Bharat Heavy Electricals Limited bhel
Sikkim | South District |
- Download
Tender Roadmap
Publish Date
03 Sept 2024
Tender is published for seller Participation.
Bid Submission End Date
18 Sept 2024
Last day to participate Tender on GeM platform.
Evaluation Date
18 Sept 2024
Technical committe will evaluate Bid and Open Results.
Earnest Amount | |||||||||||||||||||||||||||||
XXXXXXX | |||||||||||||||||||||||||||||
Tender Amount | |||||||||||||||||||||||||||||
XXXXXXX | |||||||||||||||||||||||||||||
Department | |||||||||||||||||||||||||||||
Department Of Heavy Industry | |||||||||||||||||||||||||||||
Item Category | |||||||||||||||||||||||||||||
MAIN SUPPLY SINGLE GIRDER EOT CRANE 5T EXCLUDING LT RAIL ALONG WITH ALL ACCESSORIES AS PER TECHNICAL SPECIFICATION MAIN SUPPLY LT RAIL WITH ALL THE FITTING ARRANGEMENTS MAIN SUPPLY TOOLS AND TACKLES AS PER CLAUSE 7 OF SECTION 1 OF TECHNICAL SPECIFICATION SPARES SUPPLY ELECTRIC MOTOR FOR LT UNIT 1 NUMBER OF EACH TYPE SPARES SUPPLY SET OF BRAKE LINING PAD MOTOR SPRINGS SEAL KIT SOLENOID COIL ETC COMPLETE WITH RIVETS ETC FOR EACH TYPE BRAKE SUPPLIED FOR LT UNIT SPARES SUPPLY LIMIT SWITCHES FOR LT UNIT 1 NUMBER OF EACH TYPE SPARES SUPPLY SET OF BRAKE LINING PAD MOTOR SPRINGS SEAL KIT SOLENOID COIL ETC COMPLETE WITH RIVETS ETC FOR EACH TYPE BRAKE SUPPLIED FOR CT UNIT SPARES SUPPLY ELECTRIC MOTOR FOR CT UNIT SPARES SUPPLY LIMIT SWITCHES FOR CT UNIT 1 NUMBER OF EACH TYPE SPARES SUPPLY WIRE ROPE 1 FULL LENGTH SPARES SUPPLY SET OF BRAKE LINING PAD MOTOR SPRINGS SEAL KIT SOLENOID COIL ETC COMPLETE WITH RIVETS ETC FOR EACH TYPE BRAKE SUPPLIED FOR MAIN HOIST SPARES SUPPLY ELECTRIC MOTOR FOR MAIN HOIST 1 NUMBER OF EACH TYPE SPARES SUPPLY LIMIT SWITCHES FOR MAIN HOIST 1 NUMBER OF EACH TYPE SPARES SUPPLY CIRCUIT BREAKER OF EACH TYPE SPARES SUPPLY FUSES INCLUDING FAST ACTING FUSES USED IN THYRISTOR CIRCUITS 2 NUMBERS OF EACH TYPE SPARES SUPPLY INDICATING LAMPS LED 2 NUMBERS OF EACH COLOUR RED BLUE GREEN AMBER WHITE ETC SPARES SUPPLY OVERLOAD RELAYS AND TIME DELAY RELAY 2 NUMBERS OF EACH TYPE SPARES SUPPLY BEARINGS FOR WHEELS GEAR BOXES HOOKS HOIST DRUM AND MOTORS FOR COMPLETE CRANE SPARES SUPPLY PUSH BUTTON OF EACH TYPE 2 NUMBERS OF EACH COLOUR RED BLUE GREEN AMBER WHITE ETC SPARES SUPPLY MODULE RECTIFIER MOSFET THYRISTOR 1 NUMBER FOR EACH MH CT AND LT SPARES SUPPLY VVVF DRIVE 1 NUMBER FOR EACH MH CT AND LT ERECTION TESTING AND COMMISSIONING AT SITE FOR SINGLE GIRDER EOT CRANE 5T EXCLUDING LT RAIL ERECTION TESTING AND COMMISSIONING AT SITE FOR LT RAIL | |||||||||||||||||||||||||||||
