West Central Railway
Madhya Pradesh | Katni |
- Download

Tender Roadmap
Publish Date
24 Jun 2025
Tender is published for seller Participation.
Bid Submission End Date
16 Jul 2025
Last day to participate Tender on Gem and Non-Gem platform.
Evaluation Date
16 Jul 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
Refer Doc | ||||||||||
Tender Amount | ||||||||||
0 K | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
Purchaser Address | ||||||||||
Work Description | ||||||||||
Supply Of Operating Rod 25 Kv Drop Out Fuse (do Fuse) Switch As Per Rdso Spec. No. Eti/psi/14/(1/86 ) With A & C Slip No. 1 (4/87) Or Latest, Special Requirement In Pole Operating Rod 25 Kv (pole Made Of Cast Resin Or Resin-bonded Glass Fibre, Coated With Three Coats Of Poly-urethane, After The Award Of The Po, The Fir M Must Ensure Approval Of One Sample Of The Discharge Rod From The Consignee Before Rites Inspection. Th E Galvanised Steel Tube (threaded) Used For Coupling Of Pieces Of Discharge Rod Should Be At Least 20 Cm Or More As Required To Prevent Swaying Of Pole Assembly During Erection At Site. Also At Every 5 Cm Apart Two Nos Steel Rivet Is Required To Be Provided On Galvanised Steel Tube( For Preventing The Galvanised Steel Tube From Coming Out From Each Operating Rod Pole End). I.e. About 04 Nos Or More Steel Rivet As Required Per G Alvanised Steel Tube Is To Be Provided For Proper Fastening Of Galvanised Steel Tube Inside The Each Pole Of Operating Rod.[ Warranty Period: 30 Months After The Date Of Delivery ]
|
||||||||||
My Evaluation Notes | ||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.

CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.