Karnataka Power Corporation Limited
Karnataka | Raichur |
- Download
Time left to bid
9
Days17
Hours58
MinutesTender Roadmap
Publish Date
04 Jul 2025
Tender is published for seller Participation.
Bid Submission End Date
25 Jul 2025
Last day to participate Tender on Gem and Non-Gem platform.
Evaluation Date
26 Jul 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
73.15 K | ||||||||||
Tender Amount | ||||||||||
0.37 Cr | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
Software - Software Audit | ||||||||||
Purchaser Address | ||||||||||
Karnataka | ||||||||||
Work Description | ||||||||||
Supply Of Materials As Per The Technical Specifications Given In The Work Order.shifting Of Material To Work Place.inspection Of Material In Presence Of Indenter.power Off The Existing System, Isolation & Removing Of Existing Seal Steam Control Valve Hydraulic Actuator Assembly And Shifting To Designated Area (stores.replacing The New Electrical Actuator System In The Existing Location, Ensuring Of All Power, Signal Cables And Power On The System.calibration Of Electrical Actuators And Operation Shall Be Carried Out Locally And From Dcs (control Room) And Feedback Shall Be Ensured.it Is The Complete Responsibility Of The Firm To Execute The Job & To Bring Back The System In To Operation Without Time Delay.any Additional Spares, Tools Required For Carry Out The Above Work Shall Be Contractor/supplier Scope.power And Signal Cable Will Be Supplied By Kpcl And Cable Laying Is In Contractor Scope.the Necessary Tools, Tackles, Instruments Etc. Required For Commissioning, Testing/ Checking The Healthiness Of The System Has To Be Arranged By The Supplier.it Is The Complete Responsibility Of The Contractor To See That Total System Shall Be Commissioned Without Delay & Should Function Smoothly.any Additional Sparesitems/tools Required To Execute The Work Shall Be Suppliers Scope. Additional Mechanical Civil Works Shall Be Included In Contractor S Scope. Single Point Responsibility Of The Supplier To Execute The Job Without Latching Delay.during The Warranty/ Guaranty Period The Supplier Have To Replace Any No. Of Defective Spares With Good Ones (new Items) At Free Of Cost, Required For Smooth Functioning Of The System. Hence You Are Informed To Arrange For New Items Immediately Without Any Delay.the Bidder Shall Arrange To Submit 02 Sets Of Operation And Maintenance Manual Along With Approved Drawings.the Scope Is Of Retrofit/enhancement Feature For Existing System.
|
||||||||||
My Evaluation Notes | ||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.

CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.