🔴  3 Modern Coach Factory Raebareli tenders closing in under 3 days — review & act now —  Review & act now
Modern Coach Factory Raebareli Tenders — Updated April 2026

Latest Modern Coach Factory Raebareli Tenders — Updated Daily

GeMTech PARAS offers streamlined access to MCF Raebareli tenders for vendors seeking railway-related procurement opportunities. Our portal covers everything from manufacturing tenders and e-tender Uttar Pradesh updates to specific listings like railway coach GeM bids. As a central hub for govt etender announcements, we help suppliers navigate the Modern Coach Factory Raebareli tender ecosystem with real-time alerts and support, empowering businesses to bid confidently and compliantly.
Read More

GeMTech PARAS aggregates live Modern Coach Factory Raebareli tenders in one searchable platform. Every active tender is indexed, filtered, and matched to your company profile automatically. Stop manually checking portals — let the data come to you.

111
Modern Coach Factory Raebareli Tenders Tracked
390+
Clients Across India
4.9
Google Rating
24hr
Response Turnaround
98%
Compliance Rate

    Modern Coach Factory Raebareli
    Showing 1 to 25 of 111 for Modern Coach Factory Raebareli Tenders
    Modern Coach Factory Raebareli
    Comprehensive Annual Maintenance Contract Of Transport Vehicles With Frozen Items For A Period Of Two Years At Modern Coach Factory Through Open Tender.
    End Date 04 May 2026 12:00 PM 4 days left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    One hour left
    Provision Of 20 Kld Effluent Treatment Plant (etp) At Hospital In Mcf/rbl
    End Date 30 Apr 2026 12:00 PM One hour left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    One hour left
    Supply Of Flushing Pump (dcw-p03) For Direct Cooling Water System Of Wtp Area, General Arrangement As Per Drawing Number T25234 And Specification As Per Revised Annexure-1. Make- Warman/mesto/creative Engineers/grundfos/kirlosker Brother Ltd/ksb [ Warranty Period: 12 Months After The Date Of Delivery ]
    End Date 30 Apr 2026 12:00 PM One hour left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    One hour left
    Work For Cleaning Of Tank, Repairing And Replacement Of Old Fins Of Cutting Bed Of 02 Nos. Underwater Plasma Machine, 01 No. Cnc Pro Annual Rate Contract Oxy Acetylene, 01 No. Cnc Pro Annual Rate Contract Oxy Profile And 01 No. Cnc Pro Annual Rate Contract Air Plasma Cutting Machine Installed In Bogie Shop Through Open Tender For Two Years.
    End Date 30 Apr 2026 12:00 PM One hour left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    One hour left
    Supply Of One Coach Set Of Vinyl Coated Upholstery Fabric Of Width 1270mm(minimum) In Continuous Roll Length Of 30 Metres (minimum) To Spec. Rdso/2008/cg-07, Rev01 Or Latest For Lws/pp2 Coaches.the Excess Length Shall Be Multiple Of 05 Metres Andmaximum Length Of 40 Metres. Requirements And Colour Scheme Of Upholstery Shall Be As Per Mcf Design Ln. Rbl-md46685/colour Scheme Dt.24.02.2026: Onyx Black (ral 0002500)one Coach Requirment - 170 Mtrs Upholstery Sample To Be Submitted To Icf Design For Approval Along With Test Certificates. [ Warranty Period: 54 Months After The Date Of Delivery ]
    End Date 30 Apr 2026 12:00 PM One hour left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    One hour left
    Supply Of Set Of Couplings As Per Annexure C [ Warranty Period: 12 Months After The Date Of Delivery ]
    End Date 30 Apr 2026 12:00 PM One hour left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    One hour left
    Supply Of Hose Connection For Brake Cylinders 500 Mm Long. As Per Annexure:-m-100/mcf/rbl/hc/bc/assly-01. [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 30 Apr 2026 12:00 PM One hour left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    Supply Of Set Of Window Inner Frame For Lhb Scn Amrit Bharat Coaches, As Per Drawing: Mplwclscnabx Version 3, Packing Instruction: Pi042 Ver1.0 [ Warranty Period: 30 Months Afterthe Date Of Delivery ]
    End Date 05 May 2026 12:00 PM 5 days left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    Corrigendum : Supply Of Hex Head Screw M8x30 Stainless Steel As Per Drg.no. . Is: 1364 (part-2): 2023, A2-70 To Is: 1367 (part 14 / Sec-1): 2023, Ce, Packing Instruction - Pi042, Ver.-1. [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 07 May 2026 12:00 PM 7 days left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    One hour left
    Work Of Parting, Milling And Drilling Operation On Aluminium Extrusion For Curtain Arrangement For Lhb Type Lwaccn/ Lwaccw/ Lwfcwac/ Lwfac Coaches As Per Scope Of Work.
