🔴  2 DEPARTMENT OF POWER DEVELOPMENT tenders closing in under 3 days —  Review & act now
DEPARTMENT OF POWER DEVELOPMENT Tenders — Updated April 2026

Latest DEPARTMENT OF POWER DEVELOPMENT Tenders — Live Updated Daily

GeMTech PARAS connects you with Power Development tenders that shape India’s energy infrastructure. Covering energy GeM listings and power sector procurement, our platform keeps you updated on e-tender India releases. These govt etender opportunities include everything from substation setup to rural electrification. With our support, vendors can monitor tenders, get notified of new bids, and access resources essential for success in power development projects across the country.

GeMTech PARAS aggregates live DEPARTMENT OF POWER DEVELOPMENT tenders in one searchable platform. Every active tender is indexed, filtered, and matched to your company profile automatically. Stop manually checking portals — let the data come to you.

500+ — DEPARTMENT OF POWER DEVELOPMENT Tenders Tracked
300+ Clients
4.9★ Google Rating
24hr Response
98% Compliance
300+
Clients Across India
4.9
Google Rating
24hr
Response Turnaround
98%
Compliance Rate

    DEPARTMENT OF POWER DEVELOPMENT
    Showing 1 to 25 of 153 for Department Of Power Development Tenders
    DEPARTMENT OF POWER DEVELOPMENT
    Creation Of 63 Kva Sub Station At Arampora Pattan Rakhi Mohalla Near High School Under Ut Capex Budget 2025-26
    End Date 11 Apr 2026 12:00 PM 4 days left
    Location Baramulla, Jammu And Kashmir
    Department Refer doc
    Amount ₹ 4.89 L
    Amount: ₹ 4.89 L
    DEPARTMENT OF POWER DEVELOPMENT
    Shifting Of 11 Kv Line At Chopan Mohalla Chinner
    End Date 10 Apr 2026 12:00 PM 3 days left
    Location Ganderbal, Jammu And Kashmir
    Department Refer doc
    Amount ₹ 13.21 L
    Amount: ₹ 13.21 L
    DEPARTMENT OF POWER DEVELOPMENT
    2 days left
    Annual Rate Contract For Hiring Of Commercial Vehicle (innova Crysta) To Be Used In The Office Of The Superintending Engineer Om Circle North For The Financial Year 2026-27
    End Date 09 Apr 2026 12:00 PM 2 days left
    Location Baramulla, Jammu And Kashmir
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    DEPARTMENT OF POWER DEVELOPMENT
    Construction Of 11kv Line From Receiving Station Pahalgam To Nunwan Pahalgam For Connecting Newly Installed 2 Mva 11/0.433 Kv Distribution Transformer At Nunwan Base Camp For Sanjy 2026
    End Date 15 Apr 2026 12:00 PM 8 days left
    Location Ananthnag, Jammu And Kashmir
    Department Refer doc
    Amount ₹ 20.16 L
    Amount: ₹ 20.16 L
    DEPARTMENT OF POWER DEVELOPMENT
    Corrigendum : Augmentation Of 132 By 33 Kv Gss Ljhp From 40 To 70 Mva Alongwith Providing Of New C And R Panels And Other Equipments At 132 By 33 Kv Grid Station Ljhp
    End Date 11 Apr 2026 12:00 PM 4 days left
    Location Baramulla, Jammu And Kashmir
    Department Refer doc
    Amount ₹ 11.31 Cr
    Amount: ₹ 11.31 Cr
    DEPARTMENT OF POWER DEVELOPMENT
    Creation Of 63 Kva Substation Along With Ht/lt Network Near Itbp Camp Lower Cave In Connection With Sanjy-2026
    End Date 17 Apr 2026 12:00 PM 10 days left
    Location Ananthnag, Jammu And Kashmir
    Department Refer doc
    Amount ₹ 10 L
    Amount: ₹ 10 L
    DEPARTMENT OF POWER DEVELOPMENT
    Creation Of 63 Kva Substation Along With Ht/lt Network Near Selfie Point Along Chandanwari Pissu Top Track In Connection With Sanjy-2026
    End Date 17 Apr 2026 12:00 PM 10 days left
    Location Ananthnag, Jammu And Kashmir
    Department Refer doc
    Amount ₹ 18.85 L
    Amount: ₹ 18.85 L
    DEPARTMENT OF POWER DEVELOPMENT
    Creation Of 63 Kva Substation Along With Ht/lt Network For Kali-mata Track In Connection With Sanjy-2026
    End Date 17 Apr 2026 12:00 PM 10 days left
    Location Ananthnag, Jammu And Kashmir
    Department Refer doc
    Amount ₹ 14.84 L
