North East Frontier Railway
Assam | Hojai |
- Download
Time left to bid
18
Days15
Hours22
MinutesTender Roadmap
Publish Date
20 Feb 2025
Tender is published for seller Participation.
Bid Submission End Date
13 Mar 2025
Last day to participate Tender on GeM platform.
Evaluation Date
13 Mar 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | |||||||||||||||||||||||||||||
55 K | |||||||||||||||||||||||||||||
Tender Amount | |||||||||||||||||||||||||||||
Refer Doc | |||||||||||||||||||||||||||||
Department | |||||||||||||||||||||||||||||
Indian Railways | |||||||||||||||||||||||||||||
Item Category | |||||||||||||||||||||||||||||
PGINC SS202 Detailed Description as per item 1 of the attached specification Document Cable Single Core PVC Detailed Description as per item 2 of the attached Specification Document Cable Flame Proof PVC Insulated 3 Core 25MM Detailed description as per item 3 of the attached specification Document Self Primimg Mono Block Pump Detailed description as per item 4 of the attached specification Document Supply Installation and Commissioning of Water Load Box Detailed Description as per item 5 of the attached Specification Document GeMARPTS / Searched Strings used in GeMARPTS Supply Installation and Commissioning of Water Load Box GeMARPTS / Searched Result generated in GeMARPTS Rubber Seals Joint Rings for Water Supply Drainage and Sewerage Pipelines as per IS 5382 Fume Hood FSSAI / Relevant Categories selected for notification RLC Load Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 13 Lakh s Years of Past Experience Required for same/similar service/ 3 Year s | |||||||||||||||||||||||||||||
Purchaser Address | |||||||||||||||||||||||||||||
782447,Divisional Railway Manager office building ,Lumding Division, Dist Hojai, P O Lumding Pin code 782447 | |||||||||||||||||||||||||||||
Work Description | |||||||||||||||||||||||||||||
675; PGINC SS202 Detailed Description as per item 1 of the attached specification Document Cable Single Core PVC Detailed Description as per item 2 of the attached Specification Document Cable Flame Proof PVC Insulated 3 Core 25MM Detailed description as per item 3 of the attached specification Document Self Primimg Mono Block Pump Detailed description as per item 4 of the attached specification Document Supply Installation and Commissioning of Water Load Box Detailed Description as per item 5 of the attached Specification Document GeMARPTS / Searched Strings used in GeMARPTS Supply Installation and Commissioning of Water Load Box GeMARPTS / Searched Result generated in GeMARPTS Rubber Seals Joint Rings for Water Supply Drainage and Sewerage Pipelines as per IS 5382 Fume Hood FSSAI / Relevant Categories selected for notification RLC Load Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 13 Lakh s Years of Past Experience Required for same/similar service/ 3 Year s
|
|||||||||||||||||||||||||||||
Eligibility | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
My Evaluation Notes | |||||||||||||||||||||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.

CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.