🔴  3 INTEGRAL COACH FACTORY tenders closing in under 3 days — review & act now —  Review & act now
INTEGRAL COACH FACTORY Tenders — Updated May 2026

Latest INTEGRAL COACH FACTORY Tenders — Updated Daily

Access the latest Integral Coach Factory tenders through GeMTech Paras, your trusted platform for all ICF procurement opportunities. Whether you are interested in ICF Chennai tenders, railway coach manufacturing contracts, or related supply and service tenders, GeMTech Paras keeps you updated with real-time notifications and detailed tender information. Participate confidently in ICF eTender processes with our easy-to-use platform.
Read More

GeMTech PARAS aggregates live INTEGRAL COACH FACTORY tenders in one searchable platform. Every active tender is indexed, filtered, and matched to your company profile automatically. Stop manually checking portals — let the data come to you.

137
INTEGRAL COACH FACTORY Tenders Tracked
366+
Clients Across India
4.9
Google Rating
24hr
Response Turnaround
98%
Compliance Rate

    INTEGRAL COACH FACTORY
    Showing 1 to 25 of 137 for Integral Coach Factory Tenders
    INTEGRAL COACH FACTORY
    Expired Today
    Supply Of Door Cut Out Assembly For Lgs/eog Coaches To Icf Drg No Ssa14028,col.i, Alt "e" Special Condition : Packing To Be Done As Per Drg No Icf/j&t/sk/1845. [ Warranty Period:30 Months After The Date Of Delivery ]
    End Date Expired
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Expired Today
    Supply Of Wood Based Impregnated Compressed Laminated Sheet Size: 4 X 1220 X2440mm (plain Board) To Rdso Specn. C-9407, Type-i, Rev.04.please Visit Icf Vendor Portal Fordownloading Drawing Https://vp.icf.gov.in/vendtendordetnew.php Using Key:0726pmeki0x1607. [ Warranty Period: 84 Months After The Date Of Delivery ]
    End Date Expired
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Supply Of Pneumatic System Comprising Of Main Air Compressor Set (splash Lubricated/oil Free) Along With Mounting Frame Assembled With 3 Phase Induction Motor, Filters, And Pressure Switches, Control & Air Dryer, Filters Etc., As Per Clause 4.14.17 Of Rdso Specification. The Bidder Should Indicate The Type Of Compressor Offered In This Bid. (one Set Per Basic Unit) [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 12 May 2026 12:00 PM 7 days left
    Location Multi City, Multi State
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Corrigendum : Supply And Installation Of Drivers Cab Interior Panelling For Memu/dmc5/3ph/ob & Memu/dmc6/3ph/ob Coaches To Drg.no.745-9-0-020, Col-i, Alt-b.please Visit Icf Vendor Portal For Downloading Drawing Https://vp.icf.gov.in/vendtendordetnew.php Using Key: 07260i68dmi1633 [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 18 May 2026 12:00 PM 13 days left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Corrigendum : Supply And Installation Of One Coach Set Of Seats For Memu/dmc5/3ph, Memu/dmc6/3ph And Memu/ndmc2/3ph Coaches To Drg.no. Memu/dmc5/3ph (780)-6-1-001, Col-1,alt-a.(except Items- 7 To 9). Cushioning Material Shall Be Pu Foam To Rdso Specn.rdso/2007/cg-04, Rev-01 Or Latest And Upholstery To Rdso Spec.rdso/2008/cg-07 Rev-01 Or Latest. Note: Firm Has The Option For Offering Seats And Berths Cushion With Lower Density Of 65 Plus Or Minus 5 Kg/m3 Conforming To Spec.rdso/2007/cg-04, Rev-01 Or Latest Also. Please Visit Icf Vendor Portal For Downloading Drawing Https://vp.icf.gov.in/vendtendordetnew.php Using Key: 0726pfptvow1636 [ Warranty Period: 120 Months After The Date Of Delivery ]
    End Date 18 May 2026 12:00 PM 13 days left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    2 days left
