Filters
More filters
INTEGRAL COACH FACTORY
Showing 1 to 25 of 153 results for Integral Coach Factory Tenders
INTEGRAL COACH FACTORY
21 Oct 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of Integrated 60 Kva (55 Kva + 5 Kva) 750/415v & 190v, 3 Phase, Dry Type Distribution Transf Ormer To Rdso Spec.no.rdso/pe/spec/ac/0080-2007 (rev.3). Over All Dimensions, Construction And Mounting O F The 60kva Transformer Shall Conform To Rcf Drawing No.cc71524 Alt. Nil Or Latest And Terminal Board Of The 60kv A Transformer Shall Be As Per Rcf Drawing No.cc71525 Alt. A Or Latest. Note: Packing Instruction:pi146 [ Warra Nty Period: 30 Months After The Date Of Delivery ]

INTEGRAL COACH FACTORY
17 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Works Contract For Carrying Out Installation Of Aluminium Composite Panels And Mouldings In Railway Passenger Coaches.

INTEGRAL COACH FACTORY
25 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of 7 Ton Lifting Platform Electrically Operated

INTEGRAL COACH FACTORY
15 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Bogie Frame Assly (machined) For Air Spring In Secondary Suspension For Lhb Coaches T O Drg No:(a) 66703001, Col.i Alt.'c'--- (or) (b*) 834-0-3-002, Alt 'b' --- Suppliers Commitment Will Be There T O Supply As Per Drawing-(a) (for Lhb Non Ac Air Spring Coaches), Or As Per Drawing -(b)(for Lhb-ac Ai R Spring Coaches) *for Identification Purpose Of Bogie Frame, (i)drg (a) Shall Be Marked With Yellow Paint On Brake Beam End Face On Both Sides Of Bogie Frames And N227 Is To Be Punched In Letter Height Of 10mm After Year Or Availble Space On Other Location Of Bogie Number Plate, (ii)drg (b), A242 Is To Be Punched In Lett Er Height Of 10mm After Year Or Availble Space On Other Location Of Bogie Number Plate. The Ratio Of Supply Betw Een (a) & (b) Has To Be Confirmed Before The Issue Of Purchase Order. Rate Quoted Will Be Applicable To Both Drawing-(a) And Drawing-(b). Special Condition : The Material Specification For Plat Es Of Various Thickness Used For Fabrication Of Bogie Frame Will Be As Per En10025, Part-5, 2005 . Gr Ade S355 J2w+n ,in Lieu Of Earlier Specified Material Grade St 52.3 And S355 J2 G3 , En10025/29 In Vario Us Related Sub Assembly And Component Drawings And Specn.mdts-213, Rev-04 Or Latest And Mdts-16 6, Rev-02 Or Latest Shall Be Generally Followed. Time Lag Between Shot Blasting And Painting Shoul D Not Be More Than 30 Minutes In Any Case. Packing Condition As Per Document No.mpm0010 E Ver-6.0 Pi159 & Packing Condition As Per Drg.no. Icf/j&t/sk-1823. [ Warranty Period: 84 Months After The Date Of De Livery ]

INTEGRAL COACH FACTORY
22 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of 1.dome Cum Reservoir Assly.complete (l.h) For Fiat Bogie With Air Springs To Drg. No. 66 704005, Col.i, Alt. "a" = 2 Nos. 2.dome Cum Reservoir Assly.complete (r.h) For Fiat Bogie With Air Sprin Gs To Drg No. 66704011, Col.i, Alt. "a" = 2 Nos. Red Oxide Zinc Chromate Primer Only To Be Coated To S Pecification Is:2074 Of Thickness 15-20 Microns. Special Condition : Material Specn.no. En10025-5, 2004, S 355j2w+n To Be Used In Lieu Of En10025/29, S355j2g3 Wherever Mentioned In Detail Drawing. Suitable Packing To Be Done To Prevent Damage During Transit, Unloading And Rust Prevention During Stora Ge. Items Are To Be Packed In Set. [ Warranty Period: 72 Months After The Date Of Delivery ]

INTEGRAL COACH FACTORY
15 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of Unf 450 Litre Water Tank Rcf Lhb-eo

INTEGRAL COACH FACTORY
16 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of Crimpng Socket 150sqmm M16 Edts-200/it 1

