Rashtriya Ispat Nigam Limited
Andhra Pradesh | Visakhapatnam |
- Download
Time left to bid
3
Days4
Hours19
MinutesTender Roadmap
Publish Date
10 Jul 2025
Tender is published for seller Participation.
Bid Submission End Date
18 Jul 2025
Last day to participate Tender on Gem and Non-Gem platform.
Evaluation Date
19 Jul 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
Refer Doc | ||||||||||
Tender Amount | ||||||||||
0.15 Cr | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
Mechanical Engineering Services - Mechanical engineering Service | ||||||||||
Purchaser Address | ||||||||||
WCD RINL | ||||||||||
Work Description | ||||||||||
Capital Repair Repair And Overhauling Of Various Finishing Area Equipment In Mmsm-, Repair Works/replacement Of Protective Doors., Repair Work Of Chain Beam., Repair Works/replacement Of Cross Feed Conveyor Beam, Overhauling Jobs/re-visioning Foundation Repair Of Fixed Rollers., Turning Device Bracket Replacement., Dismantling Of Tanks,man Hole Covers, Pipe And Flanges Required Manual Cleaning Of All Sludge From The Tank, Filters Changing Gasket And Seals Changing For 5/2 Hydraulics, Piling Table Cylinders And Racks Re-visioning, Retractable Stopper Complete Re-visioning., Scale Pump House Suction Strainer Cleaning, Pipe Clamps Tightening Of All The Hydraulic Systems And Replacement Wherever Necessary Upto 22 Mm-1000nos,25 Mm To 50 Mm-1000 Nos, Above 50 Mm-500 Nos., Complete Hose Changing For The Mobile Saw Including Repair/replacement Of Power Chain, Replacement Of O Rings On Finishing Hydraulic Station Size 200-300., Clamping Unit Support Rail Alignment And Strengthening (all Mobile Saws), All Top Clamping Beam Brackets Revisioning And Pins Changing., Re-welding Of The Pipe Line Joints In Piling Area Approx.500 Nos.of Various Sizes., All Saws Lift/lower Cylinder., Re-visioning, Brackets Repair Replacement., Revisioning/replacement Of Traveling Wheels Of Mobile Saws., Removal Of All The Fixed Rollers Of Lhs.saw Area Foundation Repair, Tools Replacement, Rollers Replacement, Fixing And Alignment., Overhauling Of Feeder Mechanism., Vertical Conveyor Buffer Pads Changing In Piling/bundling Section, Vertical Conveyor Idle Sprocket Bearing Replacement., Repair Of Piling Collecting Grids., Revisioning/overhauling Of Brakes In Finishing Area., Clamping Of All The Coolers And Tank Cleaning Of Tying Machines & Hydraulic Systems, Foundation Rectification Of Ccd., Fixing Of Valves In Hydraulic Racks,, Revisioning Of Fixed Stopper., Overhauling Of Hydraulic Racks, Ccd-1 & 3 Shaft Changing., Piling Platform Rectification., Saw Area Traversible Stopper Overhauling., Fixi...
|
||||||||||
My Evaluation Notes | ||||||||||
|
Secure Your Funding Need with Us
Get instant access to business loans. We simplify finance and amplify success by providing the loans and fundings when you need them.

CHECK ELIGIBILITY
Assess your Loan Eligibility as per your financials.SUBMIT APPLICATION
Complete Online ProcessINSTANT APPROVAL
We will evaluate your application and share an Offer!We Invest in your Success, START BIDDING
AVAIL FUNDING NOW*Subject to your document's availability
-
Wishlist & Start
Your wishes are our command! Hit the "Wishlist" button on the tender of your choice, and our team will be in touch within 48 hours to ignite the process.
-
Quote at Warp
Don't wait, accelerate! Click "Quote Now" for an instantaneous tender quote, started within a mere 2 hours.
-
Documents Wizard
Receive a checklist and customizable document templates from our team, streamlining your preparation.
-
Relax & Delegate
Sit back & Relax! Once you've provided your documents and quote, our expert team will manage all subsequent tasks on your behalf. Await an Order Now.
-
Avail For Funding
Request for 70% funds of Estimated Bid Value.
-
Submit Documents
Upload you KYC/Financial documents.
-
Wait For Approval
Get approval within 7 days.
-
Get Funds Disbursements
Upload order, sign agreement and your supplier gets paid in 48 hours.