Filters
More filters
Modern Coach Factory Raebareli
Showing 1 to 25 of 306 results for Modern Coach Factory Raebareli Tenders
Modern Coach Factory Raebareli
13 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of Led Light Fitting For Night Light With Berth Indication For Ac/non Ac Coaches As Per Spec.no. Rdso/pe/spec/tl/0091-2016, Rev.-1 With Rcf Annexure-1, 2 & 3 And Drg. No. Icf/std/7-6-053, Col-vi, Type-e (1 Watt). Packing Instruction - Spi149. [ Warranty Period: 72 M Onths After The Date Of Delivery ]

Modern Coach Factory Raebareli
26 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of 70ah, 110v, Vrla Maintenance Free Mono Block Battery Set (with 9 Modules Of 12v Each), Factory Precharged As Per Spec. No. Rdso/pe/spec/ac/0009-2014, Rev-2. Packing Instruction - Spi182 [ Warranty Period: 30 Months After The Date Of Delivery ]

Modern Coach Factory Raebareli
05 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of Set Of Cage Clamp Terminals With Glass Fuses For Lhb Eog Ac-3 Tier Coaches . As Per Specn: Edml-230, Rev-nil, Table-1. Packing Instruction - Spi208 [ Warranty Period: 30 Mont Hs After The Date Of Delivery ]

Modern Coach Factory Raebareli
05 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of Pvc Flooring Roll 2x1850x14000mm, Colour As Per Sample No. Ac-flg-01 As Pe R Drg/spec.no. Rdso/2006/cg-12 Revision 1 With Amendment-5 With Pvc Welding Electrode D Ia 4mm=9mtrs Per Roll, Packing Instruction - Pi163 Ver 1.0 [ Warranty Period: 84 Months After Th E Date Of Delivery ]

Modern Coach Factory Raebareli
05 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Frp Lavatory Module For Lwsczac Shall Be As Per Rcf Specification Mdts-214, Rev-12 With Addendum (vide Rcf Letter No. Md46111, Dated 16.04.2024) & Corrigendum (vide Rcf Letter No. Md46111,dated 18.04.2024) Along With Modification Advice As Per Mcf Design Letter No. Rbl- Md461 18, Dated 18.12.2024 (the Supply Of Frp Lavatory Module Shall Be Done In Knockdown Condition, Whic H Can Be Fully Assembled Inside The Coach. Design Of Frp Lavatory Modules Will Be In 03 Pieces Similar To Non-ac Coaches And Overall Height Of Lavatory Module May Be 2115 +/- 10 Mm. Height Of Lavatory Module Shall Be Minimized From Top Of The Lavatory Module Only With Reference To Applicable Lavatory Module Drawings). Note: Interior Color Scheme Of Lavatory Module Shall Be Ensure As Per Letter No. Mt- 31,dated 21.06.2001. Packing Instruction:spi111 [ Warranty Period: 78 Months After The Date Of Deli Very ]

Modern Coach Factory Raebareli
05 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of Double Inlet Centrifugal Blower Assembly Complete With Mounting Bracket S. As Per Specification No. Edts 331 ,rev-a,type-1 With Mcf/rbl Corrigendum-1. Packing Instruction - Spi215. [ Warranty Period: 30 Months After The Date Of Delivery ]

Modern Coach Factory Raebareli
27 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of 60 Kva Transformer 750v/415v,3-phase,4 Wire,vector Configuration-star-sta R As Per Specification No. Rdso/pe/spec/ac/0080 -2007 (rev-2), Packing Instruction - Spi146 [ Warra Nty Period: 30 Months After The Date Of Delivery ]

Modern Coach Factory Raebareli
06 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of Led Light Fitting For Reading Light Two Seater For Lhb Eog Ac Chair Car Coa Ches, As Per Spec :rdso/pe/spec/tl/0091-2016,rev-1 And Drg No. Lw76102,type-q1,(2w) With Rcf Annexure 1, 2 & 3. Packing Instruction - Spi149. [ Warranty Period: 72 Months After The Date Of Deliv Ery ]

Modern Coach Factory Raebareli
19 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of Led Light Fitting For Doorway/gangway Area For Lhb Type Ac Coaches "type-n" (9watt) As Per Specification.no. Rdso/pe/spec/tl/0091-2016, Rev-1 As Per Drawing Lw 76099 With Rcf Anne Xure 1,2 & 3. Packing Instruction - Spi149. [ Warranty Period: 72 Months After The Date Of Delivery ]

Modern Coach Factory Raebareli
02 Sept 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of Capacitor Bank For Lhb Eog Type Power Car As Per Specification No. Edml130, Re V-1, Corr 1 To 6, Type-ii. Packing Instruction - Spi146. [ Warranty Period: 30 Months After The Date Of Delivery ]

Modern Coach Factory Raebareli
28 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of Led Light Fitting With Night Light (corridore Area ) For Ac Coaches As Per Spec.no. Rds O/pe/spec/tl/0091-2016, Rev-1 As Per Drawing Lw 76091 Type "m" (9 Watt + 1 Watt) With Rcf Annex Ure 1,2 &3. Packing Instruction - Spi149. [ Warranty Period: 72 Months After The Date Of Delivery ]

Modern Coach Factory Raebareli
07 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply, Installation, Commissioning & Pr [supply, Installation, Commissioning & Proving Out Of Skin Tensioning Equipment As Per Attached Specification No. Mcf/m&p/lsg/skin Tensioning/24-25 ]

Modern Coach Factory Raebareli
13 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Corrigendum : Supply, Testing And Commissioning (including All Connection & Dressing Without Loading ) Set Of Panels For Lhb Eog Non Ac Coaches As Per Specification No. Edts 355, Rev-1, Am-1 To 6 [without Item S.n. 8 (lower Cable Cover) And S.n. 9 (upper Cable Cover) Of Drg. No. Cc72081, Alt-a ]

Modern Coach Factory Raebareli
13 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of 1, Hex Head Bolt M16x130 High Tensile (33672416)

Modern Coach Factory Raebareli
19 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of Compartment Door (with Grill) For Ac Sleeper Coach.

