South Eastern Railway
West Bengal | Adra |
- Download
Time left to bid
2
Days17
Hours40
MinutesTender Roadmap
Publish Date
28 Jan 2025
Tender is published for seller Participation.
Bid Submission End Date
27 Feb 2025
Last day to participate Tender on GeM platform.
Evaluation Date
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
Refer Doc | ||||||||||
Tender Amount | ||||||||||
0 K | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
Purchaser Address | ||||||||||
Work Description | ||||||||||
"supply, Testing Of Adp Octagonal Pole With Double Arm Brakets Of Height 6 Meters Provision For Lighting Purpose, Each Bracket Length (in Mm) 1000, Material Of Octagonal Pole Grade 355 As Per Is:598 6:2011 Latest, Cross Section Of Octagonal Pole (no Of Sides): 8 Sided Polygon, Internal Distance Between Par Allel Faces At The Base Of Pole: 130, Enternal Distance Between Parallel Faces At The Top Of Pole : 70, Seamle Ss Single Longitutinal Saw Weld (no Circumference Weld Allowed), Door Opening: 500 Mm Height From Base Plate, Size: 100 Mm X 500 Mm With Gasket, Base Plate Size-( Length In Mm X Width In Mm X Thickness In Mm) 200x200x12, Suitable Foundation Bolts, Nuts And Washers And Instruction Manual. All Material Should Be Of Is Tolerance With All Necessary Accessories To Complete The Work In All Respect. Cost Includes Cost Of P Ower Supply Arrangement Including Wiring And Necessary Reliable Protective Device( If Required)as Per Site R Equirment As Advised By Railway Site Incharge" [ Warranty Period: 12 Months After The Date Of Delivery ]
|
||||||||||
My Evaluation Notes | ||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.

CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.