INTEGRAL COACH FACTORY
17 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of Railway Carriage Fan 400mm Sweep

INTEGRAL COACH FACTORY
15 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of S & I Of Pressurized Flushing System

INTEGRAL COACH FACTORY
15 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of Steel Shots For Use In Foundries To Is 4606/83 (referred 2003) Amendments 1 Ss 710

INTEGRAL COACH FACTORY
17 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of Epdm For Trcc Cable Clamping Arrgt For Km

INTEGRAL COACH FACTORY
12 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of Unf Hose 42x5p, L=240mm

INTEGRAL COACH FACTORY
22 Sept 2025
Tamil Nadu - Tiruvallur
Refer doc
0

Supply Of Hiring The Services Of Material Handling Equipment Mhe Such As Diesel Operated Forklift Trucks And Jcb For Shell Depot" For A Period Of 180 Working Days

INTEGRAL COACH FACTORY
16 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of Unf Cable Through Bx-icf/sk3 7-1-103

INTEGRAL COACH FACTORY
19 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of Hydraulic Shearing, Punching And Cropping M/c Technical Specification No. Hydraulic Shearing, Punching & Cropping M/c/ Mech/icf/2023-24

INTEGRAL COACH FACTORY
12 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of Unf Set Of Battery Fuse Boxes-lhb Cs

INTEGRAL COACH FACTORY
12 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply And Installation Of Bio Retention.

INTEGRAL COACH FACTORY
16 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of Cnc Laser Cutting And Welding Machine As Per Attached Technical Specification No. Icf/m&p/20-21/1330/ Lcw Revision 03, Dt: 05.06.2025.

INTEGRAL COACH FACTORY
16 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of Terminal Board Assly Icf/sk3 76090 Col 3

INTEGRAL COACH FACTORY
15 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of S&i Of Zebra Strip Stickers

INTEGRAL COACH FACTORY
16 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of Unf C/s Of B/r Locks - Laccw

INTEGRAL COACH FACTORY
15 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of One Coach Set Of 120kn Air Spring Assembly

INTEGRAL COACH FACTORY
18 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of Center Pivot Assembly

INTEGRAL COACH FACTORY
25 Sept 2025
Tamil Nadu - Chennai
Refer doc
0

Supply Of Roof Mounted Ac Package Unit Rmpu Type-i For Lhb Eog Ac Coaches In Coach Set, Consisting Of Rmpu With R407-c Refrigerant -02 Nos. To The Rdso Specification No. Rdso/pe/spec/ac/0061-2005 Rev-1 And Microprocessor Controller Unit- 01 No. As Per The Rdso Specification No. Rdso/pe/spec/ac/0139-2009 Rev.1, Type # I Complete With Accessories As Per Scope Of Supply As Envisaged In The Rdso Specifications And Without Air Bellows (supply Air, Fresh Air And Return Air). Note: 1. Rdso Drawing No Rdso/pe/sk/ac/0069-2004, Rev-3 Or Latest Shall Be Followed. 2. Standardisation Of Location Of Ntc, Ohp & Esti Sensors Shall Be As Per Rdso Modification Sheet No Rdso/pe/ms/ac/0087 (rev-0)-2022. 3. Mounting Details For Rmpu Switch Panel Shall Be Provided As Per Drawing No.icf/sk3-7-2-062 Alt- A. 4. Differential Pressure Switch (dps) Based Heater Protection System For Rmpu Shall Be Provided As Per Rdsomodification Sheet No. Rdso/pe/ms/ac/0089 (rev-0)-2022. 5. Packing Instruction As Per Pi-026 Ver.1.0 [ Warranty Period: 30 Months After The Date Of Delivery ]

INTEGRAL COACH FACTORY
03 Nov 2025
Multi State - Multi City
Refer doc
0

Supply Of Supp Of Uf Cable Harn Ljscz

Select a tender

INTEGRAL COACH FACTORY Tenders

Access the latest Integral Coach Factory tenders through GeMTech Paras, your trusted platform for all ICF procurement opportunities. Whether you are interested in ICF Chennai tenders, railway coach manufacturing contracts, or related supply and service tenders, GeMTech Paras keeps you updated with real-time notifications and detailed tender information. Participate confidently in ICF eTender processes with our easy-to-use platform.