- Splitting
- Advisory Bank
- Reserved for MII
- Reserved for MSE
- Bid to RA Enabled
- Evaluation Method
- MSE Purchase Preference
- MSE Exemption
Splitting
Advisory Bank
Reserved for MII
Reserved for MSE
Bid to RA Enabled
Evaluation Method
MSE Purchase Preference
MSE Exemption
Showing 1 to 25 of 134 results for Integral Coach Factory Tenders
INTEGRAL COACH FACTORY
Supply, Installation And Commissioning Of 460 Pallet Positions Of Open Space Rack Clad Asrs With 460 Numbers Of Cage Type Pallets To Size 3200mm (w) X 2200mm (d) X 1650mm (h)
30 Oct 2025 (7 days left)
Refer doc
Multi State - Multi City
Refer doc
INTEGRAL COACH FACTORY
Supply Of Supp Of Uf Cable Harn Ljscz
03 Nov 2025 (11 days left)
Refer doc
Multi State - Multi City
Refer doc
INTEGRAL COACH FACTORY
Supply Of Coach Set Of Frames For Seats And Back Rests Of Lws Bw2 Coach Consist Of The Following 1) Four Seater Frame To Drg. Lg61229,alt- Nil- To Quantity-20 Nos, 2) Single Seater Frame-rh To Drg. Lg61233,alt- Nil- To Quantity-10 Nos, 3) Single Seater Frame-lh To Drg. Lg61231,alt Nil- To Quantity-10 Nos, 4) Four Seater Backrest Frame To Assembly Of Frame And Cushion Support To Drg.lg61234, Alt-nil,item 1,2,5 And 6 To Quantity-20 Nos, 5) Single Seater Back Rest Frame To Assembly Of Frame And Cushion Support To Drg.lg61237, Alt -nil ,item 1, 2,5 And 6 To Quantity-20 Nos, 6) Single Seater(mounting) Frame Assembly- (double) To Drg.lg61201, Alt- D To Quantity-8 Nos 7) Single Seater (mounting) Frame Assembly- Lh To Drg.lg61202,alt -c To Quantity- 2 Nos, 8) Single Seater (mounting) Frame Assembly- Rh To Drg.lg61203, Alt-d To Quantity- 2 Nos And 9) Sleeve For Single Seater Frame To Drg.lg61219, Alt-a To Quantity-12 Nos [ Warranty Period: 30 Months After The Date Of Delivery ]
24 Oct 2025 (1 day left)
Refer doc
Multi State - Multi City
Refer doc
INTEGRAL COACH FACTORY
Service Contract For Outsourcing Of Helpers In Mechanical Engineering Department Of Furnishing Division/icf.
24 Oct 2025 (1 day left)
Refer doc
Multi State - Multi City
Refer doc
INTEGRAL COACH FACTORY
Supply Of Retro Fitment Of Kavach Emu/memu
10 Nov 2025 (18 days left)
Refer doc
Tamil Nadu - Chennai
Refer doc
INTEGRAL COACH FACTORY
Supply Of Earthing Lug To Icf/sk 71512 Cl4 D-8mm
24 Oct 2025 (1 day left)
Refer doc
Tamil Nadu - Chennai
Refer doc
INTEGRAL COACH FACTORY
Supply Of S & I Of Lhb Lav Window With Louvre Arrgt.
27 Oct 2025 (4 days left)
Refer doc
Tamil Nadu - Chennai
Refer doc
INTEGRAL COACH FACTORY
Supply Of S & I Of Emergency Window
27 Oct 2025 (4 days left)
Refer doc
Tamil Nadu - Chennai
Refer doc
INTEGRAL COACH FACTORY
Need/call Based Maintenance For Cnc Systems Of M/s. Siemens Make Machines In Shell And Furnishing Division For A Period Of One Year.
27 Oct 2025 (4 days left)
Refer doc
Tamil Nadu - Chennai
Refer doc
INTEGRAL COACH FACTORY
Corrigendum : Supply Of Bogie Frame Assly (machined) For Air Spring In Secondary Suspension For Lhb Coaches.
