | 22 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 Mar 2025 | |
Bid Submission End Date | 22 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
4; ICU Ventilators V2 Q2 Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 18 Lakh s OEM Average Turnover Last 3 Years/ 3 3 18 Lakh s Years of Past Experience Required for same/similar service/ 45 45 3 Year s MSE Exemption for Turnover/ 78 78 Yes Startup Exemption for Turnover/ 78 78 Yes
Read MorePublish Date | 17 Mar 2025 | |
Bid Submission End Date | 16 Apr 2025 | |
Earnest Amount | 1.2 L | |
Tender Amount | Refer Doc |
Publish Date | 17 Mar 2025 | |
Bid Submission End Date | 16 Apr 2025 | |
Earnest Amount | 1.2 L | |
Tender Amount | Refer Doc |
Renovation Of 02 Nos. Field Hostel At Powergrid 400/220kv Misa Substation
Read MorePublish Date | 13 Mar 2025 | |
Bid Submission End Date | 19 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 13 Mar 2025 | |
Bid Submission End Date | 19 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Assets Insurance Service - All Risk Policy Property Damage Cover Standard Fire Special Perils Cover Storm Typhoon Hurricane Tornado Flood and Inundation STFI Cover Business Interruption Loss of Profit Cover MBD Machinery breakdown Co.. Contract Period/ 1 Years MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Certificate Requested in ATCAdditional Doc 1 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ No Bid to RA enabled/ Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid/Two Packet Bid
Read MorePublish Date | 18 Mar 2025 | |
Bid Submission End Date | 16 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 18 Mar 2025 | |
Bid Submission End Date | 16 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Fully Automated Coagulation Analyzer (v2) (q2)
Read MorePublish Date | 28 Mar 2025 | |
Bid Submission End Date | 28 Apr 2025 | |
Earnest Amount | 70 K | |
Tender Amount | Refer Doc |
Publish Date | 28 Mar 2025 | |
Bid Submission End Date | 28 Apr 2025 | |
Earnest Amount | 70 K | |
Tender Amount | Refer Doc |
Expansion Of Barapani (shillong) Airport Including Runway Extension, Expansion Of Terminal Building And Apron And Other Allied Works. Sh Airside Works (phase-i)
Read MorePublish Date | 28 Mar 2025 | |
Bid Submission End Date | 23 May 2025 | |
Earnest Amount | 3.58 Cr | |
Tender Amount | 119.44 Cr |
Publish Date | 28 Mar 2025 | |
Bid Submission End Date | 23 May 2025 | |
Earnest Amount | 3.58 Cr | |
Tender Amount | 119.44 Cr |
Supply Of Thermal Paper Upp-110s (usg)
Read MorePublish Date | 28 Mar 2025 | |
Bid Submission End Date | 21 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 28 Mar 2025 | |
Bid Submission End Date | 21 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
1; Potable Water Purification System DE - Ionization Based Q3 Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 6 Lakh s OEM Average Turnover Last 3 Years/ 3 3 6 Lakh s Years of Past Experience Required for same/similar service/ 45 45 3 Year s MSE Exemption for Turnover/ 78 78 Yes Startup Exemption for Turnover/ 78 78 Yes
Read MorePublish Date | 19 Mar 2025 | |
Bid Submission End Date | 16 Apr 2025 | |
Earnest Amount | 40 K | |
Tender Amount | 20 L |
Publish Date | 19 Mar 2025 | |
Bid Submission End Date | 16 Apr 2025 | |
Earnest Amount | 40 K | |
Tender Amount | 20 L |
Provision Of Retaining Wall And Slope Protection At Rangapahar Military Station Under Ge 868 Ews
Read MorePublish Date | 20 Mar 2025 | |
Bid Submission End Date | 18 Apr 2025 | |
Earnest Amount | 4.24 L | |
Tender Amount | Refer Doc |
Publish Date | 20 Mar 2025 | |
Bid Submission End Date | 18 Apr 2025 | |
Earnest Amount | 4.24 L | |
Tender Amount | Refer Doc |
Construction Of Water Harvesting Structures
Read MorePublish Date | 22 Mar 2025 | |
Bid Submission End Date | 06 May 2025 | |
Earnest Amount | 24.85 L | |
Tender Amount | Refer Doc |
Publish Date | 22 Mar 2025 | |
Bid Submission End Date | 06 May 2025 | |
Earnest Amount | 24.85 L | |
Tender Amount | Refer Doc |
Construction Of Water Harvesting Structures
Read MorePublish Date | 21 Mar 2025 | |
Bid Submission End Date | 02 May 2025 | |
Earnest Amount | 12.71 L | |
Tender Amount | Refer Doc |
Publish Date | 21 Mar 2025 | |
Bid Submission End Date | 02 May 2025 | |
Earnest Amount | 12.71 L | |
Tender Amount | Refer Doc |
Tender For Fresh / Renewal Of Contractors Registration For Execution Of Various Works
Read MorePublish Date | 21 Mar 2025 | |