    Amount: ₹ 14.84 L
    DEPARTMENT OF POWER DEVELOPMENT
    Shifting Of 33 Kv Pahalgam Line Along The Road From 4-pole Frame Near Gurduwara Hutmurrah To Receiving Station Hutmurah By Way Of Construction Of New 33 Kv Line On 13 Mtr. Long St Poles
    End Date 20 Apr 2026 12:00 PM 13 days left
    Location Ananthnag, Jammu And Kashmir
    Department Refer doc
    Amount ₹ 56.28 L
    Amount: ₹ 56.28 L
    DEPARTMENT OF POWER DEVELOPMENT
    Supply Of Green Canvas Water/snow Proof Army Camping Tents Of (size 14 Ftx12 Ft.) In Connection With Shri Amarnath Ji Yatra-2026
    End Date 21 Apr 2026 12:00 PM 14 days left
    Location Ananthnag, Jammu And Kashmir
    Department Refer doc
    Amount ₹ 2.64 L
    Amount: ₹ 2.64 L
    DEPARTMENT OF POWER DEVELOPMENT
    Shifting Of 33 Kv Pahalgam Line Along The Road From Receiving Station Batkoot To Lamkhorou By Way Of Construction Of New 33 Kv Line On 11 Mtr. Long St Poles
    End Date 20 Apr 2026 12:00 PM 13 days left
    Location Pahalgam, Jammu And Kashmir
    Department Refer doc
    Amount ₹ 51.89 L
    Amount: ₹ 51.89 L
    DEPARTMENT OF POWER DEVELOPMENT
    Rate Contract For Replacement Of Damaged Distribution Transformers From 25kva To 630kva At Various Sub Divisional Locations Under The Jurisdiction Of Electric Division-ii Jpdcl Gandhi Nagar Jammu By Means Of Mechanical Mobile Cranes Ed-2
    End Date 21 Apr 2026 12:00 PM 14 days left
    Location Jammu, Jammu And Kashmir
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    DEPARTMENT OF POWER DEVELOPMENT
    Providing Of Ponnies To The Inspecting Officers Officials And Supervisory Staff To Facilitate Shri Amar Nath Ji Yatra For The Entire Yatra Period
    End Date 21 Apr 2026 12:00 PM 14 days left
    Location Ganderbal, Jammu And Kashmir
    Department Refer doc
    Amount ₹ 1 L
    Amount: ₹ 1 L
    DEPARTMENT OF POWER DEVELOPMENT
    Fixing The Job Contract (labour) For Repair/reclamation Of Damaged Distribution Transformers (11kv/6.6kv/0.44kv) Of Different Capacities Viz 25 Kva, 50/63 Kva, 100 Kva, 200/250 Kva, 300 Kva, 400 Kva, 500 Kva, 630 Kva At Divisional Workshop Miransahib - Fixing The Job Contract (labour) For Repair/reclamation Of Damaged Distribution Transformers (11kv/6.6kv/0.44kv) Of Different Capacities Viz 25 Kva, 50/63 Kva, 100 Kva, 200/250 Kva, 300 Kva, 400 Kva, 500 Kva, 630 Kva At Divisional Workshop Miran Sahib For Fy 2026-27.
    End Date 18 Apr 2026 12:00 PM 11 days left
    Location Jammu, Jammu And Kashmir
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    DEPARTMENT OF POWER DEVELOPMENT
    Rate Contract For Supply Of Spares/minor Stores Items/equipments/hardware Items And Tandp/equipments Required From Time To Time For Day-to-day Operation/ Maintenance Of Power Network Of This Division During The Financial Year 2026-27 - Rate Contract For Supply Of Spares/minor Stores Items/equipments/hardware Items & T&p/equipments Required From Time To Time For Day-to-day Operation/ Maintenance Of Distribution Power Network Of This Division During The Financial Year 2026-27.
    End Date 18 Apr 2026 12:00 PM 11 days left
    Location Jammu, Jammu And Kashmir
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    DEPARTMENT OF POWER DEVELOPMENT
    Rate Contract For Supply Of Cable Of Sorts Along With Other Allied Material Required From Time To Time For Day-to-day Operation/ Maintenance Of Distribution Power Network Of This Division During The Financial Year 2026-27. - Fixing Of Rate Contract For Supply Of Cable Of Sorts Along With Other Allied Material From Original Equipment Manufacturers/authorized Dealers/local Ssi Units/registered Firms Already In The Trade Required From Time To Time For Day-to-day Operation/ Maintenance Of Distribution Power Network Of This Division During The Financial Year 2026-27.
    End Date 18 Apr 2026 12:00 PM 11 days left
    Location Jammu, Jammu And Kashmir
