Goa Shipyard Limited
Goa | South Goa |
- Download
Time left to bid
1
Days21
Hours33
MinutesTender Roadmap
Publish Date
22 Jan 2025
Tender is published for seller Participation.
Bid Submission End Date
18 Mar 2025
Last day to participate Tender on GeM platform.
Evaluation Date
18 Mar 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | |||||||||||||||||||||||||||||
1.25 L | |||||||||||||||||||||||||||||
Tender Amount | |||||||||||||||||||||||||||||
Refer Doc | |||||||||||||||||||||||||||||
Department | |||||||||||||||||||||||||||||
Department Of Defence Production | |||||||||||||||||||||||||||||
Item Category | |||||||||||||||||||||||||||||
CASULTY POWER DISTRIBUTION SYSTEM OBS INSTALLATION AND COMMISSIONING SPARES TECHNICAL DOCUMENTATION SERVICE ENGINEER CHARGES TRAINING GeMARPTS / Searched Strings used in GeMARPTS Casuality Power Distribution System GeMARPTS / Searched Result generated in GeMARPTS Power Distribution Box Solar Power Plant Roof Top for ONGRID System Three Phase V2 Solar Power Plant Roof Top for ONGRID System Single Phase Online UPS V2 Wild Animal Repellent System V2 Distribution Transformer 3 Phase 33 KV 200 KVA Up to and including 2500 KVA Integrated Powered Drill and Debrider system IGBT Based Heavy Duty Power Source Air Plasma Cutting System with compressor Metal Oxide Surge Arresters Without Gaps For A.C. Systems V2 Conforming to IS 15086 Part 4 Fluid Power Systems O-Rings Conforming to IS 17891 / Relevant Categories selected for notification Power Distribution Box Distribution Transformer 3 Phase Up to and including 200 KVA Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 15 Lakh s | |||||||||||||||||||||||||||||
Purchaser Address | |||||||||||||||||||||||||||||
SOUTH GOA | |||||||||||||||||||||||||||||
Work Description | |||||||||||||||||||||||||||||
42; CASULTY POWER DISTRIBUTION SYSTEM OBS INSTALLATION AND COMMISSIONING SPARES TECHNICAL DOCUMENTATION SERVICE ENGINEER CHARGES TRAINING GeMARPTS / Searched Strings used in GeMARPTS Casuality Power Distribution System GeMARPTS / Searched Result generated in GeMARPTS Power Distribution Box Solar Power Plant Roof Top for ONGRID System Three Phase V2 Solar Power Plant Roof Top for ONGRID System Single Phase Online UPS V2 Wild Animal Repellent System V2 Distribution Transformer 3 Phase 33 KV 200 KVA Up to and including 2500 KVA Integrated Powered Drill and Debrider system IGBT Based Heavy Duty Power Source Air Plasma Cutting System with compressor Metal Oxide Surge Arresters Without Gaps For A.C. Systems V2 Conforming to IS 15086 Part 4 Fluid Power Systems O-Rings Conforming to IS 17891 / Relevant Categories selected for notification Power Distribution Box Distribution Transformer 3 Phase Up to and including 200 KVA Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 15 Lakh s
|
|||||||||||||||||||||||||||||
Corrigendum | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
Eligibility | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
My Evaluation Notes | |||||||||||||||||||||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.

CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.