- Splitting
- Advisory Bank
- Reserved for MII
- Reserved for MSE
- Bid to RA Enabled
- Evaluation Method
- MSE Purchase Preference
- MSE Exemption
Splitting
Advisory Bank
Reserved for MII
Reserved for MSE
Bid to RA Enabled
Evaluation Method
MSE Purchase Preference
MSE Exemption
Showing 1 to 25 of 189 results for Modern Coach Factory Raebareli Tenders
Modern Coach Factory Raebareli
Supply Of 60 Kva Transformer 750v/415v,3-phase,4 Wire,vector Configuration-star-sta R As Per Specification No. Rdso/pe/spec/ac/0080 -2007 (rev-2), Packing Instruction - Spi146 [ Warra Nty Period: 30 Months After The Date Of Delivery ]
Modern Coach Factory Raebareli
Supply Of Capacitor Bank For Lhb Eog Type Power Car As Per Specification No. Edml130, Re V-1, Corr 1 To 6, Type-ii. Packing Instruction - Spi146. [ Warranty Period: 30 Months After The Date Of Delivery ]
Modern Coach Factory Raebareli
Supply Of Set Of Floor Plate For Lhb Power Car Eog Coaches, As Per Drawing: Mplalfplwlrrm Version 6 Packing Instruction - Pi042 Ver1.0. [ Warranty Period: 30 Months After The Date Of Delivery ]
Modern Coach Factory Raebareli
Supply Of Battery Box Mounting
Modern Coach Factory Raebareli
Supply Of 70ah, 110v, Vrla Maintenance Free Mono Block Battery Set (with 9 Modules Of 12v Each), Factory Precharged As Per Spec. No. Rdso/pe/spec/ac/0009-2014, Rev-2. Packing Instruction - Spi182 [ Warranty Period: 30 Months After The Date Of Delivery ]
Modern Coach Factory Raebareli
Self-priming Monoblock Pump Assly. With Controller As Per Spec No. Edts186, Rev-a, Am- 1 & 2, Cor-1& 2, Annexure-1 And Sr. No.2 Of Clause 4.0 Of Specification (scope Of Supply) F Or Hardware, Supply As Per Sr. No. 7 Of Rdso Annexure-a To Mc/ctrb/genl, Dated 10.12.2024. Packing Instruction - Spi146. [ Warranty Period: 30 Months After The Date Of Delivery ]
Modern Coach Factory Raebareli
Supply Of Harness Of Underframe And Roof Arrangement For Lhb Ac 2 Tier Type Coaches
Modern Coach Factory Raebareli
Under Frame Complete For 3ph Memu/dmc Coaches Welded & Fitted Along Wi Th Supporting Members Above Trough Floor To Drawing Number: 74511001 Alt 'k' , Sched Ule Of Technical Requirement As Per Icf/md/specn.147 Rev-02 With Amendment-01. Special Condition: 1) Packing Instruction:s/ Mcf Pi042 Uf Ver. 0. 2)the Underframe Should Be Supp Lied As Normal Side Up And Side Bearer Side Down. 3) Free Supply Item I.e. Bearing Bracket With Lower/upper Bush Shall Be Collected From Mcf/rbl. 4) Firm Shall Confirm A Nd Obtain The Exact Drawings To Be Followed From Mcf/raebareli Before Start Of Manu Facturing. [safety Item ]
Modern Coach Factory Raebareli
Supply Of Snack Table (colour Shade Blue) For Lhb Ac2t & Ac3t Coaches As Per Drawin G No.lw64218 Alt-h,packing Instruction - Pi-012. [ Warranty Period: 84 Months After The Date Of Deli Very ]
Modern Coach Factory Raebareli
Supply Of Set Of Items For G02 Tool For Wdc Machine (operation: - Internal Threading) As Per Speci Fication No. Fwp/machining/wdc/g02 (except Para 3 Of Note) Of Make : Kennametal/sandvik/iscar/wa Lter/mitsubishi/motherson [ Warranty Period: 30 Months After The Date Of Delivery ]
Modern Coach Factory Raebareli
Supply Of 95 Sq Mm (black) Thin Walled Flex
Modern Coach Factory Raebareli
Supply Of Stainless Steel Wire 1.2 Mm In Barrel Of Weight 100 Kg 125 Kg For Sis Korea Robotic We Lding Machine. Residual Life 12 Months From The Date Of Receipt In Mcf/rbl. As Per Drg.no. Make- Ven Us/ Uniweld/ Nevatia/ Ador/ Bansal Wire. Specn: Mig S.s. Welding Wire Conforming To Din 8556 1.4316 [ Warranty Period: 30 Months After The Date Of Delivery ]
Modern Coach Factory Raebareli
Supply Of Train Set Kit Items For Body Shell And Partition Frames Of Ts/mc Coaches To Drawing Numbers: I) 89010003 Alt J - 1no (all Items To Be Loose Supplied) Ii) 89010002 Alt C-1 No. (a Ll Items To Be Loose Supplied) Iii) 72710036 Alt F -1 No. (all Items To Be Loose Supplied) Iv) Aah10645 A Lt A - 4 Nos. V) Aac 10789 Alt Nil - 60 Nos. Vi) Aac16040 Alt B - 6 Nos. Vii) Aae10812 Alt.nil - 4 Nos Viii) 72710059 Alt Nil - 2 Nos Ix) Aa H1 10710 Alt B - 2 Nos X) Aah110679 Alt B - 2 Nos Special Cond Itions : A) There May Be Minor, Modification In Design, Suppliers To Confirm The Exact Dra Wings From Mcf Before Manufacture B) Suitable Packing To Be Done To Prevent Transit Damage (safety Item ]
Modern Coach Factory Raebareli