27 Oct 2025 (4 days left)
Refer doc
Tamil Nadu - Chennai
Refer doc
INTEGRAL COACH FACTORY
Supply Of Rubber-metal Bonded Kit For Underslung Motor Coaches
28 Oct 2025 (5 days left)
Refer doc
Multi State - Multi City
Refer doc
INTEGRAL COACH FACTORY
Supply Of Unf S & A Anti-graffiti Coating.
28 Oct 2025 (5 days left)
Refer doc
Multi State - Multi City
Refer doc
INTEGRAL COACH FACTORY
Supply Of Roof Sheet Complete To Drg No. 58116065, Alt 'h' To Be Supplied As A Single Roof Sheet Asembly As Per Note No. - 12 & 13 Remarks. Special Condition : - Packing Condition As Per Icf/j&t/misc-3019, Alt. 'a'. [ Warranty Period: 30 Months After The Date Of Delivery ]
30 Oct 2025 (7 days left)
Refer doc
Multi State - Multi City
Refer doc
INTEGRAL COACH FACTORY
Supply And Installation Of Co2 Gas Line At Parking Shed And Sand Spray Shed Of Lhb Shop Detailed Scope Of Work Enclosed. [ Warranty Period: 30 Months After The Date Of Delivery ]
28 Oct 2025 (5 days left)
Refer doc
Multi State - Multi City
Refer doc
INTEGRAL COACH FACTORY
Supply Of Side Buffer Arrangement With Face Plate Rivetted To Drg.no. Icf/std-2-2-009col.i Alt `j' (excluding Item- 12,14 & 15) And Icf/md/spec-252 Issue Status-o1, Rev-00 With Amendment No-1, 2, 3 And 4. Special Condition : To Be Packed In A Wooden Box. First Time Suppliers Shall Get Prototype Approved By Icf Designs In Compliance To The Specification Icf/md/spec-252 Issue Status-o1, Rev-00 With Amendment No1, 2, 3 And 4. [safety Item ]
06 Nov 2025 (14 days left)
Refer doc
Multi State - Multi City
Refer doc
INTEGRAL COACH FACTORY
Corrigendum : Supply Of S & I Of Interior Furnishing Of Ac Spic
24 Oct 2025 (1 day left)
Refer doc
Tamil Nadu - Chennai
Refer doc
INTEGRAL COACH FACTORY
Bogie Frame Assly (machined) For Air Spring In Secondary Suspension For Lhb Coaches To Drg No:(a) 66703001, Col.i Alt.'c'--- (or) (b*) 834-0-3-002, Alt 'b' --- Suppliers Commitment Will Be There To Supply As Per Drawing-(a) (for Lhb Non Ac Air Spring Coaches), Or As Per Drawing -(b)(for Lhb-ac Air Spring Coaches) *for Identification Purpose Of Bogie Frame, (i)drg (a) Shall Be Marked With Yellowpaint On Brake Beam End Face On Both Sides Of Bogie Frames And N227 Is To Be Punched In Letter Height Of 10mm After Year Or Availble Space On Other Location Of Bogie Number Plate, (ii)drg (b), A242 Is To Be Punched In Letter Height Of 10mm After Year Or Availble Space On Other Location Of Bogie Number Plate. The Ratio Of Supply Between (a) & (b) Has To Be Confirmed Before The Issue Of Purchase Order. Rate Quoted Will Beapplicable To Both Drawing-(a) And Drawing-(b). Special Condition : The Material Specification For Plates Of Various Thickness Used For Fabrication Of Bogie Frame Will Be As Per En10025, Part-5, 2005 . Grade S355 J2w+n ,in Lieu Of Earlier Specified Material Grade St 52.3 And S355 J2 G3 , En10025/29 In Various Related Sub Assembly And Component Drawings And Specn.mdts-213, Rev-04 Or Latest And Mdts-166, Rev-02 Or Latest Shall Be Generally Followed. Time Lag Between Shot Blasting And Painting Should Not Be More Than 30 Minutes In Any Case. Packing Condition As Per Document No.mpm0010 E Ver-6.0 Pi159 & Packing Condition As Per Drg.no. Icf/j&t/sk-1823. [ Warranty Period: 84 Months After The Date Of Delivery ]
