- Splitting
- Advisory Bank
- Reserved for MII
- Reserved for MSE
- Bid to RA Enabled
- Evaluation Method
- MSE Purchase Preference
- MSE Exemption
Splitting
Advisory Bank
Reserved for MII
Reserved for MSE
Bid to RA Enabled
Evaluation Method
MSE Purchase Preference
MSE Exemption
Showing 1 to 25 of 32 results for Krishna Bhagya Jala Nigam Limited Tenders
Krishna Bhagya Jala Nigam Limited
Improvements To Narayanpur Dam Internal Roads, Rectification Of Sunk Rip Rap Of Earthen Embakment Of Rbed & Dyke & Providing Parapet Wall On Lbed & Rbed Of Narayanpur Dam (package Iv) Under Drip-ii
Krishna Bhagya Jala Nigam Limited
Construction Of 1x17.5mva Standby Power Transformer Bay At 110/6.6kv Switch Yard And Allied Works Of Indi Lis(gutti Basavanna) Pump House( Kbjnl) At Kembhavi, Yadagiri Dist. With Five Years Maintenance At Indi Lis And Shifting Of 1x12.5mva 110/6.6kv Transformer Commissioning At Albc Head Work.
Krishna Bhagya Jala Nigam Limited
Ame For Water Management Of Tidagundi Branch Canal (from 17.43 To 40.00 Km) For Tank Filling Purpose For The Year 2025-26 (indent No.1807).
Krishna Bhagya Jala Nigam Limited
Ame For Water Management Of Malghan West Canal (from 0.00 To 118.56 Km) For Tank Filling Purpose For The Year 2025-26
Krishna Bhagya Jala Nigam Limited
Ame For Water Management Of Babaleshwar Branch Canal-1 & 2 (from 0.00 To 40.90 Km & From 0.00 To 4.16 Km) For Tank Filling Purpose For The Year 2025-26
Krishna Bhagya Jala Nigam Limited
Ame Of Water Management Of Managuli Branch Canal (from 0 To 32.16 Km)& Its Distributary Network For Tank Filling Purpose For The Year 2025-26.
Krishna Bhagya Jala Nigam Limited
Ame For Water Management Of West Canal From Ch 30.00 Km To 78.06 Km And Distributory 12 To 43 Under Mulwad Lis Stage-ii For The Year 2025-26.
Krishna Bhagya Jala Nigam Limited
Improvements To Special Repair Road At Ch 3.20 To 4.00 Km Of Lateral-21 Of Dy-11 Of Ibc
Krishna Bhagya Jala Nigam Limited
Repairs To Lining In Dy-51 And Its Laterals In Selected Reaches Of Ilc
Krishna Bhagya Jala Nigam Limited
Filling Of Murrum On Upstream Splayed Wing Wall Of Drops At Ch 19.00 Km And Repairs To Damged Portion Of Special Repair At Ch.19.00 To Tail End Of Distry No.13 Of Ibc
Krishna Bhagya Jala Nigam Limited
Removal Of Silt And Jungle Clearance Of Dy -1,2,3,4,5,6,7,8,9,10,11,12 And 13 And Its Laterals Of East Main Canal Of Ramthal (marol) Lis
Krishna Bhagya Jala Nigam Limited
Package Work Of (1) Overhauling & Servicing And Replacement Of Requisite Spare Parts Of 5 Nos Butterfly Valve And Actuators,gear Box At 1st Stage Headwork Of Ramthal (marol) Lis.(2) Overhauling & Servicing And Replacement Of Requisite Spare Parts Of 4 Nos Butterfly Valve And Actuators,gear Box At 2nd Stage Headwork Of Ramthal (marol) Lis, (3) Overhauling & Servicing And Replacement Of Requisite Spare Parts Of 5 Nos Non Return Valve Dia.1100 Mm At 1st Stage Headwork Of Ramthal (marol) Lis
Krishna Bhagya Jala Nigam Limited
Overhauling & Servicing And Replacement Of Requisite Spare Parts Of 4 Nos Non Return Valve Dia.900 Mm At 2nd Stage Headwork Of Ramthal (marol) Lis.
Krishna Bhagya Jala Nigam Limited
Replacement Of Burnt Potential Transformer(pt), Terminal Kit Arrangement At Motor No.2 And Servicing And Replacement Of Requisite Spares For Rtcc Panal In Oltc Of 9mva Transformer Under Herkal South Lis Headwork.
Krishna Bhagya Jala Nigam Limited
Providing Man Power To Electrical System (1-years) Maintenance Of Almatti Camp In Respect Of The Following Rr Number Aht-1 (colony And Buildings), Aht-2 (office Buildings), Aht-5 (dam Crest Gate Transformer), Aht-17 (rock Garden), And Ht-44 (krishna Garden And Sitimani Camp) At Almatti Dam Site. Ame For Electrical System For Residential And Non-residential Buildings, Including Md, Ce, Se Quaters In Almatti Dam Site Colony For The Year 2025-26
Krishna Bhagya Jala Nigam Limited
Removal Of Silt And Jungle Clearance Under West Main Canal Of Herkal South Lis
Krishna Bhagya Jala Nigam Limited
Removal Of Silt And Jungle Clearance Of Main Canal From Ch 40.000 To 58.000 Of Arbc
Krishna Bhagya Jala Nigam Limited
Restoration Of Pipe Culvert, Ctc And Lining Repair Work Of Lateral No -2.of Dy No - 10. Under Dc - 1 Of Tlis.
Krishna Bhagya Jala Nigam Limited
Removal Of Silt And Jungle From Km 11.00 To 22.00km (at Selected Reaches) And Its Distributaries Under Arbc.
Krishna Bhagya Jala Nigam Limited
Supplying And Fixing Of 3 Nos Lighting Arester ,serviceing Of 3 Nos Pt And 3 Nos Ct And 1 Nos 10 Mva Transformer Of 110/6.6 Kv Sub-station Of Ramathal (marol) 1st Stage Pump House
Krishna Bhagya Jala Nigam Limited
Overhauling, Servicing, And Replacement Of Requisite Spares For Pump No 5 And 6 At Herkal North Lis
Krishna Bhagya Jala Nigam Limited
Improvement Of Special Repair From Ch 5.00 To 7.5km Of Dy-15 Of Albc
Krishna Bhagya Jala Nigam Limited
Inspection And Submission Of Detailed Report For Motor No. 5 And 9 Of Chimmalagi Lift Irrigation Scheme Headwork.
Krishna Bhagya Jala Nigam Limited
Servicing, Overhauling And Replacing The Damage Spare Parts Of 50/5 Tonne Capacity Of Eot Crane At Albc Headwork Almatti Dam Site.
Krishna Bhagya Jala Nigam Limited
Desilting Of Intake Canal And Intake Approach Towards The Pump House Of Ramathal(marol) Ist Stage Pump House
Select a tender
Krishna Bhagya Jala Nigam Limited Tenders
GeMTech PARAS enables vendors to access KBJNL tenders, including water resources GeM projects, e-tender Karnataka notifications, and govt etender updates. Our service covers irrigation infrastructure contracts, water supply system tenders, and allied government procurement opportunities. With real-time alerts and detailed tender information, GeMTech PARAS streamlines participation in Krishna Bhagya Jala Nigam Limited’s procurement process, helping businesses maximize their potential in Karnataka’s vital irrigation and water resources sector.