Indian Army
Madhya Pradesh | Bhopal |
- Download
Time left to bid
4
Days0
Hours43
MinutesTender Roadmap
Publish Date
11 Mar 2025
Tender is published for seller Participation.
Bid Submission End Date
21 Mar 2025
Last day to participate Tender on GeM platform.
Evaluation Date
21 Mar 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | |||||||||||||||||||||||||||||
1.1 L | |||||||||||||||||||||||||||||
Tender Amount | |||||||||||||||||||||||||||||
Refer Doc | |||||||||||||||||||||||||||||
Department | |||||||||||||||||||||||||||||
Department Of Military Affairs | |||||||||||||||||||||||||||||
Item Category | |||||||||||||||||||||||||||||
taps or valves of nonferrous metals Q3 Copper Alloy Fancy Taps for Bathroom as per IS 8931 Latest Q3 Bathroom Water Shower Q3 Towel Rail / Ring for Bathroom Q3 Waste Fittings for Washbasin and Sinks as per IS 2963 Q3 Flushing Cistern Q3 Toilet Seat - Indian Style Squatting Pan Q3 Connection Pipe with Nuts V2 Q3 Commercial CPVC Pipe Fittings Q3 Chlorinated Polyvinyl Chloride CPVC Pipes for Potable Hot and Cold Water Distribution Supplies V2 as per IS 15778 Q3 Bathroom or Toilet Mirror V2 Q4 HYDRAULICALLY REGULATED DOOR CLOSERS Q3 Door Handles as per IS 208 Q4 Waste Pipe Q3 Floor Drain Traps Q3 Sinks / Wash Basins - Vitreous China as per IS 2556 Part 4 Q3 Toilet Seat Covers V2 Q4 Taflon Tape as per IS 14635 Q3 Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 18 Lakh s OEM Average Turnover Last 3 Years/ 3 3 18 Lakh s Years of Past Experience Required for same/similar service/ 45 45 3 Year s | |||||||||||||||||||||||||||||
Purchaser Address | |||||||||||||||||||||||||||||
Bhopal | |||||||||||||||||||||||||||||
Work Description | |||||||||||||||||||||||||||||
6435; taps or valves of nonferrous metals Q3 Copper Alloy Fancy Taps for Bathroom as per IS 8931 Latest Q3 Bathroom Water Shower Q3 Towel Rail / Ring for Bathroom Q3 Waste Fittings for Washbasin and Sinks as per IS 2963 Q3 Flushing Cistern Q3 Toilet Seat - Indian Style Squatting Pan Q3 Connection Pipe with Nuts V2 Q3 Commercial CPVC Pipe Fittings Q3 Chlorinated Polyvinyl Chloride CPVC Pipes for Potable Hot and Cold Water Distribution Supplies V2 as per IS 15778 Q3 Bathroom or Toilet Mirror V2 Q4 HYDRAULICALLY REGULATED DOOR CLOSERS Q3 Door Handles as per IS 208 Q4 Waste Pipe Q3 Floor Drain Traps Q3 Sinks / Wash Basins - Vitreous China as per IS 2556 Part 4 Q3 Toilet Seat Covers V2 Q4 Taflon Tape as per IS 14635 Q3 Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 18 Lakh s OEM Average Turnover Last 3 Years/ 3 3 18 Lakh s Years of Past Experience Required for same/similar service/ 45 45 3 Year s
|
|||||||||||||||||||||||||||||
Eligibility | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
My Evaluation Notes | |||||||||||||||||||||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.

CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.