Supply Of Side Wall Sheeting Arrangement For Lws (eog) Coach With Wider Window. As Per Drg.no. Lg14292 Alt-a. Packing Instruction: S/mcf Pi030-a Ver.0. [ Warranty Period: 84 Months After The Date Of Delivery ]
Modern Coach Factory Raebareli
Supply Of Connection Sheet (crf) As Per Drg.no. Mle11111, Alt-nil, Packing Instruction: Pi04 2 Ver. 1.0. [ Warranty Period: 84 Months After The Date Of Delivery ]
Modern Coach Factory Raebareli
Supply Of Diamonds Rollers Sn Process. As Per Annexure: - Bogie-ns/ws/dr/sn/process/2022-2 3/1. [ Warranty Period: 12 Months After The Date Of Delivery ]
Modern Coach Factory Raebareli
Supply Of Front Part Complete To Be Mask
Modern Coach Factory Raebareli
Supply Of Integrated 60 Kva (55 Kva+5 Kva) Transformer As Per Rdso Specification No.rdso/pe/ Spec/ac/0080-2007 Rev-3. Packing Instruction - Spi146. [ Warranty Period: 30 Months After The Dat E Of Delivery ]
Modern Coach Factory Raebareli
Supply Of Pin Bracket For Bogie Body Connection As Per Drawing No. Lw04114 Alt-d. Packin G Instruction -spi001 [ Warranty Period: 30 Months After The Date Of Delivery ]
Modern Coach Factory Raebareli
Supply Testing And Commissioning (include All Connections & Dressing Without Loading) Switch Board Cabinet For Lhb Eog Ac Coaches As Per Specification No. Rdso/pe/spec/ac/0184-2015, Rev-1 With (i) Mpcb For Water Pump 1&2, Condenser & Ventilation Fan Motors Shall Be Provided As Per Rdso Letter No. El/7.1.108/sbc Dated 01.05.2023 And No. El/7.1.108/sbc/main Dated 10.06.2025. (ii) Provision Of 2a Mcb For Fsds As Per Rdso Letter No. El/6.8.21 Dated 18.07.2024. (iii) Cable Color Codi Ng Of 110v/24v Dc As Per Rdso Letter No. El/7.1.108/sbc/main Dated 26.07.2024 . (iv) Revised Locati On Of Aerosol Based Fire Detection Cum Suppression System As Per Rdso Letter No. El/7.1.108/mssbc Dated 18.06.2025. (v) Provision Of Mcb As Per Rdso Modification Sheet No. Rdso/pe/ms/ac/0094-202 4, Rev-0 & Rdso/pe/ms/ac/0095-2024, Rev-0. (vi) Polyamide Flexible Corrugated For Sbc As Per Rcf S Ked 861, Alt-a And (vii) Additional One Set Of Rc Filters Shall Be Provided In The Sbc For 190 V Secondar Y Circuit Of 60 Kva (55+5) Transformer To Bom Sr.no.12 Of Specification No. Rdso/pe/spec/ac/0184-2 015, Rev-1. Packing Instruction - Spi146. [ Warranty Period: 30 Months After The Date Of Delivery ]
Modern Coach Factory Raebareli
Supply Of Fire Extinguisher (dcp Type) With Anti-theft Arrangement As Per Mdts 46270 Rev-03 Wit H Powder Based Abc Type, Capacity 6 Kg, Fire Rating 3a(89b) For Non Ac Coaches, Drawing No. Cc6400 4 Alt-b, Colour As Per Clause No. 10.1 Of Is:15683:2018. Packing Instruction:pi100 Ver.-01 [ Warranty Period: 84 Months After The Date Of Delivery ]
Modern Coach Factory Raebareli
Supply Of Window Glass For Fixed Window As Per Drg.no. Lw54104 Alt- G And Mdts 089 Rev- 4 Is Applicable, Packing Condition Pi137 Ver. 2.0. [ Warranty Period: 30 Months After The Date O F Delivery ]
Modern Coach Factory Raebareli
Supply Of Wash Basin Complete For Disabled Lavatory For Lhb Slr Hog Coaches (31 Sea Ter) As Per Drg.no. Lr63303 Alt Nil,packing Instruction:pi042 Ver-1.0 [ Warranty Period: 30 Month S After The Date Of Delivery ]
Modern Coach Factory Raebareli
Supply Of Lavatory Door Arrangement For Handicapped For Lhb Dslr Underslung Pow Er Pack Coaches As Per Drg.no. Lr56113 Alt-b, Colour Shade To Follow As Per Mcf Design Letter No. Rbl-md46271 (part-1), Dated - 22.05.2024.packing Instruction - Pi120 Ver-3.0. [ Warranty Period: 7 8 Months After The Date Of Delivery ]
Modern Coach Factory Raebareli
Supply Of Kit Of Side Wall Of Lws (eog) Coach With Wider Window For Shop Made And B Ought Out Items Except Side Wall Skin Panels And Crf Items I.e. Carlines And Roof Flange . As Per Planning Set List No: Mp19swallsblws Version 5. Packing Instruction: Pi042 Ver 1. 0- Including 10 Set Of All Loose Material Should Be Packed As Single Unit As Per Standard Packing. [ Wa Rranty Period: 84 Months After The Date Of Delivery ]
Select a tender
Modern Coach Factory Raebareli Tenders
GeMTech PARAS offers streamlined access to MCF Raebareli tenders for vendors seeking railway-related procurement opportunities. Our portal covers everything from manufacturing tenders and e-tender Uttar Pradesh updates to specific listings like railway coach GeM bids. As a central hub for govt etender announcements, we help suppliers navigate the Modern Coach Factory Raebareli tender ecosystem with real-time alerts and support, empowering businesses to bid confidently and compliantly.