Indian Navy
Andhra Pradesh | Visakhapatnam |
- Download
Time left to bid
14
Days23
Hours13
MinutesTender Roadmap
Publish Date
18 Feb 2025
Tender is published for seller Participation.
Bid Submission End Date
11 Mar 2025
Last day to participate Tender on GeM platform.
Evaluation Date
11 Mar 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | |||||||||||||||||||||||||||||
Refer Doc | |||||||||||||||||||||||||||||
Tender Amount | |||||||||||||||||||||||||||||
Refer Doc | |||||||||||||||||||||||||||||
Department | |||||||||||||||||||||||||||||
Department Of Military Affairs | |||||||||||||||||||||||||||||
Item Category | |||||||||||||||||||||||||||||
CPU Monitor UPS Wireless Key Board and Mouse DVD Drive Optical Fiber Cable 24 Port L2 manageable switch with fiber port SFP Module SC-LC patch cord length 24 Port fully loaded CAT 6 patch Panel 1.5 mtr CAT 6 patch cable 3m CAT 6 Patch Cable CAT 6 LAN Cable CAT 6 IO Box 6U Rack Conduit Digging and FillingPVC pipeline works Telephone Instrument Junction box 50 pairs with chrone connectors Telephone cable 02 Pair PVC for internal wiring 02 Pair Junction Boxes Jelly Filled cable 20 Pairs Jelly Filled cable 10 Pairs Conduit Material Plastic outer side of the wall Installation Digging Work Cabling etc PA Dual Projection Speaker Cable 3 Core for underground wring for integration with existing PA system Speaker Cable Shielded for internal wiring Conduiting for internal wiring Conduiting for installation STW GeMARPTS / Searched Strings used in GeMARPTS PA System LAN with workstations Telephone Exchange System with Instruments | |||||||||||||||||||||||||||||
Purchaser Address | |||||||||||||||||||||||||||||
Visakhapatnam | |||||||||||||||||||||||||||||
Work Description | |||||||||||||||||||||||||||||
4597; CPU Monitor UPS Wireless Key Board and Mouse DVD Drive Optical Fiber Cable 24 Port L2 manageable switch with fiber port SFP Module SC-LC patch cord length 24 Port fully loaded CAT 6 patch Panel 1.5 mtr CAT 6 patch cable 3m CAT 6 Patch Cable CAT 6 LAN Cable CAT 6 IO Box 6U Rack Conduit Digging and FillingPVC pipeline works Telephone Instrument Junction box 50 pairs with chrone connectors Telephone cable 02 Pair PVC for internal wiring 02 Pair Junction Boxes Jelly Filled cable 20 Pairs Jelly Filled cable 10 Pairs Conduit Material Plastic outer side of the wall Installation Digging Work Cabling etc PA Dual Projection Speaker Cable 3 Core for underground wring for integration with existing PA system Speaker Cable Shielded for internal wiring Conduiting for internal wiring Conduiting for installation STW GeMARPTS / Searched Strings used in GeMARPTS PA System LAN with workstations Telephone Exchange System with Instruments
|
|||||||||||||||||||||||||||||
Eligibility | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
My Evaluation Notes | |||||||||||||||||||||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.

CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.