🔴  2 MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY tenders closing in under 3 days —  Review & act now
MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY Tenders — Updated April 2026

Latest MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY Tenders — Live Updated Daily

Access MMRDA tenders on GeMTech PARAS for urban infrastructure and planning projects across Mumbai. Listings on e-tender Maharashtra and GeM include metro construction, road works, smart mobility solutions, housing, and IT integration. Civil contractors, EPC companies, and technology vendors can explore MMRDA’s govt etenders for participation in Mumbai’s expansive development initiatives.

GeMTech PARAS aggregates live MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY tenders in one searchable platform. Every active tender is indexed, filtered, and matched to your company profile automatically. Stop manually checking portals — let the data come to you.

500+ — MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY Tenders Tracked
300+ Clients
4.9★ Google Rating
24hr Response
98% Compliance
300+
Clients Across India
4.9
Google Rating
24hr
Response Turnaround
98%
Compliance Rate

    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Showing 1 to 25 of 25 for Mumbai Metropolitan Region Development Authority Tenders
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    1 day left
    Improvement Of Dasturi-matheran Pathways With Beautification Phase Ii
    End Date 08 Apr 2026 12:00 PM 1 day left
    Location Raigad, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Expired Today
    To Carry Out Incomplete Damaged Civil Repair Works In Residential Tenements Water Supply Lines Soil Waste Rainwater Down Take Pipes Waterproofing Treatment To Terrace Ugwt Ohwt Improvement Of Sewer Lines And Miscellaneous Works At Hdil Building No 4 - To Carry out incomplete / damaged civil repair works in Residential Tenements, Water Supply Lines, Soil waste / Rainwater down take pipes, Waterproofing treatment to terrace, UGWT, OHWT, Improvement of sewer lines and miscellaneous works at HDIL Building No.4, Kurla Premier, Kirol Road, Kurla (W).
    End Date Expired
    Location Kurla, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    20 hours left
    Corrigendum : Construction Of Shahad Railway Over Bridge On Central Railway Line Under Extd Muip
    End Date 07 Apr 2026 12:00 PM 20 hours left
    Location Thane, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Design, Manufacture, Supply, Installation, Integration, Testing And Commissioning Of Afc System Incl 5 Years Of Cm After 2 Years Of Dlmp For Mml6 Swami Samarth Nagar To Vikhroli Eeh Of Mumbai Metro Rail Project Of Mmrda
    End Date 15 Apr 2026 12:00 PM 8 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 103 Cr
    Amount: ₹ 103 Cr
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Expired Today
    Construction Of Internal Road At Hdil Premier Compound Kirol Road Kirol Village Kurla W
    End Date Expired
    Location Kurla, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Expired Today
    Construction Of Internal S W Drain Culverts And Sewer Line At Hdil Premier Compound Kirol Road Kirol Village Kurla West
    End Date Expired
    Location Kurla, Maharashtra
    Department Refer doc
    Amount ₹ 15.91 Cr
    Amount: ₹ 15.91 Cr
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Hiring Of Truck Mounted Hydraulic Elevated Platform Tmhp On Shift Basis For Inspections And Maintenance Of Structures/ Viaducts Of Metro Line 2a, Line 7 And Charkop Metro Depot.
    End Date 18 Apr 2026 12:00 PM 11 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 67.52 L
    Amount: ₹ 67.52 L
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Corrigendum : Comprehensive Annual Maintenance Contract (camc) For Door Frame Metal Detectors (dfmd) For A Period Of Three (3) Years At Maha Mumbai Metro Operation Corporation Limited (mmmocl), Line 2a And 7 Phase I Metro Stations
    End Date 18 Apr 2026 12:00 PM 11 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 32.97 L
    Amount: ₹ 32.97 L
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Corrigendum : Tender For Provision Of Assistant Section Engineers For Working On S And T System Provided In Mumbai Metro Lines 2a And 7 For An Initial Period Of Three Years
    End Date 18 Apr 2026 12:00 PM 11 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 3.08 Cr
    Amount: ₹ 3.08 Cr
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Corrigendum : Invitation Of Expression Of Interest Expression of Interest From Banks Fis For Providing Long Term Loan Of Rs. 10100 Crore For The Project Saket To Amane And Construction Of Flyover From Shilphata Junction Kalyan Ranjnoli Junction Bhiwandi