    End Date 30 Apr 2026 12:00 PM One hour left
    Location RaeBareli, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    Supply Of Saw Metal Scrap Container, As Per Drawing No. T25242 & T25073 [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 04 May 2026 12:00 PM 4 days left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    1 day left
    Corrigendum : Supply Of Seamless Stainless Steel Pipe Size 25mm (1") Nb X 3800 Mm As Per Drg.no. Astm-a312, Schedule 40s, Grade Tp-304(seamless) & Identification Marking As Per Sme/dev. L No.-md46131 Dated 03-05-2006, Packing Instruction - Spi042(r) [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 01 May 2026 12:00 PM 1 day left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    One hour left
    Corrigendum : Supply Of Round Strand Rope Of Dia 6x19+wsc Din 3060 And 65 Metre Galvanized With Thimble Eye Of M10 At One End [ Warranty Period: 12 Months After The Date Of Delivery ]
    End Date 30 Apr 2026 12:00 PM One hour left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    One hour left
    Relining Of Top Two Layers Of Hearth Of Rhf And Relining Of Roof Of Zones 4 & 5 Of Rotary Hearth Furnace In Forged Wheel Plant, Raebareli As Per Scope Of Work.
    End Date 30 Apr 2026 12:00 PM One hour left
    Location RaeBareli, Uttar Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    Corrigendum : Annual Maintenance Contract Of Bolster Machining Centre 1 & 2 (tos Kurim) For 02 Years Through Open Tender.
    End Date 08 May 2026 12:00 PM 8 days left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    Corrigendum : Comprehensive Annual Maintenance Contract (including Spare Parts) Of 275 Nos. Co2 Mig Welding Machines For 02 Years.
    End Date 08 May 2026 12:00 PM 8 days left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    One hour left
    Corrigendum : Supply Of Hinge Complete As Per Drg.no. 3 10113.0.21.530.110 Alt Ar, Packing Instruction - Pi013 Ver.0. ]
    End Date 30 Apr 2026 12:00 PM One hour left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    Corrigendum : Supply Of Set Of Fittings & Sleeves Of Hoses As Per Annexure 'a' ,(01 Set Consisting Of 118 Items) [ Warranty Period: 12 Months After The Date Of Delivery ]
    End Date 05 May 2026 12:00 PM 5 days left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    Corrigendum : Supply Of Hex Nut M30 High Tensile As Per Drg. No. Is: 1364 (part-3)-2018, With Property%a0class-10 To Is: 1367 (part-6)-2025, Coating As Per Mdts-057, Packing Instruction - Pi042 (ver. 01). [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 04 May 2026 12:00 PM 4 days left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    Supply Of Hex Head Bolt M10x75 Stainless Steel, As Per Drg.no.is: 1364 (part-1): 2023 & Is: 1367 (part-14) : 2023, Packing Instruction - Spi042 [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 07 May 2026 12:00 PM 7 days left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    Supply Of Set Of Composite Pipe & Fitting For Lhb Scn Eog Coaches
    End Date 04 May 2026 12:00 PM 4 days left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    Corrigendum : Supply Of Double Ended Open End Spanner Set Consists Of 12 Items Maketaparia/deneer/stanley/blue Point/venus Or Equivelent. Each Set Must Consist Of 8x9, 10x11, 12x13, 14x15, 16x17, 18x19, 20x22, 21x23, 24x26, 25x28, 30x32, 36x40 Quantity Should Be One Noof Each Tool In Every Set. [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 07 May 2026 12:00 PM 7 days left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    Corrigendum : Supply Of Double Ended Ring Spanners Set Consisting Of 12 Pieces In Each Set. Sizes (6x7, 8x9, 10x11, 12x13,14x15, 16x17, 18x19, 20x22, 21x23, 24x27, 25x28, 30x32) Make: Taparia/jhalani/stanley Or Any Similar Make. [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 07 May 2026 12:00 PM 7 days left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    Corrigendum : Supply Of Pilz Make Light Curtains, Part No 632230-sb000054208 & 632230-sb000012029 (sender & Receiver). [ Warranty Period: 12 Months After The Date Of Delivery ]
    End Date 05 May 2026 12:00 PM 5 days left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    Modern Coach Factory Raebareli
    1 day left
    Corrigendum : Supply Of Set Of Moulding For Water Tank Flap (acp) For Amrit Bharat Coaches As Per Drawing: Mplwtfpp Version 1, Packing Instruction No. Pi140 Ver1.0 [ Warranty Period: 30 Months After The Date Of Delivery ]
    End Date 01 May 2026 12:00 PM 1 day left
    Location BARELI, Madhya Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc

    Select a tender to view details

    The Problem

    Why Modern Coach Factory Raebareli Tenders Get Rejected at the Technical Stage

    These are the most common rejection reasons our team sees — all 100% avoidable with the right support.

    Documentation Errors
    Incorrect formats or missing mandatory certificates often lead to rejection.
    Submission Delays
    Waiting until the last minute often leads to technical glitches & failure.
    The Solution

    Everything You Need to Win Modern Coach Factory Raebareli Tenders — In One Platform

    End-to-end bid support from documentation to order confirmation.

    📁
    Documentation Support
    We prepare your complete technical & financial bid folders — rejection-proof.
    • EMD / Bank Guarantee preparation
    • QR certificate compilation & verification
    • MAF & OEM authorization letters
    💻
    Portal Management
    End-to-end bid submission so you never miss a deadline.
    • Bid submission on portal
    • Document upload & correct tagging
    • Deadline alerts & reminders
    🤝
    Post-Bid Support
    We stay with you from submission to order confirmation.
    • Technical Query (TQ) response
    • Evaluation stage liaisoning
    • LOI / Work Order follow-up
    Our Process

    How It Works — 4 Simple Steps

    1
    Eligibility Check
    WhatsApp company profile, AI checks QR fit within 2 hours
    2
    Document Review
    we audit existing documents against tender requirements
    3
    Bid Preparation
    we prepare all technical & financial folders, 100% compliant
    4
    Submit & Win
    submission supported through evaluation
    FREE DOWNLOAD
    Modern Coach Factory Raebareli Tender Checklist:
    10 Must-Have Documents
    The exact checklist our team uses for every Modern Coach Factory Raebareli bid — never get rejected for a missing document.
    FAQ

    Frequently Asked Questions about Modern Coach Factory Raebareli Bidding

    How to register as a vendor for Modern Coach Factory Raebareli?

    Submit the required registration form along with your company registration documents, GST certificate, PAN, and relevant experience certificates on the Modern Coach Factory Raebareli vendor portal. You'll also need to clear a financial assessment. GeMTech PARAS manages the entire empanelment process — contact us for a free eligibility assessment.

    What is the EMD requirement for Modern Coach Factory Raebareli tenders?

    EMD is typically 2–3% of the estimated tender value, submitted as a Bank Guarantee (BG) from a scheduled commercial bank. The bank branch and BG format must be pre-approved. Submitting a DD or an incorrect BG format is the single most common rejection reason. The exact amount and format are always specified in the NIT — we verify this for every bid we manage.

    Chat with a Modern Coach Factory Raebareli tender Expert