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    DEPARTMENT OF POWER DEVELOPMENT
    Supply And Installation Of Three-phase Ct/pt Operated Smart Abt Feeder Meters - Supply And Installation Of Three-phase Ct/pt Operated Smart Abt Feeder Meters (0.2s Class) With Nic-enabled Communication, Control Cabling, Digital Input Facilities,cloud Storage, Backend It Hardware Support And All Associated Installation Works Including All In One Pc For Energy Monitoring,reporting And Data Analysis At Grid Level At All 220/132/33kv Grid Stations Of Jkptcl-kashmir
    End Date 24 Apr 2026 12:00 PM 17 days left
    Location Srinagar, Jammu And Kashmir
    Department Refer doc
    Amount ₹ 4.16 Cr
    Amount: ₹ 4.16 Cr
    DEPARTMENT OF POWER DEVELOPMENT
    Installation Of Hot Line Electric Supply At Newly Constructed District Court Complex Kaloosa Bandipora (std Part) (pddss25261001870) - Installation Of Hot Line Electric Supply At Newly Constructed District Court Complex Kaloosa Bandipora (std Part) (pddss25261001870).
    End Date 20 Apr 2026 12:00 PM 13 days left
    Location Bandipora, Jammu And Kashmir
    Department Refer doc
    Amount ₹ 12 L
    Amount: ₹ 12 L
    DEPARTMENT OF POWER DEVELOPMENT
    Creation Of 1x100kva Alongwith Ht/lt And Street Lighting From Ranga Morh To Baltal -domail Road
    End Date 20 Apr 2026 12:00 PM 13 days left
    Location Ganderbal, Jammu And Kashmir
    Department Refer doc
    Amount ₹ 25.54 L
    Amount: ₹ 25.54 L
    DEPARTMENT OF POWER DEVELOPMENT
    2 days left
    Supply, Installation, Testing And Commissioning Of 11 Kv Vcb Panels For Receiving Station Sogam Of Std Sopore Under District Capex.
    End Date 09 Apr 2026 12:00 PM 2 days left
    Location Baramulla, Jammu And Kashmir
    Department Refer doc
    Amount ₹ 12.17 L
    Amount: ₹ 12.17 L
    DEPARTMENT OF POWER DEVELOPMENT
    20 hours left
    Rate Contract 2026-27 - Rate Contract For Upkeep / Maintenance Of Existing 66-33//11 Kv Receiving Stations Along With Their 66/11 Kv Lines And Fabrication & Handling Of Material Of Divisional Store Under The Jurisdiction Of Sub-transmission Division-ii, Jpdcl, Jammu For The Year 2026-27
    End Date 07 Apr 2026 12:00 PM 20 hours left
    Location Jammu, Jammu And Kashmir
    Department Refer doc
    Amount ₹ 18 L
    Amount: ₹ 18 L
    DEPARTMENT OF POWER DEVELOPMENT
    Fixing Of Rate Contract For Handling Of Various Material In Divisional Stores At Miran Sahib Of Electric Division-ii Jpdcl Gandhi Nagar Jammu For The Financial Year 2026-27 - Fixing Of Rate Contract For Handling Of Various Material In Divisional Stores At Miran Sahib Of Electric Division-ii Jpdcl Gandhi Nagar Jammu For The Financial Year 2024-25.
    End Date 17 Apr 2026 12:00 PM 10 days left
    Location Jammu, Jammu And Kashmir
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    DEPARTMENT OF POWER DEVELOPMENT
    Supply Of Transformer Oil For Elect. Central Workshop Division And Electrical Divisions Under Jurisdiction Of Superintending Engineer, Operation And Maintenance Circle, Jpdcl, Jammu (i.e.,ed-i, Ed-ii, Ed-iii) For The Fy 2026-2027 Or Till Finalization Of Next Tender
    End Date 15 Apr 2026 12:00 PM 8 days left
    Location Jammu, Jammu And Kashmir
    Department Refer doc
    Amount ₹ 3.9 Cr
    Amount: ₹ 3.9 Cr
    DEPARTMENT OF POWER DEVELOPMENT
    Supply Of 2.8 Kva Portable Gen Sets (petrol Run) At Various Yatra Sites During Sanjy 2026.
    End Date 17 Apr 2026 12:00 PM 10 days left
    Location Ananthnag, Jammu And Kashmir
    Department Refer doc
    Amount ₹ 5.4 L
    Amount: ₹ 5.4 L
    DEPARTMENT OF POWER DEVELOPMENT
    Supply Of Items Required In Case Of Any Emergency/natural Calamity Related To Sanjy 2026
    End Date 17 Apr 2026 12:00 PM 10 days left
    Location Ananthnag, Jammu And Kashmir
    Department Refer doc
    Amount ₹ 4 L
    Amount: ₹ 4 L