    Supply And Application Of High Performance Anti Corrosion Epoxy Coating (two Pack) Finishing Paint Colour:green To Specn.rdso/m&c/pcn/123-2018,on Coach Components For Various Builds As Per Following Reference Drawings. 1.465-9-0-003 Alt "c'- For All Lhb And Train-18 Platform Coaches. 2.329-9-0-076 Alt "k'- For All Icf Conventional And Demu Coaches. 3.329-9-0-078 Alt "c'- For Emu And Wiper Body Coaches. 4.653-9-0-004 Alt "nil'- For Kolkatta Metro Coaches.[quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ]
    End Date 07 May 2026 12:00 PM 2 days left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Expired Today
    Corrigendum : Supply And Installation Of Hpl & Ss Panel In Pantry Area To Drg No.857-4-3-001 Alt-b Except Item 1,2,3 & 5. Please Visit Icf Vendor Portal For Downloading Drawing Https://vp.icf.gov.in/vendtendordetnew.php Using Key: 0726fim12ts1570 [ Warranty Period: 30 Months After Thedate Of Delivery ]
    End Date Expired
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Expired Today
    Corrigendum : Supply Of Wood Based Impregnated Compressed Laminated Sheet Size: 8 X 1220 X 2960mm(plain Board) To Rdso Specn. C-9407, Type-ii, Rev.04.please Visit Icf Vendor Portal For Downloading Drawing Https://vp.icf.gov.in/vendtendordetnew.php Using Key: 0726gfh8uft1623. [ Warranty Period: 84 Months After The Date Of Delivery ]
    End Date Expired
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    1 day left
    Supply Of Under Frame Arrgt For Memu/ndmc2/3ph To Drg No. 78211001, Alt 'a', Col 1. Firm Shall Fulfil The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01 Rev.02 With Amendment No.02. Special Condition : Special Care To Be Taken For Under Slung Items While Transit, Loading And Unloading. The Underframe Should Be Supplied As Normal Side Up And Side Bearer Side Down. Packing To Drg No. Icf/j&t/misc-2487,alt-'b'. Details For Satge Inspection. (a) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Checked & Recorded (c) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Necessary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # Weldparameters To Be Checked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (d) Surface Preparation And Painting Stage. # Short/sand Blast To The Requirements. # Painting Process As Per The Specification. # Visual Inspection. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-metallic Corrossion. [safety Item ]
    End Date 06 May 2026 12:00 PM 1 day left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    1 day left
    Supply Of Universal Testing Machine Electromechanical 20t Capacity As Per Detailed Technical Specification Enclosed. [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 06 May 2026 12:00 PM 1 day left
    Location Multi City, Multi State
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Expired Today
    Corrigendum : Supply Of Stainless Steel Tubes And Double Ferrule Fittings For 3 Phase Memu/tc Coaches To Material Schedule No Icf/sk-10-2-647, Issue Status.01, Rev -02,,read Along With Icf/md/spec-166,issue Status-01,rev-04,amd-01 & Amd-02. [ Warranty Period: 48 Months After The Date Of Delivery ]
    End Date Expired
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Expired Today
    Corrigendum : Supply Of One Coach Set Of Stainless Steel Roof And Side Wall For 3 Phase Ac Emu Motor Coaches To Drg.nos. 77016001 Col-i Alt 'a' - 1 No, 61714001, Alt 'a' - 1 No Col I And Col Ii - 1 No. (without Forced Air Circulation) Firm Shall Fulfill The Requirement As Per Icf/md/spec-200, Issue Status-01, Rev-04 With Amendment No 1. Special Condition : -packing Condition As Per Latest Alteration Of Icf/j&t/misc-2402, Alt 'b'.[safety Item ]
    End Date Expired
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    1 day left
