Indian Coast Guard
Kerala | Ernakulam |
- Download
Time left to bid
12
Days8
Hours2
MinutesTender Roadmap
Publish Date
15 Feb 2025
Tender is published for seller Participation.
Bid Submission End Date
08 Mar 2025
Last day to participate Tender on GeM platform.
Evaluation Date
08 Mar 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | |||||||||||||||||||||||||||||
Refer Doc | |||||||||||||||||||||||||||||
Tender Amount | |||||||||||||||||||||||||||||
Refer Doc | |||||||||||||||||||||||||||||
Department | |||||||||||||||||||||||||||||
Department Of Defence | |||||||||||||||||||||||||||||
Item Category | |||||||||||||||||||||||||||||
WATER PURIFIER RO TYPE GeMARPTS / Searched Strings used in GeMARPTS WATER PURIFIER RO TYPE GeMARPTS / Searched Result generated in GeMARPTS Low Fouling Composite LFC RO Membrane RO Water Treatment System Above 50 LPH Filtration Capacity Reverse Osmosis based Point of Use Water Treatment System for Drinking Purposes V2 as per IS 16240 RO Water Plant for Hemodialysis Reverse Osmosis based Point of Use Water Treatment System for Drinking Purposes V3 as per IS 16240 Cap FS Disruptive JSS Ultra Filtration UF Membrane Drip - Leg Drain Water Flow Measurement in Open Channels - Rotating Element Current Meters as per IS 3910 Water Quality Meters / Analyzers / Relevant Categories selected for notification RO Alkaline Water Purifier Hot and Cold OEM Average Turnover Last 3 Years/ 3 3 3 Lakh s Years of Past Experience Required for same/similar service/ 2 Year s | |||||||||||||||||||||||||||||
Purchaser Address | |||||||||||||||||||||||||||||
Ernakulam | |||||||||||||||||||||||||||||
Work Description | |||||||||||||||||||||||||||||
1; WATER PURIFIER RO TYPE GeMARPTS / Searched Strings used in GeMARPTS WATER PURIFIER RO TYPE GeMARPTS / Searched Result generated in GeMARPTS Low Fouling Composite LFC RO Membrane RO Water Treatment System Above 50 LPH Filtration Capacity Reverse Osmosis based Point of Use Water Treatment System for Drinking Purposes V2 as per IS 16240 RO Water Plant for Hemodialysis Reverse Osmosis based Point of Use Water Treatment System for Drinking Purposes V3 as per IS 16240 Cap FS Disruptive JSS Ultra Filtration UF Membrane Drip - Leg Drain Water Flow Measurement in Open Channels - Rotating Element Current Meters as per IS 3910 Water Quality Meters / Analyzers / Relevant Categories selected for notification RO Alkaline Water Purifier Hot and Cold OEM Average Turnover Last 3 Years/ 3 3 3 Lakh s Years of Past Experience Required for same/similar service/ 2 Year s
|
|||||||||||||||||||||||||||||
Eligibility | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
My Evaluation Notes | |||||||||||||||||||||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.

CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.