🔴  3 MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY tenders closing in under 3 days — review & act now —  Review & act now
MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY Tenders — Updated April 2026

Latest MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY Tenders — Updated Daily

Access MMRDA tenders on GeMTech PARAS for urban infrastructure and planning projects across Mumbai. Listings on e-tender Maharashtra and GeM include metro construction, road works, smart mobility solutions, housing, and IT integration. Civil contractors, EPC companies, and technology vendors can explore MMRDA’s govt etenders for participation in Mumbai’s expansive development initiatives.
Read More

GeMTech PARAS aggregates live MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY tenders in one searchable platform. Every active tender is indexed, filtered, and matched to your company profile automatically. Stop manually checking portals — let the data come to you.

24
MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY Tenders Tracked
444+
Clients Across India
4.9
Google Rating
24hr
Response Turnaround
98%
Compliance Rate

    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Showing 1 to 24 of 24 for Mumbai Metropolitan Region Development Authority Tenders
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Provision Of Outsourced Manpower Of Fire Supervisor, Junior Safety Supervisors And Points Man At Existing And Upcoming Metro Lines Of Mmmocl
    End Date 07 May 2026 12:00 PM 10 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 2.06 Cr
    Amount: ₹ 2.06 Cr
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Providing, Supplying, And Carrying Out Rectification Of Ground Seepage And Raising Of Floor Level At Store No. 6 And Roadwork Of The Main Entry Ramp At, Wadala Depot.
    End Date 04 May 2026 12:00 PM 7 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 28.5 L
    Amount: ₹ 28.5 L
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Provision Of Skilled Manpower For The It Division Of Mmmocl For Metro Line 2b For A Period Of Three (3) Years.
    End Date 04 May 2026 12:00 PM 7 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 5.06 Cr
    Amount: ₹ 5.06 Cr
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Three Year Rate Contract For Diesel Generator Stack Emission Testing For Metro Lines 2a, 2b, 7 And 9 Stations, Monorail Stations, And Depots At Charkop, Mandale And Wadala.
    End Date 06 May 2026 12:00 PM 9 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 7.37 L
    Amount: ₹ 7.37 L
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    18 hours left
    Regarding The Empanelment Of Architects And Urban Designers. Mmrda Is Inviting Online
    End Date 27 Apr 2026 12:00 PM 18 hours left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    18 hours left
    Expression Of Interest For Empanelment Of Student Architects / Urban Designers, Fresh Architects / Urban Designers And Emerging Design Firms For Providing Architectural & Urban Design Services
    End Date 27 Apr 2026 12:00 PM 18 hours left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Appointment Of Expert Consultants For Preparation Peer Review Of Techno Economic Feasibility Study Revision Of Project Report Carrying Out Various Surveys For Preparation Of Dpr Estimates Bid Documents Along With Bid Process Management For Ml 14
    End Date 05 May 2026 12:00 PM 8 days left
    Location Badlapur, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Design, Manufacture, Supply, Installation, Testing And Commissioning Of Signage, Graphics And Station Elements For 14 Elevated Stations (13 Stations Of Metro Line 6) And Airport Colony Station (1 Station) Of Metro Line 7a Of Mmrda
    End Date 04 May 2026 12:00 PM 7 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 31.3 Cr
    Amount: ₹ 31.3 Cr
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Design, Manufacture, Supply, Installation, Testing And Commissioning Of Station Element, Signage And Graphics For 13 Elevated Stations Of Line 2b (d. N. Nagar To Mandale) Of Mumbai Metro Rail Project Of Mmrda.
    End Date 04 May 2026 12:00 PM 7 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 29.72 Cr
    Amount: ₹ 29.72 Cr
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Design, Supply, Installation, Testing, Commissioning Of Ballastless Trackwork Part(i) Main Line From Itoto Chemburof Ml2b Elevated Corridor And Part (ii) Mainline From Airport Colonystationto Csmi Airport Underground Portio
    End Date 06 May 2026 12:00 PM 9 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 98.5 Cr
    Amount: ₹ 98.5 Cr
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Corrigendum : Design, Manufacture, Supply, Installation, Integration, Testing And Commissioning Of Afc System Incl 5 Years Of Cm After 2 Years Of Dlmp For Mml6 Swami Samarth Nagar To Vikhroli Eeh Of Mumbai Metro Rail Project Of Mmrda - DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, INTEGRATION, TESTING AND COMMISSIONING OF AUTOMATIC FARE COLLECTION SYSTEM INCLUDING 5 YEARS OF COMPREHENSIVE MAINTENANCE AFTER 2 YEARS OF DEFECT LIABILITY MAINTENANCE PERIOD FOR MUMBAI METRO LINE 6 [SWAMI SAMARTH NAGAR TO VIKHROLI (EEH)] OF MUMBAI METRO RAIL PROJECT OF MMRDA
    End Date 05 May 2026 12:00 PM 8 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 103 Cr
    Amount: ₹ 103 Cr
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    18 hours left
    Design, Manufacture, Supply, Installation, Testing And Commissioning Of Signage, Graphics And Station Furniture For 6 Elevated Stations Of Metro Line 5 Corridor Thane-bhiwandi-kalyan Of Mumbai Metro Rail Project Of Mmrda
    End Date 27 Apr 2026 12:00 PM 18 hours left
    Location Thane, Maharashtra
    Department Refer doc
    Amount ₹ 11.56 Cr
    Amount: ₹ 11.56 Cr
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    1 day left
    Corrigendum : Comprehensive Annual Maintenance Contract (camc) For Door Frame Metal Detectors (dfmd) For A Period Of Three (3) Years At Maha Mumbai Metro Operation Corporation Limited (mmmocl), Line 2a And 7 Phase I Metro Stations
    End Date 28 Apr 2026 12:00 PM 1 day left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 32.97 L
    Amount: ₹ 32.97 L
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    1 day left
    Corrigendum : Tender For Provision Of Assistant Section Engineers For Working On S And T System Provided In Mumbai Metro Lines 2a And 7 For An Initial Period Of Three Years
    End Date 28 Apr 2026 12:00 PM 1 day left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 3.08 Cr
    Amount: ₹ 3.08 Cr
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Three Year Contract For Hiring Of Calibration Service For The Measuring Tools And Instruments Rolling Stock Maintenance, Charkop And Mandale Depot
    End Date 20 May 2026 12:00 PM 23 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 43.4 L
    Amount: ₹ 43.4 L
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Providing, Fabricating And Installation Of Roof Gutters By Removing Existing Roof Gutters Of Mumbai Monorails Stations
    End Date 20 May 2026 12:00 PM 23 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 1.22 Cr
    Amount: ₹ 1.22 Cr
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    18 hours left
    Auction Sale Of Others - E-auction For Disposal Of Cardboard "as Ls Where Ls Basis"
    End Date 27 Apr 2026 12:00 PM 18 hours left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Protection And Maintenance Of Trees And Removal Of Dead And Dangerous Trees Branches From Mmrda Roads In Bkc (2026-2027)
    End Date 04 May 2026 12:00 PM 7 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 84.58 L
    Amount: ₹ 84.58 L
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Shifting Of Best Utility Along With Electricity Meter For Construction Of Worli-sewree Connector
    End Date 30 Apr 2026 12:00 PM 3 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 10.21 L
    Amount: ₹ 10.21 L
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Providing And Installation Of Passenger Lifts, Electrical Installations, Water Pump And Fire Fighting Etc. At Building No.4 (wing-d,e,f,g), Hdil, Kurla Premier, Kirol, Kurla (w).
    End Date 30 Apr 2026 12:00 PM 3 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 3.67 Cr
    Amount: ₹ 3.67 Cr
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Providing And Installation Of Passenger Lifts, Electrical Installations, Water Pump And Fire Fighting Etc. At Building No.4 (wing-abc), Hdil, Kurla Premier, Kirol, Kurla (w).
    End Date 30 Apr 2026 12:00 PM 3 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 4.37 Cr
    Amount: ₹ 4.37 Cr
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Corrigendum : Appointment Of General Consultant Gc For Civil Works Of Metro Line 5a Durgadi To Kalyan With Spur To Ulhasnagar
    End Date 15 May 2026 12:00 PM 18 days left
    Location Kalyan, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Providing Annual Maintenance Of Electrical Installation In Mnps, Dharavi
    End Date 04 May 2026 12:00 PM 7 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 5.51 L
    Amount: ₹ 5.51 L
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Providing Minor Repair Works To 2 Nos. Of Auto Lifts In Hubtown Building No.3 (gplus27 Floor), Vartak Nagar, Thane
    End Date 04 May 2026 12:00 PM 7 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 20.92 L
    Amount: ₹ 20.92 L

