We are not affiliated with, endorsed by, authorised by, or otherwise connected in any manner whatsoever with the Government e-Marketplace (GeM) or the Government of India. We provide independent advisory and consultancy services only and do not act as or represent ourselves as agents, representatives of any government authority or government entity or government company.

🔴  3 Metro Railway tenders closing in under 3 days — review & act now —  Review & act now
Metro Railway Tenders — Updated July 2026

Latest Metro Railway Tenders — Updated Daily

Metro Railway tenders include procurement for signaling systems, metro coaches, track laying, electrical works, and station development. These infrastructure projects are vital to India's urban transit growth and are hosted on GeM and national portals. GeMTech PARAS provides quick access to metro-specific tenders across major cities.
Read More

GeMTech PARAS aggregates live Metro Railway tenders in one searchable platform. Every active tender is indexed, filtered, and matched to your company profile automatically. Stop manually checking portals — let the data come to you.

100
Metro Railway Tenders Tracked
339+
Clients Across India
4.9
Google Rating
24hr
Response Turnaround
98%
Compliance Rate

    Metro Railway
    Showing 1 to 25 of 100 for Metro Railway Tenders
    Metro Railway
    Corrigendum : Supply Of "set Of Push Button Switches With 22.5mm Cut Out Dia, As Per Specification No. Mr/poh/e/t&c/001(rev-1), Drawing No. Mr/poh/7/5/0229-2 For Ac Rakes Of Kolkata Metro.nb: (1) One Set Consists Of 30nos. Green Colour Push Buttons, 34nos. Red Colour Push Buttons And 18nos. Yellow Colour Push Buttons. (2) 04nos. Push Button Switches Should Be Provided With 01no. Contact Element With Contact Configuration (1no. +1nc). (3) The Remaining Push Button Switches Should Be Provided With 01no. Contact Element With Contact Configuration 2no." As Per Drg.no. Drawing No .mr/poh/7/5/0229-2 Specn: As Per Specification No .mr/poh/e/t&c/001(rev-01), [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 31 Jul 2026 12:00 PM 4 days left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Supply Of Exide Battery 12v, 100ah, Lead Acid Storage Batteries Mode: Exide Xp1000 (100 Ah, 12 Volt) Or Similar For A Water Tender Fire Engine. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 30 Jul 2026 12:00 PM 3 days left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Supply Of Tab/cap Abiraterone 250 Mg [item Code M260904] ]
    End Date 31 Jul 2026 12:00 PM 4 days left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Supply Of Switch Piano Type 6a 220/250v, Is:3854/1997 Or Latest, Make:anchor/precision Electricals/wipro, North-west, Mk. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 31 Jul 2026 12:00 PM 4 days left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Manufacturing, Testing, Supply And Fitment Of Igbt Based Dc-dc Chopper Drive Based Propulsion System Including Camc For 05 Years After Expiry Of Warranty Period In Existing Bhel Rake No. Mr 301.
    End Date 30 Jul 2026 12:00 PM 3 days left
    Location Multi City, Multi State
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Corrigendum : Manufacturing, Testing, Supply And Fitment Of Igbt Based Dc-dc Chopper Drive Based Propulsion System Including Camc For 05 Years After Expiry Of Warranty Period In Existing Bhel Rake No. Mr 301.
    End Date 30 Jul 2026 12:00 PM 3 days left
    Location Multi City, Multi State
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Corrigendum : Electrical Energy Storage Solution (bess Cum Tess) In Metro Railway Kolkata
    End Date 31 Jul 2026 12:00 PM 4 days left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Supply Of Strap Hanger For Mr-400 Series Rakes Of Kolkata Metro Railway
    End Date 31 Jul 2026 12:00 PM 4 days left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Supply Of Set Of 110v, 300ah Vrla Battery .
    End Date 03 Aug 2026 12:00 PM 7 days left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Supply Of Inhibited Mineral Insulating Oil. Is:12463(1988) As Per Rdso Master List Of Approved Vendors No.el/m/0023 (ver.12) (jan-2011) Valid Till 30/06/11. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 03 Aug 2026 12:00 PM 7 days left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    22 hours left
    Supply Of Cut Resistant Hand Gloves Confirming To Dlw Specification Mp/safety/spec./ppe/24 (revision-14) Dated 20.08.2022. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 27 Jul 2026 12:00 PM 22 hours left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Supply Of Air Compressor With Motor As Per Kbi Model No. Vv120, Kb Part No. 8.120.2.321.108.9 Or Equivalent Kb Part No. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 03 Aug 2026 12:00 PM 7 days left
    Location Murshidabad, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    1 day left
    Supply Of Network Video Recorder For Mr-400 Series Rakes As Per Metro Railway's Drawing No. Mr/poh/sk-0360 With 2tb Hdd And 32 Gb Sd Card. 01 Set Consists Of 01 Number Network Video Recorder For Mr-400 Series Rakes, 01 Number 2tb Hdd And 01 Number 32 Gb Sd Card. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 28 Jul 2026 12:00 PM 1 day left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Through Erc Renewal In Up & Dn Line From Knap (incl) Km (-)02/11 To Kcen (incl) Km 07/14 Of Metro Railway, Kolkata.
    End Date 31 Jul 2026 12:00 PM 4 days left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Augmentation Of Tetra System For Green, Purple & Orange Line Of Metro Railway, Kolkata.
    End Date 31 Jul 2026 12:00 PM 4 days left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Supply Of Trimetazidine Mr 35 Mg Tablet ]
    End Date 10 Aug 2026 12:00 PM 14 days left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Supply Of Set Of Delivery Valves For V V 120 Compressor. 1. Delivery Valve L.p.stage Part No 8.120.0461. 003.6 For 2 No 2. Delivery Valve H.p.stage Part No 8.120.0.48.004.6 For 1 No. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 10 Aug 2026 12:00 PM 14 days left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Supply Of Tab Empagliflozin 10 Mg ]
    End Date 10 Aug 2026 12:00 PM 14 days left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    22 hours left
    Corrigendum : Supply Of Locking Plate For Vsa Bracket As Per Icf Drawing No. Mrb/dmc-0-4-018, Item No. 1 [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 27 Jul 2026 12:00 PM 22 hours left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Supply Of Sertraline 50 Mg Tab/cap [ Item Code M120415 ] ]
    End Date 10 Aug 2026 12:00 PM 14 days left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Supply Of Baclofen 10mg Tab/cap ]
    End Date 10 Aug 2026 12:00 PM 14 days left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Supply Of Punched Washer For 28mm Dia Anchor Stud Bolts For M1a Assembly As Per Drg No. Mrc/w/pw/17-93 And As Per Specification Atatched [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 13 Aug 2026 12:00 PM 17 days left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Supply Of Galvanized Anchor Stud Blot Of Length 262 Mm And Dia 28 Mm With Nut For M1a Assembly As Per Drg No Mrc/w/pw/2-97 (type-a) [ Warranty Period: 30 Months After The Date Of Delivery ]]
    End Date 12 Aug 2026 12:00 PM 16 days left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Supply Of Standard Nylon Ferrule For M1a Assembly As Per Drg. No. - Mrc/w/pw/16-93 [ Warranty Period: 30 Months After The Date Of Delivery ] ]
    End Date 12 Aug 2026 12:00 PM 16 days left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Metro Railway
    Supply Of Triple Coil Spring Washer For 28 Mm Dia Anchor Stud Blots For M1a Assembly In Ballast Less Track As Per Drg No:- Mrc/w/pw/15-93. [ Warranty Period: 30 Months After The Date Of Delivery ]]
    End Date 12 Aug 2026 12:00 PM 16 days left
    Location Kolkata, West Bengal
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc

    Select a tender to view details

    The Problem

    Why Metro Railway Tenders Get Rejected at the Technical Stage

    These are the most common rejection reasons our team sees — all 100% avoidable with the right support.

    Documentation Errors
    Incorrect formats or missing mandatory certificates often lead to rejection.
    Submission Delays
    Waiting until the last minute often leads to technical glitches & failure.
    The Solution

    Everything You Need to Win Metro Railway Tenders — In One Platform

    End-to-end bid support from documentation to order confirmation.

    📁
    Documentation Support
    We prepare your complete technical & financial bid folders — rejection-proof.
    • EMD / Bank Guarantee preparation
    • QR certificate compilation & verification
    • MAF & OEM authorization letters
    💻
    Portal Management
    End-to-end bid submission so you never miss a deadline.
    • Bid submission on portal
    • Document upload & correct tagging
    • Deadline alerts & reminders
    🤝
    Post-Bid Support
    We stay with you from submission to order confirmation.
    • Technical Query (TQ) response
    • Evaluation stage liaisoning
    • LOI / Work Order follow-up
    Our Process

    How It Works — 4 Simple Steps

    1
    Eligibility Check
    WhatsApp company profile, AI checks QR fit within 2 hours
    2
    Document Review
    we audit existing documents against tender requirements
    3
    Bid Preparation
    we prepare all technical & financial folders, 100% compliant
    4
    Submit & Win
    submission supported through evaluation
    FREE DOWNLOAD
    Metro Railway Tender Checklist:
    10 Must-Have Documents
    The exact checklist our team uses for every Metro Railway bid — never get rejected for a missing document.
    FAQ

    Frequently Asked Questions about Metro Railway Bidding

    How to register as a vendor for Metro Railway?

    Submit the required registration form along with your company registration documents, GST certificate, PAN, and relevant experience certificates on the Metro Railway vendor portal. You'll also need to clear a financial assessment. GeMTech PARAS manages the entire empanelment process — contact us for a free eligibility assessment.

    What is the EMD requirement for Metro Railway tenders?

    EMD is typically 2–3% of the estimated tender value, submitted as a Bank Guarantee (BG) from a scheduled commercial bank. The bank branch and BG format must be pre-approved. Submitting a DD or an incorrect BG format is the single most common rejection reason. The exact amount and format are always specified in the NIT — we verify this for every bid we manage.

    Chat with a Metro Railway tender Expert