Rail Coach Factory
Multi State | Multi city |
- Download
Time left to bid
2
Days14
Hours31
MinutesTender Roadmap
Publish Date
08 Jul 2025
Tender is published for seller Participation.
Bid Submission End Date
18 Jul 2025
Last day to participate Tender on Gem and Non-Gem platform.
Evaluation Date
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
Refer Doc | ||||||||||
Tender Amount | ||||||||||
0 K | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
Furniture Items - Door And Door Accessories | ||||||||||
Purchaser Address | ||||||||||
Work Description | ||||||||||
Supply Of Door Arrangement For Control Room Of Luggage Cum Brake Van With Unde Rslung Power Pack, As Per Drawing: Lr56101, Packing Instruction: Frp Ceiling Sheet/side Wall Panels/frp Component: Self Adhesive Biodegradable Plastic Lamination Sheet To Be Provided On Each Component. Projected Metallic Parts To Be Protected With Plastic/nyl On/frp Caps/proper Wrapping Of Biodegradable Bubble Sheet From All The Sides. Each Co Mponent To Be Packed In Biodegradable Bubble Sheet All Around With Proper Tapping & T Hen To Be Placed In Cardboard Box Followed By 3 Nylon Strips Tightened From Both Sid Es. Then Collective Packs Of Components To Be Packed In Wooden Cage Made From Wood En Strips Of Size 100x20mm & Gap Between Each Strip Should Not Be More Than 100mm.on The Wooden Crate Base 3 Wooden Pegs Of Size100x100mm(along The Length) To Be Provid Ed For Ease In Handling With Fork Lifter. Roof Ceiling (having Curved Surfaces) In Additi On To Above Packing Should Be Stacked On A Metallic Frames Before Packing In The Woo Den Boxes. One Package Should Not Contain Material Belonging To More Than One Coac H Set & Grouping Should Be Preferably Of Similar Sizes. Also Packing Should Have Indica Tion Like 1/4,2/4 Etc. ( E.g. Four Packings Will Make One Coach Set) So That One Complete Coach Set Can Be Easly Identified. The Maximum Weight Of The Wooden Crate Should Not Be More Than 200 Kgs. A List Should Be Pasted On Each Wooden Crate Showing Order No, Plno, Description Of Item,drg No/spec No/set List No. With Version,qty,firm's Name & Add Ress,date Of Despatch Etc. [ Warranty Period: 30 Months After The Date Of Delivery ]
|
||||||||||
My Evaluation Notes | ||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.

CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.