    Select a tender to view details

    The Problem

    Why DEPARTMENT OF POWER DEVELOPMENT Tenders Get Rejected at the Technical Stage

    These are the most common rejection reasons our team sees — all 100% avoidable with the right support.

    Documentation Errors
    Incorrect formats or missing mandatory certificates often lead to rejection.
    Submission Delays
    Waiting until the last minute often leads to technical glitches & failure.
    The Solution

    Everything You Need to Win DEPARTMENT OF POWER DEVELOPMENT Tenders — In One Platform

    End-to-end bid support from documentation to order confirmation.

    📁
    Documentation Support
    We prepare your complete technical & financial bid folders — rejection-proof.
    • EMD / Bank Guarantee preparation
    • QR certificate compilation & verification
    • MAF & OEM authorization letters
    💻
    Portal Management
    End-to-end bid submission so you never miss a deadline.
    • Bid submission on portal
    • Document upload & correct tagging
    • Deadline alerts & reminders
    🤝
    Post-Bid Support
    We stay with you from submission to order confirmation.
    • Technical Query (TQ) response
    • Evaluation stage liaisoning
    • LOI / Work Order follow-up
    Our Process

    How It Works — 4 Simple Steps

    1
    Free Eligibility Check
    WhatsApp company profile, AI checks QR fit within 2 hours
    2
    Document Review
    we audit existing documents against tender NIT requirements
    3
    Bid Preparation
    we prepare all technical & financial folders, 100% compliant
    4
    Submit & Win
    submission supported, liaisoning through evaluation
    FREE DOWNLOAD
    DEPARTMENT OF POWER DEVELOPMENT Tender Checklist:
    10 Must-Have Documents
    The exact checklist our team uses for every DEPARTMENT OF POWER DEVELOPMENT bid — never get rejected for a missing document.
    FAQ

    Frequently Asked Questions about DEPARTMENT OF POWER DEVELOPMENT Bidding

    How to register as a vendor for DEPARTMENT OF POWER DEVELOPMENT?

    Submit the required registration form along with your company registration documents, GST certificate, PAN, and relevant experience certificates on the DEPARTMENT OF POWER DEVELOPMENT vendor portal. You'll also need to clear a financial assessment. GeMTech PARAS manages the entire empanelment process — contact us for a free eligibility assessment.

    What is the EMD requirement for DEPARTMENT OF POWER DEVELOPMENT tenders?

    EMD is typically 2–3% of the estimated tender value, submitted as a Bank Guarantee (BG) from a scheduled commercial bank. The bank branch and BG format must be pre-approved. Submitting a DD or an incorrect BG format is the single most common rejection reason. The exact amount and format are always specified in the NIT — we verify this for every bid we manage.

    Chat with a DEPARTMENT OF POWER DEVELOPMENT Expert