27 Oct 2025 (4 days left)
Refer doc
Tamil Nadu - Chennai
Refer doc
INTEGRAL COACH FACTORY
Supply Of Control Arm Support Right To Rcf Drg.no.lw03246, Alt 'b' - 8 Nos. Control Arm Support Left To Rcf Drg.no.lw03247, Alt 'b' - 8 Nos. Special Condition : Infrastructure Requirements For Manufacturing & Testing Shall Be As Per Mdst-155, Rev.nil. Item To Be Packed In Suitable Steel Pallet. [ Warranty Period: 30 Months After The Date Of Delivery ]
03 Nov 2025 (11 days left)
Refer doc
Tamil Nadu - Chennai
Refer doc
INTEGRAL COACH FACTORY
Supply And Installation Of Interior Furnishing Of Air Conditioned Self Propelled Inspection Cars (spic) As Per The Revised Scope Of Work Dated 21.04.2021 Enclosed. Please Visit Icf Vendor Portalfor Downloading Drawing Https://vp.icf.gov.in/vendtendordetnew.php Using Key:07254vefidv2968 [ Warranty Period: 30 Months After The Date Of Delivery ]
24 Oct 2025 (1 day left)
Refer doc
Multi State - Multi City
Refer doc
INTEGRAL COACH FACTORY
Supply Of Disaster Management Light Vb El
03 Nov 2025 (11 days left)
Refer doc
Tamil Nadu - Chennai
Refer doc
INTEGRAL COACH FACTORY
Supply Of End Roof Assembly To Drg.no 97216008 Col-i Alt 'a' - 2 Nos The Firm Shall Fulfill The Requirement As Per Icf//md/specn 200, Issue Status 01, Rev 04 With Amendment No 01 Special Condition : There Will Be Minor Modification In Design Firm May Be Advised To Collect Final Drawing Before Manufacturing. Suitable Packing To Be Done To Prevent Damage During Transit, Unloading And Rust Prevention During Storage. [safety Item ]
30 Oct 2025 (7 days left)
Refer doc
Tamil Nadu - Chennai
Refer doc
INTEGRAL COACH FACTORY
Supply Of End Roof Assembly To Drg.no. 58116066 Alt "g" - 2 Nos. Special Condition : Suitable Packing To Be Done To Avoid Damage During Transit, Unloading And Rust Prevention During Storage.[safety Item ]
30 Oct 2025 (7 days left)
Refer doc
Tamil Nadu - Chennai
Refer doc
INTEGRAL COACH FACTORY
Supply Of Universal Testing Machine Electromechanical 20t Capacity As Per Detailed Technical Specification Enclosed
30 Oct 2025 (7 days left)
Refer doc
Multi State - Multi City
Refer doc
INTEGRAL COACH FACTORY
Supply Of Stainless Steel Battery Box
23 Oct 2025 (4 hours left)
Refer doc
Tamil Nadu - Chennai
Refer doc
INTEGRAL COACH FACTORY
Supply Of Switch Plate Assly Memu Ob 12 Ca
27 Oct 2025 (4 days left)
Refer doc
Tamil Nadu - Chennai
Refer doc
Select a tender
INTEGRAL COACH FACTORY Tenders
Access the latest Integral Coach Factory tenders through GeMTech Paras, your trusted platform for all ICF procurement opportunities. Whether you are interested in ICF Chennai tenders, railway coach manufacturing contracts, or related supply and service tenders, GeMTech Paras keeps you updated with real-time notifications and detailed tender information. Participate confidently in ICF eTender processes with our easy-to-use platform.