Semiconductor Laboratory
Punjab | S.a.s Nagar |
- Download
Time left to bid
12
Days16
Hours28
MinutesTender Roadmap
Publish Date
11 Oct 2024
Tender is published for seller Participation.
Bid Submission End Date
01 Nov 2024
Last day to participate Tender on GeM platform.
Evaluation Date
01 Nov 2024
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
XXXXXXX | ||||||||||
Tender Amount | ||||||||||
XXXXXXX | ||||||||||
Department | ||||||||||
Department Of Electronics And Information Technology | ||||||||||
Item Category | ||||||||||
Supply of Package unit capacity 17.5 TR ITC of Package unit capacity 17 .5 TR Supply of Wall Mounted fixed speed Split AC SITC of Wall Mounted fixed speed Split AC Supply of Hard drawn Copper Refrigerant ITC of Hard drawn Copper Refrigerant Supply of GI sheet metal rectangular ducting ITC of GI sheet metal rectangular ducting Supply of Air grills in Aluminium construction ITC of Air grills in Aluminium construction Supply of Volume Control dampers ITC of Volume Control dampers Supply of GI Cable tray of size 300 mm ITC of GI Cable tray of size 300 mm Supply of Canvas Connection for Indoor unit ITC of Canvas Connection Supply of MS Structure of min 2 inch ITC of MS Structure Dismantling of Existing 16.5 TR Dismantling of Existing 1.5 TR unit GeMARPTS / Searched Strings used in GeMARPTS Supply of Package unit 17 TR capacity Installation of Package unit 17 TR capacity Ductable Air Conditioner Installation of Ductable Air Conditioner Split Air Conditioner Including Green AC Wall Mount Type V2 Installation Split Air Conditioner Including Green AC Wall Mount Type V2 Supply of hard drawn copper refrigerant supply piping Installation of hard drawn copper refrigerant supply piping | ||||||||||
Purchaser Address | ||||||||||
160071,SECTOR 72, S A S NAGAR, MOHALI, PUNJAB | ||||||||||
Work Description | ||||||||||
Revamping of Air Conditioning System of DRUPS;969; Supply of Package unit capacity 17.5 TR ITC of Package unit capacity 17 .5 TR Supply of Wall Mounted fixed speed Split AC SITC of Wall Mounted fixed speed Split AC Supply of Hard drawn Copper Refrigerant ITC of Hard drawn Copper Refrigerant Supply of GI sheet metal rectangular ducting ITC of GI sheet metal rectangular ducting Supply of Air grills in Aluminium construction ITC of Air grills in Aluminium construction Supply of Volume Control dampers ITC of Volume Control dampers Supply of GI Cable tray of size 300 mm ITC of GI Cable tray of size 300 mm Supply of Canvas Connection for Indoor unit ITC of Canvas Connection Supply of MS Structure of min 2 inch ITC of MS Structure Dismantling of Existing 16.5 TR Dismantling of Existing 1.5 TR unit GeMARPTS / Searched Strings used in GeMARPTS Supply of Package unit 17 TR capacity Installation of Package unit 17 TR capacity Ductable Air Conditioner Installation of Ductable Air Conditioner Split Air Conditioner Including Green AC Wall Mount Type V2 Installation Split Air Conditioner Including Green AC Wall Mount Type V2 Supply of hard drawn copper refrigerant supply piping Installation of hard drawn copper refrigerant supply piping
|
||||||||||
My Evaluation Notes | ||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.
CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.