Bid Submission End Date | 30 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 21 Mar 2025 | |
Bid Submission End Date | 30 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Constructions Of Water Harvesting Structures In West Khasi Hills
Read MorePublish Date | 25 Mar 2025 | |
Bid Submission End Date | 08 May 2025 | |
Earnest Amount | 6.88 L | |
Tender Amount | Refer Doc |
Publish Date | 25 Mar 2025 | |
Bid Submission End Date | 08 May 2025 | |
Earnest Amount | 6.88 L | |
Tender Amount | Refer Doc |
Providing Of Water Harvesting Structure At East Khasi Hills
Read MorePublish Date | 25 Mar 2025 | |
Bid Submission End Date | 08 May 2025 | |
Earnest Amount | 6.59 L | |
Tender Amount | Refer Doc |
Publish Date | 25 Mar 2025 | |
Bid Submission End Date | 08 May 2025 | |
Earnest Amount | 6.59 L | |
Tender Amount | Refer Doc |
Change over Switch;1310; Change Over Switch 2 Pole 16 Amp Change Over Switch 2 Pole 32 Amp Change Over Switch 2 Pole 63 Amp Change Over Switch 3 Pole 63 Amp Change Over Switch 3 Pole 100 Amp Change Over Switch 3 Pole 200 Amp Change Over Switch 3 Pole 400 Amp Change Over Switch 4 Pole 63 Amp
Read MorePublish Date | 04 Apr 2025 | |
Bid Submission End Date | 25 Apr 2025 | |
Earnest Amount | 2.6 L | |
Tender Amount | Refer Doc |
Publish Date | 04 Apr 2025 | |
Bid Submission End Date | 25 Apr 2025 | |
Earnest Amount | 2.6 L | |
Tender Amount | Refer Doc |
Provn Of Single Living Accn For Jcos At Military Station Agartala Under Age(i) Agartala
Read MorePublish Date | 27 Mar 2025 | |
Bid Submission End Date | 17 Apr 2025 | |
Earnest Amount | 2.55 L | |
Tender Amount | Refer Doc |
Publish Date | 27 Mar 2025 | |
Bid Submission End Date | 17 Apr 2025 | |
Earnest Amount | 2.55 L | |
Tender Amount | Refer Doc |
Expression of Interest For Bms Cctv Access Control Etc At Meghalaya Sdc
Read MorePublish Date | 29 Mar 2025 | |
Bid Submission End Date | 21 Apr 2025 | |
Earnest Amount | 5 L | |
Tender Amount | Refer Doc |
Publish Date | 29 Mar 2025 | |
Bid Submission End Date | 21 Apr 2025 | |
Earnest Amount | 5 L | |
Tender Amount | Refer Doc |
Supply Of Kojic Acid Plus Hydroquinone Plus Vit C Plus Lactic Acid Antipolln Cream Tube Of 15m , Aloveraq Plus Vit E Cream Of 150gm , Hesperin And Arbutin Vitamin E And Vitamin K Cucumber Extract And Green Tea Extract Almond Oil And Liquid Parafin Tube Of 15 Gm , Tea Free Lotion Bott Of 60ml , Mometasone 0 Pont 1 Percnt Bott Of 10ml Lotion , Fusidic Acid Cream 2 Percnt Plus Ww Tube Of 10gm , Ketoconazole 2 Percnt Plus Coal Tar 4 Percnt Lotion Bott Of 100ml , Tretinoin 0 Point 05 Percnt Tube Of 20gm , Almond Oil Light Liquid Paraffin Green Tea Extract Under Eye Cream 15gm , Minoxidil 10 Percnt Solution Mintop , Minoxidil 5 Percnt Plus Finasteride Lipid Solution For Topical Application , Benzoyl Peroxide 2 Point 5 Percnt Tube Of 20gms , Clindamycin 1 Percnt Plus Adapalene 0 Point 1 Percnt Tube Of 15gm , Collagen Plus Mupirocin Plus Metronidazole 10 Into 5 Ml , Ascorbic Acid Serum Vit C , Cyclopentolate Hcl 1 Percnt Opth Soln Bottle Of 5m , Ketotifen Fumarate 0 Percnt 005 Percnt Eye Drop Bid Number/ & ( * ) : Gem/2025/b/6097903 Dated/ + : 29-03-2025 Bid Document/ 3 3 1 / 16
Read MorePublish Date | 29 Mar 2025 | |
Bid Submission End Date | 19 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | 91.75 K |
Publish Date | 29 Mar 2025 | |
Bid Submission End Date | 19 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | 91.75 K |
REPAIR AND MAINTENANCE OF FIBER OPTIC BACKBONE;7650; Supply of 48 core 9 125 250 Singlemode dry core Multi tube ECSS Armor Bend insensitive Outside Plant Fiber Cable HDPE Sheath Supply of 48 core 9 125 250 Singlemode dry core Multi tube ECSS Armor Bend insensitive Outside Plant Fiber Cable HDPE Sheath same as serial No 1 Supply of Outdoor Fiber Optic Joint Closure dome and base type with mechanical seals IP68 rated outdoor suitable for upto 48F splice Supply and installation of 4 inch diameter and 6 meter length GI Pipe ISI Marked to be fixed on the pillars of boundary walls using GI Clamps Laying and pulling of Fiber Cables 48 core OFC Steel Messenger Wire of 6 sqmm and PVC Spiral Support for the OFC Cable between GI Pipes
Read MorePublish Date | 02 Apr 2025 | |
Bid Submission End Date | 23 Apr 2025 | |
Earnest Amount | 1 L | |
Tender Amount | Refer Doc |
Publish Date | 02 Apr 2025 | |
Bid Submission End Date | 23 Apr 2025 | |
Earnest Amount | 1 L | |
Tender Amount | Refer Doc |