Nuclear Power Corporation Of India Limited
Rajasthan | Chittorgarh |
- Download
Time left to bid
10
Days11
Hours52
MinutesTender Roadmap
Publish Date
07 Apr 2025
Tender is published for seller Participation.
Bid Submission End Date
29 Apr 2025
Last day to participate Tender on Gem and Non-Gem platform.
Evaluation Date
29 Apr 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | |||||||||||||||||||||||||||||
78.1 K | |||||||||||||||||||||||||||||
Tender Amount | |||||||||||||||||||||||||||||
Refer Doc | |||||||||||||||||||||||||||||
Department | |||||||||||||||||||||||||||||
Department Of Atomic Energy | |||||||||||||||||||||||||||||
Item Category | |||||||||||||||||||||||||||||
Helium Manifold for LZC System gas addition station complete set up with accessories Oxygen Manifold for LZC System gas addition station complete set up with accessories. Needle valve Size: 15 NB 1/2 inch NPTF Material: SS 316 L Pressure Rating: TPR 350 Kg/cm2. O ring for maintenance of needle valve Make: Baldota Valve Fitting Co. Pvt Ltd. Double Stage PRV -15 NB Piston Type required for Manifold for LZC System gas addition station. Repair kit for Double Stage PRV. Pigtail Length: 1.5 meter required for Manifold for LZC System gas addition station Adapter one side suitable to cylinder connection and other end 1 NPT F SS 316. Fitting 1/2 to 10 MM required for Manifold for LZC System gas addition station. RV and its repair kit for required for Manifold for LZC System gas addition station | |||||||||||||||||||||||||||||
Purchaser Address | |||||||||||||||||||||||||||||
323303,NPCIL, Rawatbhata Atomic Power Project 7 and 8, Contracts and Material Management Wing, Anushakti, Via Kota Rajasthan Which is about 60 Kms away from Kota | |||||||||||||||||||||||||||||
Work Description | |||||||||||||||||||||||||||||
599; Helium Manifold for LZC System gas addition station complete set up with accessories Oxygen Manifold for LZC System gas addition station complete set up with accessories. Needle valve Size: 15 NB 1/2 inch NPTF Material: SS 316 L Pressure Rating: TPR 350 Kg/cm2. O ring for maintenance of needle valve Make: Baldota Valve Fitting Co. Pvt Ltd. Double Stage PRV -15 NB Piston Type required for Manifold for LZC System gas addition station. Repair kit for Double Stage PRV. Pigtail Length: 1.5 meter required for Manifold for LZC System gas addition station Adapter one side suitable to cylinder connection and other end 1 NPT F SS 316. Fitting 1/2 to 10 MM required for Manifold for LZC System gas addition station. RV and its repair kit for required for Manifold for LZC System gas addition station
|
|||||||||||||||||||||||||||||
Eligibility | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
My Evaluation Notes | |||||||||||||||||||||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.

CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.