    Corrigendum : Supply And Installation Of E.p Brake Equipment For Memu/dmc/3ph Coaches To Rdso Specification Rdso/2013/cg-03 (latest Revision/amendment) And To Material Schedule No.icf/sk-10-2-645,issue Status-01,rev-00,cs-01,cs-02,cs-03 & Cs-04.. Installation: Installation To Be Done As Per Scope Of Installation & Testing Icf/mfpl/170/001,issue Status -01,rev-02,amd-01 And Schedule Of Drawing And Permissible Timings. Icf/mfpl/170/645, Issue Status -01,rev-00. Note: Quantity Required Per Rake: 2sets [ Warranty Period: 36 Months After The Date Of Delivery ]
    End Date 06 May 2026 12:00 PM 1 day left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Expired Today
    Supply Of Ctrb Bearing For Vb/train Set To Timken Drg No.e59773 To Rdso Spec. No Rdso/2014/cg-02, Rev-01---- Or To Ctrb Oem's Drawing That Has Been Approved/cleared By Rdso For The Subject Item. Oems Quoting With Their Drawing(s) Should Enclose Rdso's Approval/clearance Along With The Offer. Special Condition : Item To Be Packed In Pallets/crates Made Of Plastic/reusable Alternate Packing Material. Note: May Be Supplied In Wooden Boxes Till New Pallet Is Developed. [ Warranty Period: 48 Months After The Date Of Delivery ]
    End Date Expired
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Expired Today
    Supply And Installation Of One Pair Of Bodyside Entrance Door For Lhb (lh & Rh) To Drg No. 58151003 Col.i Alt 'e' -1 No & 58151004 Col.i Alt.'e' -1 No. Special Condition : 1) Installation Required As Per Assy Drg And Annexure A, Dtd 13-09-2023 To Be Followed. 2) Supply Rates And Installation Rates To Be Quoted Separately. 3) Packing Condition As Per Icf/j&t/sk-1866.[safety Item ]
    End Date Expired
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Expired Today
    Supply Of Bogie Frame To Drg. No. (a) Icf/mrvc/d-0-3-001, Alt "n", Col-ii (or) (b) Icf/mrvc/d/bt-0-3-001, Alt "c", Col -ii Along With Damper Fixing Bracket To Drg. No. (339)ac/dcemu/d6-0-1-602,col.i - 4 Nos Andbolt Complete To Drg. No. Emu/m/3ph-0-2-002, Alt "c", Col.i - 16 Sets Bogie Frame To Be Supplied Without Nylon Bushes Where Ever Applicable And Shall Confirm To Rdso/specn.c-9202, Rev-2 Or Latest. The Firm Shall Fulfil The Requiremnt As Per Icf/md/specn/147, Issue Status 01, Rev-02 With Amendment No- 02. Special Condition : - Suppliers Commitment Will Be There To Supply As Per Drawing -(a) ( For Dash Pot Arrangement ) Or As Per New Drawing - (b) ( For Adoption Of Conical Spring ). - One Month Notice Willbe Given To Vendor Whether He Has To Supply As Per Drawing - (a) Or Drawing - (b). -rate Quoted Will Be Applicable To Both Drawing - (a) And Drawing - (b) . I) Paint Scheme Shall Be As Per Drawing. Ii) Qap To Format Icf/ims/md/f-31 Shall Be Prepared Along With Relevant Documents And Kept Ready For Developmental/educational Order. Iii)firm Should Supply Bogie Frame Along With The Dimensional Report, Stress Relieving Report And Radiography Films. Iv) Firm Should Have Induction/electric Furnace For Stress Relieving Of Bogie Frame. V) Prototype Inspection Is Applicable Only For First Time Of Developmental/educational Order. Vi) Stage Inspection To Be Done As Below. (a) Raw Material Stage 1. Ensure The Raw Material Used Using Portable Spectrometer Machining Stage 1. Dimensional Checks 2. Edge Preparations (b)welding Stage 1. Weld Parameter To Be Checked And Recorded. (c) Surface Preparation And Painting Stage. 1. Short/sand Blast To The Requirements. 2. Painting Process As Per The Specification. 3. Final Product Inspection. [ Warrantyperiod: 30 Months After The Date Of Delivery ]
    End Date Expired
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Expired Today
