Dedicated Freight Corridor Corporation Of India Limited
Uttar Pradesh | Meerut |
- Download
Time left to bid
9
Days21
Hours37
MinutesTender Roadmap
Publish Date
05 Feb 2025
Tender is published for seller Participation.
Bid Submission End Date
05 Mar 2025
Last day to participate Tender on GeM platform.
Evaluation Date
05 Mar 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | |||||||||||||||||||||||||||||
92.5 K | |||||||||||||||||||||||||||||
Tender Amount | |||||||||||||||||||||||||||||
0.46 Cr | |||||||||||||||||||||||||||||
Department | |||||||||||||||||||||||||||||
Railways Public Sector Undertakings | |||||||||||||||||||||||||||||
Item Category | |||||||||||||||||||||||||||||
2 Aspect signal plastic cover 3 Aspect signal plastic cover 4 Aspect signal plastic cover Signal route arm plastic cover Shunt Signal plastic cover Calling On Signal Plastic Cover Signalling Jointing Kit 6C cable Signalling Jointing Kit 12C cable Signalling Jointing Kit 306C cable VRLA batteries supply of Electrically operated Lifting barrier ELB boom 9 M length Patch cords SPT telephone WLL 4G SIM phone OFC joint Enclosure Thermo Shrink Jointing Kit for Jointing Underground Quad Cable 0.9 mm Conductor Dia Mild Steel Racks Rain Coat SAFETY JACKET SAFETY helmet LED HAND LAMP Torch Blower UMBRELLA SAFETY GLOVES Maintenance-free earthing and bonding system Copper tape 3x25mm for bonding ring conductor as per IS 191 GI Tape of 6x50mm as per IS 2629 Installation laying and Commssioning GeMARPTS / Searched Strings used in GeMARPTS VRLA Electrical lifting barrier | |||||||||||||||||||||||||||||
Purchaser Address | |||||||||||||||||||||||||||||
250002,Balaji Complex, NH 58 | |||||||||||||||||||||||||||||
Work Description | |||||||||||||||||||||||||||||
supply of Signal and telecom and safety material for DFCCIL;2805; 2 Aspect signal plastic cover 3 Aspect signal plastic cover 4 Aspect signal plastic cover Signal route arm plastic cover Shunt Signal plastic cover Calling On Signal Plastic Cover Signalling Jointing Kit 6C cable Signalling Jointing Kit 12C cable Signalling Jointing Kit 306C cable VRLA batteries supply of Electrically operated Lifting barrier ELB boom 9 M length Patch cords SPT telephone WLL 4G SIM phone OFC joint Enclosure Thermo Shrink Jointing Kit for Jointing Underground Quad Cable 0.9 mm Conductor Dia Mild Steel Racks Rain Coat SAFETY JACKET SAFETY helmet LED HAND LAMP Torch Blower UMBRELLA SAFETY GLOVES Maintenance-free earthing and bonding system Copper tape 3x25mm for bonding ring conductor as per IS 191 GI Tape of 6x50mm as per IS 2629 Installation laying and Commssioning GeMARPTS / Searched Strings used in GeMARPTS VRLA Electrical lifting barrier
|
|||||||||||||||||||||||||||||
Eligibility | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
My Evaluation Notes | |||||||||||||||||||||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.

CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.