🔴  3 INTEGRAL COACH FACTORY tenders closing in under 3 days — review & act now —  Review & act now
INTEGRAL COACH FACTORY Tenders — Updated April 2026

Latest INTEGRAL COACH FACTORY Tenders — Updated Daily

Access the latest Integral Coach Factory tenders through GeMTech Paras, your trusted platform for all ICF procurement opportunities. Whether you are interested in ICF Chennai tenders, railway coach manufacturing contracts, or related supply and service tenders, GeMTech Paras keeps you updated with real-time notifications and detailed tender information. Participate confidently in ICF eTender processes with our easy-to-use platform.
Read More

GeMTech PARAS aggregates live INTEGRAL COACH FACTORY tenders in one searchable platform. Every active tender is indexed, filtered, and matched to your company profile automatically. Stop manually checking portals — let the data come to you.

340
INTEGRAL COACH FACTORY Tenders Tracked
366+
Clients Across India
4.9
Google Rating
24hr
Response Turnaround
98%
Compliance Rate

    INTEGRAL COACH FACTORY
    Showing 1 to 25 of 340 for Integral Coach Factory Tenders
    INTEGRAL COACH FACTORY
    Corrigendum : Supply Of S & I Of Nose Cone (spic Kavach)
    End Date 20 Apr 2026 12:00 PM 5 days left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    2 days left
    Corrigendum : Supply Of C/s Of Lscn Carline Assembly
    End Date 17 Apr 2026 12:00 PM 2 days left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    2 days left
    Corrigendum : Supply Of Cable 50 Sq Mm Gnye 1.8kv
    End Date 17 Apr 2026 12:00 PM 2 days left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    2 days left
    Corrigendum : Supply Of Coach Set Of Roof Assembly (lws/bw2)
    End Date 17 Apr 2026 12:00 PM 2 days left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    20 hours left
    Corrigendum : Supply Of Ss Square Tube Size 2 X 20 X 20 X 6000mm
    End Date 15 Apr 2026 12:00 PM 20 hours left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    20 hours left
    Supply Of Cable 6 Sqmm To Colour Gnye,red,black,yellow & Blue 1.8kv
    End Date 15 Apr 2026 12:00 PM 20 hours left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    1 day left
    Corrigendum : Supply Of Unf Mig Brazing Wire 0.8 Mm In Spool
    End Date 16 Apr 2026 12:00 PM 1 day left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    2 days left
    Supply Of C/s Of Partition Frames And Body Shell Items (spic Kavach)
    End Date 17 Apr 2026 12:00 PM 2 days left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Corrigendum : Supply Of Cable 10 Sq Mm Chocolate 1.8kv
    End Date 20 Apr 2026 12:00 PM 5 days left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Corrigendum : Supply Of Unf Cable 95 Sq Mm Black 1.8 Kv
    End Date 20 Apr 2026 12:00 PM 5 days left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    20 hours left
    Supply Of S&i Of Divyangjan Mod Toilet Lslrd Ab Coaches
    End Date 15 Apr 2026 12:00 PM 20 hours left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    1 day left
    Supply Of Coach Set Of Carline Assembly (ls)
    End Date 16 Apr 2026 12:00 PM 1 day left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    20 hours left
    Supply Of Sni Of Paneling Lws/pp2
    End Date 15 Apr 2026 12:00 PM 20 hours left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    20 hours left
    Supply Of Sni Of Interior Panel Mrm2/tc
    End Date 15 Apr 2026 12:00 PM 20 hours left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Supply Of Liquid Oxygen For Industrial Use Minimum Purity 99.0% When Tested Ingaseous Form As Per Clause 4.1 & 4.2 Of Is:309/92 With Amendment No.1.
    End Date 20 Apr 2026 12:00 PM 5 days left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Corrigendum : Supply Of Cable Multi Core 4x1.5 Sq Mm Screened,600v
    End Date 22 Apr 2026 12:00 PM 7 days left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    1 day left
    Supply Of Cable 70 Sq Mm Gnye 1.8 Kv
    End Date 16 Apr 2026 12:00 PM 1 day left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    1 day left
    Corrigendum : Supply Of Machined Items Kit For Fiat Bogie 1) Fixation Ball Joint To Drg.no.aaa01027, Alt 'a'- 16 Nos 2) Distance Bush To Drg.no. Aaa05100, Alt'a' - 16 Nos---- 3) Curve Roll To Drg.no. Lwscwac-0-0-002, Alt'b', Item-1 - 4 Nos Supplier Shall Ensure That Component Is Protected Against Rust/corrosion During Transit And Storage With As Easily Removable Rust/corrosion Protectant, As Per Rcf Specification Md44121, Dated 19-04-2011(para-2) 4) Distance Holder To Drg.no. Aaa05055, Alt 'a'- 2 Nos Supplier Shall Ensure That Component Protected Against Rust/corrosion During Transit And Storage With As Easily Removable Rust/corrosion Protectant, As Per Rcf Specification Md 44121 Dated 19-04-2011(para-1) 5) Distance Holder To Drg.no. Aaa05054, Alt'a'- 2 Nos Supplier Shall Ensure That Exposed Metal Parts Are Protected Against Rust/corrosion During Transit And Storage With As Easily Removable Rust/corrosion Protectant,as Per Rcf Specification Md 44121 Dated 19-04-2011 (para-1) Special Condition : All The Items Are To Be Supplied As Coach Set Only. Suitable Packing To Be Done To Avoid Damage During Transit, Unloading And Rust Prevention During Storage [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 16 Apr 2026 12:00 PM 1 day left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    1 day left
    Corrigendum : Supply Of Secondary Vertical Damper Bracket Assembly Rh For Fiat Bogie With Air Spring To Drg. No. 83403006, Col-i, Alt-a. Special Condition : Suitable Packing To Be Done To Avoid Damage During Transit, Unloading And Rust Prevention During Storage [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 16 Apr 2026 12:00 PM 1 day left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Corrigendum : Supply Of Liquid Argon With Purity Of 99.99%[quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ]
    End Date 28 Apr 2026 12:00 PM 13 days left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Corrigendum : Supply Of Guide Bush For Axle Box Guide Arrgt To Drg No. Emu/m-0-1-023/2 Alt `e'. Special Condition : Suitable Packing To Be Done To Avoid Damage During Transit, Unloading Andrust Prevention During Storage. [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 22 Apr 2026 12:00 PM 7 days left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Assembly And Welding Of - Stand Activities & Finishing Activities And Only Finishing Activities Of Different Variants Of Lhb & Dprs Shells In Lhb Division/ Icf Chennai
    End Date 22 Apr 2026 12:00 PM 7 days left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    Corrigendum : Supply Of Gas Acetylene Dissolved In Cylinders Is 308/1988 (third-revision)amendment-1.[quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ]
    End Date 27 Apr 2026 12:00 PM 12 days left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    20 hours left
    Corrigendum : Supply Of Motor Suspension Bush For Train18 To.gmt.drg.no.64064201 Rev-06 Special Condition : Suitable Packing To Be Done To Prevent Damage During Transit, Unloading And Rust Prevention During Storage. [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 15 Apr 2026 12:00 PM 20 hours left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    INTEGRAL COACH FACTORY
    20 hours left
    Corrigendum : Supply Of Aluminium Profile To Drg. No. Un43104, Alt-a. [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 15 Apr 2026 12:00 PM 20 hours left
    Location Chennai, Tamil Nadu
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc

    Select a tender to view details

    The Problem

    Why INTEGRAL COACH FACTORY Tenders Get Rejected at the Technical Stage

    These are the most common rejection reasons our team sees — all 100% avoidable with the right support.

    Documentation Errors
    Incorrect formats or missing mandatory certificates often lead to rejection.
    Submission Delays
    Waiting until the last minute often leads to technical glitches & failure.
    The Solution

    Everything You Need to Win INTEGRAL COACH FACTORY Tenders — In One Platform

    End-to-end bid support from documentation to order confirmation.

    📁
    Documentation Support
    We prepare your complete technical & financial bid folders — rejection-proof.
    • EMD / Bank Guarantee preparation
    • QR certificate compilation & verification
    • MAF & OEM authorization letters
    💻
    Portal Management
    End-to-end bid submission so you never miss a deadline.
    • Bid submission on portal
    • Document upload & correct tagging
    • Deadline alerts & reminders
    🤝
    Post-Bid Support
    We stay with you from submission to order confirmation.
    • Technical Query (TQ) response
    • Evaluation stage liaisoning
    • LOI / Work Order follow-up
    Our Process

    How It Works — 4 Simple Steps

    1
    Eligibility Check
    WhatsApp company profile, AI checks QR fit within 2 hours
    2
    Document Review
    we audit existing documents against tender requirements
    3
    Bid Preparation
    we prepare all technical & financial folders, 100% compliant
    4
    Submit & Win
    submission supported through evaluation
    FREE DOWNLOAD
    INTEGRAL COACH FACTORY Tender Checklist:
    10 Must-Have Documents
    The exact checklist our team uses for every INTEGRAL COACH FACTORY bid — never get rejected for a missing document.
    FAQ

    Frequently Asked Questions about INTEGRAL COACH FACTORY Bidding

    How to register as a vendor for INTEGRAL COACH FACTORY?

    Submit the required registration form along with your company registration documents, GST certificate, PAN, and relevant experience certificates on the INTEGRAL COACH FACTORY vendor portal. You'll also need to clear a financial assessment. GeMTech PARAS manages the entire empanelment process — contact us for a free eligibility assessment.

    What is the EMD requirement for INTEGRAL COACH FACTORY tenders?

    EMD is typically 2–3% of the estimated tender value, submitted as a Bank Guarantee (BG) from a scheduled commercial bank. The bank branch and BG format must be pre-approved. Submitting a DD or an incorrect BG format is the single most common rejection reason. The exact amount and format are always specified in the NIT — we verify this for every bid we manage.

    Chat with a INTEGRAL COACH FACTORY tender Expert