    Select a tender to view details

    The Problem

    Why MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY Tenders Get Rejected at the Technical Stage

    These are the most common rejection reasons our team sees — all 100% avoidable with the right support.

    Documentation Errors
    Incorrect formats or missing mandatory certificates often lead to rejection.
    Submission Delays
    Waiting until the last minute often leads to technical glitches & failure.
    The Solution

    Everything You Need to Win MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY Tenders — In One Platform

    End-to-end bid support from documentation to order confirmation.

    📁
    Documentation Support
    We prepare your complete technical & financial bid folders — rejection-proof.
    • EMD / Bank Guarantee preparation
    • QR certificate compilation & verification
    • MAF & OEM authorization letters
    💻
    Portal Management
    End-to-end bid submission so you never miss a deadline.
    • Bid submission on portal
    • Document upload & correct tagging
    • Deadline alerts & reminders
    🤝
    Post-Bid Support
    We stay with you from submission to order confirmation.
    • Technical Query (TQ) response
    • Evaluation stage liaisoning
    • LOI / Work Order follow-up
    Our Process

    How It Works — 4 Simple Steps

    1
    Eligibility Check
    WhatsApp company profile, AI checks QR fit within 2 hours
    2
    Document Review
    we audit existing documents against tender requirements
    3
    Bid Preparation
    we prepare all technical & financial folders, 100% compliant
    4
    Submit & Win
    submission supported through evaluation
    FREE DOWNLOAD
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY Tender Checklist:
    10 Must-Have Documents
    The exact checklist our team uses for every MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY bid — never get rejected for a missing document.
    FAQ

    Frequently Asked Questions about MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY Bidding

    How to register as a vendor for MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY?

    Submit the required registration form along with your company registration documents, GST certificate, PAN, and relevant experience certificates on the MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY vendor portal. You'll also need to clear a financial assessment. GeMTech PARAS manages the entire empanelment process — contact us for a free eligibility assessment.

    What is the EMD requirement for MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY tenders?

    EMD is typically 2–3% of the estimated tender value, submitted as a Bank Guarantee (BG) from a scheduled commercial bank. The bank branch and BG format must be pre-approved. Submitting a DD or an incorrect BG format is the single most common rejection reason. The exact amount and format are always specified in the NIT — we verify this for every bid we manage.

    Chat with a MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY tender Expert