Purchaser Address | |||||||||||||||||||||||||||||
737126,Senior Manager Electrical , Teesta VI HE Project LANCO TEESTA Hydro Power Limited Pamhok | |||||||||||||||||||||||||||||
Work Description | |||||||||||||||||||||||||||||
Supply and ETC of EOT Crane for 220kV GIS Building 5T;511; MAIN SUPPLY SINGLE GIRDER EOT CRANE 5T EXCLUDING LT RAIL ALONG WITH ALL ACCESSORIES AS PER TECHNICAL SPECIFICATION MAIN SUPPLY LT RAIL WITH ALL THE FITTING ARRANGEMENTS MAIN SUPPLY TOOLS AND TACKLES AS PER CLAUSE 7 OF SECTION 1 OF TECHNICAL SPECIFICATION SPARES SUPPLY ELECTRIC MOTOR FOR LT UNIT 1 NUMBER OF EACH TYPE SPARES SUPPLY SET OF BRAKE LINING PAD MOTOR SPRINGS SEAL KIT SOLENOID COIL ETC COMPLETE WITH RIVETS ETC FOR EACH TYPE BRAKE SUPPLIED FOR LT UNIT SPARES SUPPLY LIMIT SWITCHES FOR LT UNIT 1 NUMBER OF EACH TYPE SPARES SUPPLY SET OF BRAKE LINING PAD MOTOR SPRINGS SEAL KIT SOLENOID COIL ETC COMPLETE WITH RIVETS ETC FOR EACH TYPE BRAKE SUPPLIED FOR CT UNIT SPARES SUPPLY ELECTRIC MOTOR FOR CT UNIT SPARES SUPPLY LIMIT SWITCHES FOR CT UNIT 1 NUMBER OF EACH TYPE SPARES SUPPLY WIRE ROPE 1 FULL LENGTH SPARES SUPPLY SET OF BRAKE LINING PAD MOTOR SPRINGS SEAL KIT SOLENOID COIL ETC COMPLETE WITH RIVETS ETC FOR EACH TYPE BRAKE SUPPLIED FOR MAIN HOIST SPARES SUPPLY ELECTRIC MOTOR FOR MAIN HOIST 1 NUMBER OF EACH TYPE SPARES SUPPLY LIMIT SWITCHES FOR MAIN HOIST 1 NUMBER OF EACH TYPE SPARES SUPPLY CIRCUIT BREAKER OF EACH TYPE SPARES SUPPLY FUSES INCLUDING FAST ACTING FUSES USED IN THYRISTOR CIRCUITS 2 NUMBERS OF EACH TYPE SPARES SUPPLY INDICATING LAMPS LED 2 NUMBERS OF EACH COLOUR RED BLUE GREEN AMBER WHITE ETC SPARES SUPPLY OVERLOAD RELAYS AND TIME DELAY RELAY 2 NUMBERS OF EACH TYPE SPARES SUPPLY BEARINGS FOR WHEELS GEAR BOXES HOOKS HOIST DRUM AND MOTORS FOR COMPLETE CRANE SPARES SUPPLY PUSH BUTTON OF EACH TYPE 2 NUMBERS OF EACH COLOUR RED BLUE GREEN AMBER WHITE ETC SPARES SUPPLY MODULE RECTIFIER MOSFET THYRISTOR 1 NUMBER FOR EACH MH CT AND LT SPARES SUPPLY VVVF DRIVE 1 NUMBER FOR EACH MH CT AND LT ERECTION TESTING AND COMMISSIONING AT SITE FOR SINGLE GIRDER EOT CRANE 5T EXCLUDING LT RAIL ERECTION TESTING AND COMMISSIONING AT SITE FOR LT RAIL
|
|||||||||||||||||||||||||||||
Eligibility | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
My Evaluation Notes | |||||||||||||||||||||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.
CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.