Uranium Corporation Of India Limited

Department Of Atomic Energy - ,
Tender amount Refer doc
Earnest amount Refer doc
Quantity 30
Bid number XXXXXXX
Type Non-GeM
BOQ title induction motor 0856
Publish Date
18 Jun 2025
Bid Submission End Date
09 Jul 2025
Evaluation Date
09 Jul 2025

Tender is published for seller participation.

Last day to participate tender on GeM platform.

Technical committee will evaluate bid and open results.

Description

induction motor 0856;30; Detail for TEFC 3- phase squirrel cage induction motor High efficiency IE3 flange mounted B5 construction continuously rated- S1 Duty KW- 0.55 HP- 0.75 RMP- 1410 Frame- 80 .- DO- KW- 1.1 HP- 1.5 RMP- 1420 Frame- 90S .- DO- KW- 1.5 HP- 2 RMP- 1435 Frame- 90L .- DO- KW- 2.2 HP- 3 RMP- 1440 Frame- 100L .- DO- KW- 3.7 HP- 5 RMP- 1440 Frame- 112M .- DO- KW- 7.5 HP- 10 RMP- 1455 Frame- 132M

Item Category

Detail for TEFC 3- phase squirrel cage induction motor High efficiency IE3 flange mounted B5 construction continuously rated- S1 Duty KW- 0.55 HP- 0.75 RMP- 1410 Frame- 80 .- DO- KW- 1.1 HP- 1.5 RMP- 1420 Frame- 90S .- DO- KW- 1.5 HP- 2 RMP- 1435 Frame- 90L .- DO- KW- 2.2 HP- 3 RMP- 1440 Frame- 100L .- DO- KW- 3.7 HP- 5 RMP- 1440 Frame- 112M .- DO- KW- 7.5 HP- 10 RMP- 1455 Frame- 132M

Purchaser address

Refer Doc

Website

https://bidplus.gem.gov.in

Eligibility
Minimum Average Annual Turnover of the bidder For 3 Years 1 Lakh s
OEM Average Turnover Last 3 years 4 Lakh s
Years of Past Experience Required for same similar service 1 Year s
Past Experience of Similar Services required N/A
MSE Exemption Yes Complete
Startup Exemption for Years Of Experience Yes Complete
Document Required from Reseller Experience Criteria Past Performance Bidder Turnover Certificate Requested in ATC OEM Annual Turnover In case any bidder is seeking exemption from Experience Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Bid to RA Enabled No
Evaluation Method Total value wise evaluation
Advisory Bank N/A
Splitting / bid splitting not applied
MSE Purchase Preference Yes
Reserved for MSE N/A
Reserved for MII N/A
MII Compliance/MII Purchase Preference No
Evaluation Notes