Mizoram University
Mizoram | Aizawl |
- Download

Tender Roadmap
Publish Date
20 Feb 2025
Tender is published for seller Participation.
Bid Submission End Date
01 Apr 2025
Last day to participate Tender on GeM platform.
Evaluation Date
01 Apr 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | |||||||||||||||||||||||||||||
Refer Doc | |||||||||||||||||||||||||||||
Tender Amount | |||||||||||||||||||||||||||||
Refer Doc | |||||||||||||||||||||||||||||
Department | |||||||||||||||||||||||||||||
Department Of Higher Education | |||||||||||||||||||||||||||||
Item Category | |||||||||||||||||||||||||||||
To determine the magnetization characteristics and the speed Vs voltage curve of a separately excited DC Generator To determine the load characteristics of separately excited and shunt DC generators To determine the load characteristics compound generators To determine the mechanical characteristic of series Motor To determine the performance and Mechanical characteristics of DC shunt Motor Study of Speed control of D C shunt motor Shunt field control Armature resistance control Study of Speed Torque characteristics of compound DC motor Estimation of efficiency of DC machine by Swinburns test Estimation of efficiency of DC machine by Hopkinsons test Open circuit and short circuit tests on a single transformer Sumpners test on two identical transformers Three phase to Two phase conversion Scott Connection 250 W MPPT Boost converter for solar PV 250W Single phase grid synchronised inverer for solar PV Grid synchronized inverter for integrating Three Energy sources DFIG based wind energy conversion system Three phased advanced power system experimentation setup GeMARPTS / Searched Strings used in GeMARPTS Electrical machines lab | |||||||||||||||||||||||||||||
Purchaser Address | |||||||||||||||||||||||||||||
796004,Mizoram University, Tanhril, Aizawl, Mizoram | |||||||||||||||||||||||||||||
Work Description | |||||||||||||||||||||||||||||
Equipment for Electrical engineering lab;17; To determine the magnetization characteristics and the speed Vs voltage curve of a separately excited DC Generator To determine the load characteristics of separately excited and shunt DC generators To determine the load characteristics compound generators To determine the mechanical characteristic of series Motor To determine the performance and Mechanical characteristics of DC shunt Motor Study of Speed control of D C shunt motor Shunt field control Armature resistance control Study of Speed Torque characteristics of compound DC motor Estimation of efficiency of DC machine by Swinburns test Estimation of efficiency of DC machine by Hopkinsons test Open circuit and short circuit tests on a single transformer Sumpners test on two identical transformers Three phase to Two phase conversion Scott Connection 250 W MPPT Boost converter for solar PV 250W Single phase grid synchronised inverer for solar PV Grid synchronized inverter for integrating Three Energy sources DFIG based wind energy conversion system Three phased advanced power system experimentation setup GeMARPTS / Searched Strings used in GeMARPTS Electrical machines lab
|
|||||||||||||||||||||||||||||
Eligibility | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
My Evaluation Notes | |||||||||||||||||||||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.

CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.