    Supply Of Pallets To The Attached Drawing Number Icf/j&t/misc-2878. Alt A, For Storage Of Heavy Fasteners. Painting Condition As Per The Drawing. Pallet To Be Painted With A) Two Pack Epoxy Primer, B) Puprimer/undercoat And C) Pu Enamel Topcoat. Before Application Of The Primer A Good Surface Preparation Like Degreasing Is To Be Carried Out By Washing Or Wiping With Suitable Solvent. Thoroughly Sand The Surface With Emery Paper 180, So As To Remove Loose Rust And Wipe Clean. Apply 2 Pack Epoxy Primer. Before Applying Pu Primer/under Coat Sand The Primer With Emery Paper No. 400. Wipe Clean And Ensure That The Surface Is Free Of Particles. Before Applying Top Coat Sand The Pu Primer/under Coat With Emery Paper No. 400. Wipe Clean And Ensure That The Surface Is Free Of Particles. Then Apply Pu Enamel Topcoat (brands : Asian Or Berger Or Indigo Or Dulux Or Nerolac). Colour: Pink/magenta. Note: Topcoat To Be Applied Only After Getting Confirmation Of The Exact Colour Shade Of The Respective Brand From The Consignee. Allocation: P4275 4 000 52451 001000 [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date Expired
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Expired Today
    Lwscz Shell Kit (a) Lscz - One Coach Set Of Roof, 2 Mm Sidewall And End Wall For Lwscz Coaches. 1) Sidewall Assembly To Drg.no. (329) Icf/sk3-1-4-091, Alt 'b' , Col- 1 - 1 No. 2) Roof Assembly To Drg.no. (lwscz) 73916001, Alt 'd', Col-i - 1 No. 3) End Roof Assembly To Drg.no.(ls) 58116066, Alt 'h', Col-i - 2 Nos. Welding Pin To Drg No 81410012 Alt Nil To Be Assembled On Roof And Sidewall 4) Endwall To Drg.no. (lslrd) 74115001, Alt 'j'-2 Nos. The Firm Shall Fulfil The Requirement As Per Icf//md/specn.200, Issue Status 01, Rev 04 With Amendment No. 01. The Firm Shall Fulfil The Requirement As Per Icf/md/spec-315, Issue Status-01, Rev.00, Amendment No. 01. Firm Has To Supply Roof And Sidewall Without Applying Etch Primer. (b)one Coach Set Of Body Shell Items And Partition Frames For Lwscz2(814) Coaches To Drg Nos, 1. 81410002, Alt Nil- 1no. 2. 81410005, Alt 'e'- 1 No. 3. 58210036, Alt 'b'- 2 Nos. 4. 67010011, Alt 'a'- 2 Nos. 5. 58110017, Alt 'c'- 2 Nos. 6. Aag10457, Alt Nil- 4 Nos. 7. Aab10338, Alt Nil-16 Nos. 8. 58110015, Alt 'a'- 6 Nos. 9. 58110016, Alt 'a'-3 Nos. (c) Under Frame Arrangemnt To Drg No. 81411001 Alt 'f' The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01 Rev.02 With Amendment No.02. Special Condition : A) -packing As Per Icf/j&t/misc-2201, Alt 'e', Safety Instruction As Per Icf/j&t/sk-1867, Alt. 'nil' -packing As Per Icf/j&t/sk-1809, Alt 'a'. B) - Packing Condition As Per Icf/j&t/sk-1865, Alt "a". C) Packing Condition As Per Drg.no.icf/j&t/misc-2487, Alt 'b' The Underframe Should Be Supplied As Normal Side Up And Side Bearer Side Down. Stage Inspection Details. (a) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Checked & Recorded (c) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Necessary. # Marking & Placing Of Detail Items.
    End Date Expired
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    2 days left
    Corrigendum : Shell Kit For Memu Dmc2 Jk 946 A. Roof Assembly 94416001 000 01, Alt 'nil' - 1 No. Location Of Sidewall 94414001 000 01, Alt 'nil' - 1 No. End Construction Pail End 94615001 000 01, Alt 'nil' - 1 No. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/specn-200, Issue Status 01, Rev 04 With Amendment No 01. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/specn-315, Issue Status 01, Rev.0 0with Amendment No 01. B.supply Of One Coach Set Of Body Shell Items And Partition Frames For Memu Dmc2 Jk 946 To Drawing Nos: 1. 94410003 000 01, Alt 'a' - 1 No 2. 74510257 000 01, Alt 'nil' - 1 No 3. 94410004 000 01, Alt 'nil' - 1 No 4. 74510045 000 01, Alt 'nil' - 1 No 5. 94410005 000 01, Alt 'nil' - 1 No 6. 94410002 000 01, Alt 'b' - 1 No. 7. 94410076 000 01, Alt 'nil' - 1 No 8. 94410072 000 01, Alt 'nil' - 1 No 9. 94410054 000 01, Alt 'nil' - 2 Nos. C. Under Frame Arrangement 94411001 000 01, Alt 'a' - 1no. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/specn-147, Issue Status 01 Rev.02 With Amendment No.02. Special Condition : Packing As Per Icf/j&t/misc-2201, Alt 'e'. Packing As Per Icf/j&t/sk-1809, Alt 'a'. Packing Condition As Per Drg.no.icf/j&t/misc-2487, Alt 'b' The Underframe Should Be Supplied As Normal Side Up & Side Bearer Side Down. Packing Conditionas Per Icf/j&t/sk-1865, Alt 'a'. (a) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Checked & Recorded (c) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Necessary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # Weld Parameters To Be Checked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (d) Surface Preparation And Painting Stage.
    End Date 07 May 2026 12:00 PM 2 days left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    17 hours left
    Corrigendum : Supply Of Kolkata Metro Dtc Under Frame Sub Assy Set Consists Of 1)body Bolster Module To Drg.no. (652)mrm/mc-1-1-002, Alt 'j' Col 1 -1 No, 2)body Bolster Module To Drg No. (651)mrm/dtc-1-1-004, Alt 'g' Col 1 -1 No, 3)head Stock Module To Drg No. (983)mrm2/mc-1-2-001, Alt 'b', Col 3- 1 No, 4)head Stock Module To Drg No.(982)mrm2/dtc-1-2-001, Alt 'nil',col 1- 1 No, 5)l Beam Assy To Drg No. (651)mrm/dtc-1-1-002, Alt 'k', Col 4 -1 No 6)l Beam Assy To Drgno. (651)mrm/dtc-1-1-002, Alt 'k', Col 3 -1 No. The Firm Shall Fulfil The Manufacturing Facility As Per As Per Icf/md/specn-147 Rev-02 With Amendment-02. The Firm Shall Fulfil The Manufacturing Facility As Per Icf/md/spec-316, Issue Status-01,rev-00 Special Condition : Suitable Packing To Be Done To Prevent Damage During Transit, Unloading And Rust Prevention During Storage. [safety Item ]
    End Date 05 May 2026 12:00 PM 17 hours left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Expired Today
    Supply Of One Set Of Toilet Doors To Drg.no: 329-63-283 Alt B - 01 No And Drg.no: 329-63-285alt "nil" - 01 No To Zonal Railways For Vb Chair Car Mc/tc/ndtc For Replacement During Ss-ii Maintenance Special Conditions: I) Item To Be Directly Delivered To Zonal Railway Workshops As Per The Split Up Quantity Specified In Annexure-a. [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date Expired
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    2 days left
    Supply Of Shell Kit Item (lslrd Without Dg Set)
    End Date 07 May 2026 12:00 PM 2 days left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    1 day left
    Corrigendum : Supply Of Traction Lever To Drg. No.45505006 Col I, Alt 'c'. (rcf Pl.no.33500551) Special Condition : 1. Each Item To Be Properly Wrapped In Biodegradable Transparent Plastic Sheet To Avoid Water Ingress. 2. The Items Should Be Separated By Using Suitable Eco Friendly Cushioning Material To Protect Machined Portion From Damage & Rubbing. 3. All Machined Surface Shall Be Protected From Corrosion As Per Rcf Spec. Md.44121 Dt.19.04.2011(para 1). 4.items To Be Stacked Properly In Sturdy Wooden Boxes, Which Can Be Handled By Fork Lift/crane. 5. Label With Details Of Description Of Item, Drg. No., Quantity, Po No., Pl No., And Name Of The Supplier, Etc., To Be Affixed On The Pallet. [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 06 May 2026 12:00 PM 1 day left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    1 day left
    Corrigendum : Supply Of Corrugated Sheet Floor For Lhb Front Part To Drg No Aaa13119 Alt "a" - 1 No. Special Condition : Suitable Packing To Be Done To Avoid Damage During Transit, Unloading And Rust Prevention During Storage. [safety Item ]
    End Date 06 May 2026 12:00 PM 1 day left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    1 day left
    Application Maintenance & Support (ams) Services For Enovia 3d Experienceplm Solution Implemented At D&d Centre
    End Date 06 May 2026 12:00 PM 1 day left
    Location Multi City, Multi State
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc

    Select a tender to view details

    The Problem

    Why INTEGRAL COACH FACTORY Tenders Get Rejected at the Technical Stage

    These are the most common rejection reasons our team sees — all 100% avoidable with the right support.

    Documentation Errors
    Incorrect formats or missing mandatory certificates often lead to rejection.
    Submission Delays
    Waiting until the last minute often leads to technical glitches & failure.
    The Solution

    Everything You Need to Win INTEGRAL COACH FACTORY Tenders — In One Platform

    End-to-end bid support from documentation to order confirmation.

    📁
    Documentation Support
    We prepare your complete technical & financial bid folders — rejection-proof.
    • EMD / Bank Guarantee preparation
    • QR certificate compilation & verification
    • MAF & OEM authorization letters
    💻
    Portal Management
    End-to-end bid submission so you never miss a deadline.
    • Bid submission on portal
    • Document upload & correct tagging
    • Deadline alerts & reminders
    🤝
    Post-Bid Support
    We stay with you from submission to order confirmation.
    • Technical Query (TQ) response
    • Evaluation stage liaisoning
    • LOI / Work Order follow-up
    Our Process

    How It Works — 4 Simple Steps

    1
    Eligibility Check
    WhatsApp company profile, AI checks QR fit within 2 hours
    2
    Document Review
    we audit existing documents against tender requirements
    3
    Bid Preparation
    we prepare all technical & financial folders, 100% compliant
    4
    Submit & Win
    submission supported through evaluation
    FREE DOWNLOAD
    INTEGRAL COACH FACTORY Tender Checklist:
    10 Must-Have Documents
    The exact checklist our team uses for every INTEGRAL COACH FACTORY bid — never get rejected for a missing document.
    FAQ

    Frequently Asked Questions about INTEGRAL COACH FACTORY Bidding

    How to register as a vendor for INTEGRAL COACH FACTORY?

    Submit the required registration form along with your company registration documents, GST certificate, PAN, and relevant experience certificates on the INTEGRAL COACH FACTORY vendor portal. You'll also need to clear a financial assessment. GeMTech PARAS manages the entire empanelment process — contact us for a free eligibility assessment.

    What is the EMD requirement for INTEGRAL COACH FACTORY tenders?

    EMD is typically 2–3% of the estimated tender value, submitted as a Bank Guarantee (BG) from a scheduled commercial bank. The bank branch and BG format must be pre-approved. Submitting a DD or an incorrect BG format is the single most common rejection reason. The exact amount and format are always specified in the NIT — we verify this for every bid we manage.

    Chat with a INTEGRAL COACH FACTORY tender Expert