Modern Coach Factory Raebareli
26 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of Set Of Floor Plate For Lhb Power Car Eog Coaches, As Per Drawing: Mplalfplwlrrm Version 6 Packing Instruction - Pi042 Ver1.0. [ Warranty Period: 30 Months After The Date Of Delivery ]

Modern Coach Factory Raebareli
28 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of Jumper Cable Support Link Assembly (stainless Steel) As Per Drawing No. Lwscwac/eo G-7-1-006/col I, Alt-a. Packing Instruction : Spi220 [ Warranty Period: 30 Months After The Date Of D Elivery ]

Modern Coach Factory Raebareli
16 Sept 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of Battery Box Mounting

Modern Coach Factory Raebareli
04 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of Compreg Plywood 12x1220x3000mm (both Side Plain), As Per Drawing: Rdso Spe C C-9407 Type Ii Rev.3 With Amendment Slip No.4 Of July 2019. Packing Instructions:pi119 Version 3.0 [ Warranty Period: 84 Months After The Date Of Delivery ]

Modern Coach Factory Raebareli
05 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of One Coach Set Of Partition Frames And Body Shell Items For Memu/tc6 3-pha Se Coaches To Drawing Numbers:- A) 747-1-0-007, Alt C = 2 Nos. B) 747-1-0-021,alt Nil= 1 No. C) 747-1-0-018, Alt Nil = 2 Nos. D) 747-1-0-019, Alt Nil = 2 Nos. E) 747-1-0-020, Alt A = 2 Nos. F) Aaa-1-0- 278, Alt Nil = 8 Nos. Special Condition: 1) Packing Instruction: Mcf Pi032 Ver.0. 2) Firm Shall Confirm A Nd Obtain The Exact Drawing To Be Followed From Mcf/raebareli Before Start Of Manufacturing. (safety Item) [ Warranty Period: 96 Months After The Date Of Delivery ]

Modern Coach Factory Raebareli
12 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply, Installation And Commissioning & Maintenance Of Automatic Fire Detection Cum Suppression System (high Pressure Water Mist System) For Lhb Power Car And Pantry Car Coaches As P Er Rdso Spec. No. Is/rdso/cg/s/22001 Along With Amendment -1 Issued Vide Rdso Letter No. Mc/ac F/fire Supprn/pc Dated 09.09.2024.packing Instruction:pi042 Ver-1.0 [ Warranty Period: 48 Months After The Date Of Delivery ]

Modern Coach Factory Raebareli
13 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of Flat Connectoing (with Wago Terminals Blocks) As Per Drg.no. Edml-027 (sr. N O.-1 To 7), Packing Instruction - Pi042 Ver1.0. [ Warranty Period: 30 Months After The Date Of Deliver Y ]

Modern Coach Factory Raebareli
26 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of Led Light Fitting For Slr And Power Car Coaches (9 Watt) As Per Specification No. Rdso/ Pe/spec/tl/0091-2016 (rev-1) With Rcf Annx- 1, 2 & 3, Type-j1 And Drawing No.cc76457, Alt 'a', She Et 1 Of 2. Packing Instruction - Spi149. [ Warranty Period: 72 Months After The Date Of Delivery ]

Modern Coach Factory Raebareli
28 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply Of Emergency Feed Terminal Board As Per Drawing No. Cc75082,alt-b Packing Instruction S Pi205. [ Warranty Period: 30 Months After The Date Of Delivery ]

Modern Coach Factory Raebareli
20 Aug 2025
Madhya Pradesh - BARELI
Refer doc
0

Supply & Installation Of Frp Modular Toilet For Lhb Scn Coaches As Per Mdts-214 Rev-1 2 With Addendum As Per L. No. Md46111 Dated 16.04.2024 And Corrigendum-1 As Per L. No. Md46111 Dated 18.04.2024, Along With Modifications As Per Letter No. Rbl-md 46118 Dated 18.12.2024, With V Acuum Bagging /vartm Process Complying With En 45545-2, Hl-3. Mdts-44376 Rev. 01 To Be Follo Wed In Place Of Mdts-133 Rev-05. Colour Shade Shall Be As Per L. No. Rbl-md46271 (part 1) Dt. 22.0 5.2024. Frp Components As Per Rcf Spec. No. Mdts43373 Rev-1 And Fire Retardant Rigid Foa M As Per Rcf Spec. No. Mdts44374 Rev-0 ((note:-the Supply Of Lavatory Module Is To Be Don E In Knockdown Condition Which Can Be Fully Assembled Inside The Coach (no. Of Pieces Of Lavatory Module May Be Increased Up To 4 Maximum)which Can Be Fully Assembled Insi De The Coach). Packing Instruction:spi111. [ Warranty Period: 78 Months After The Date Of Delivery ]

Select a tender

Modern Coach Factory Raebareli Tenders

GeMTech PARAS offers streamlined access to MCF Raebareli tenders for vendors seeking railway-related procurement opportunities. Our portal covers everything from manufacturing tenders and e-tender Uttar Pradesh updates to specific listings like railway coach GeM bids. As a central hub for govt etender announcements, we help suppliers navigate the Modern Coach Factory Raebareli tender ecosystem with real-time alerts and support, empowering businesses to bid confidently and compliantly.