    End Date 24 Apr 2026 12:00 PM 17 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Appointment Of Consultant For Carrying Out Feasibility Preparation Of Dpr And Bid Process Management For Construction Of Rob Connecting Barrage Road At Badlapur West To Hopeline Power House Badlapur East Crossing Railway Line In Kbmc Area
    End Date 17 Apr 2026 12:00 PM 10 days left
    Location Badlapur, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Corrigendum : Grant Of Permission To Display Advertisement On Mthl Toll Plaza Utilities Hoardings Kiosks Across Mthl Project Atal Setu For A Period Of 10 Years On Dbmot Basis.
    End Date 15 Apr 2026 12:00 PM 8 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    1 day left
    Corrigendum : Licensing Of Two 50 Mm Dia Duct Space For Optical Fiber Cable Installation And Operations Rights For Commercial Use At Atal Setu
    End Date 08 Apr 2026 12:00 PM 1 day left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    1 day left
    Corrigendum : Procurement Of Air Spring Liners (shim) For Secondary Suspension Height Adjustment.
    End Date 08 Apr 2026 12:00 PM 1 day left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 7.65 L
    Amount: ₹ 7.65 L
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Invitation Of Expression Of Interest Expression of Interest From Banks Financial Institutions For Providing Long Term Loan Of Rs 14100 Cr For The Project Metro Line 10 Gaimukh To Shivaji Chowk Mira Road And Metro Line 12 Kalyan Taloja
    End Date 22 Apr 2026 12:00 PM 15 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Corrigendum : Outsourcing Of Usfd Testing Of At Welds At Nominated Sections Of Line 2a, Line 2b (phase I), Line 7 And Line 9 (phase I) Including Charkop And Mandale Depot For Three Years
    End Date 15 Apr 2026 12:00 PM 8 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 14.3 L
    Amount: ₹ 14.3 L
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Expired Today
    Providing Repairs To 8 Nos. Lifts Gplus12 Floor, Electric Installation, Water Pumps And Fire Fighting System In Building No.8, Wing D, E, F, G At Hdil, Kirol, Kurla West
    End Date Expired
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 2.3 Cr
    Amount: ₹ 2.3 Cr
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Expired Today
    Providing Repairs To 6 Nos Lifts Gplus12 Floor Electric Installation Water Pumps And Fire Fighting System In Building No 8 Wing A B C At Hdil, Kirol Kurla West
    End Date Expired
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 2.03 Cr
    Amount: ₹ 2.03 Cr
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Regarding Entering Into An Annual Price Contract With The Supplier For Purchasing Toner/cartridges As Required For Pantum Company's Printers For Office Use.
    End Date 15 Apr 2026 12:00 PM 8 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    1 day left
    Auction Sale Of Metallic, Non-metallic - E-auction For Disposal Of Various Types Of Scrap On "as Is Where Is Basis"
    End Date 08 Apr 2026 12:00 PM 1 day left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Auction Sale Of Metallic, Non-metallic, Others - E-auction For Disposal Of Various Types Of Metal, Non-metal And Other Materials On "as Is Where Is Basis"
    End Date 11 Apr 2026 12:00 PM 4 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Regarding The Empanelment Of Architects And Urban Designers. Mmrda Is Inviting Online
    End Date 27 Apr 2026 12:00 PM 20 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Expression Of Interest For Empanelment Of Student Architects / Urban Designers, Fresh Architects / Urban Designers And Emerging Design Firms For Providing Architectural & Urban Design Services
    End Date 27 Apr 2026 12:00 PM 20 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Providing, Supplying, And Carrying Out Rectification Of Ground Seepage And Raising Of Floor Level At Store No. 6 And Roadwork Of The Main Entry Ramp At, Wadala Depot.
    End Date 04 May 2026 12:00 PM 27 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 28.5 L
    Amount: ₹ 28.5 L
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
    Provision Of Skilled Manpower For The It Division Of Mmmocl For Metro Line 2b For A Period Of Three (3) Years.
    End Date 04 May 2026 12:00 PM 27 days left
    Location Mumbai, Maharashtra
    Department Refer doc
    Amount ₹ 5.06 Cr
    Amount: ₹ 5.06 Cr

    Select a tender to view details

    The Problem

    Why MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY Tenders Get Rejected at the Technical Stage

    These are the most common rejection reasons our team sees — all 100% avoidable with the right support.

    Documentation Errors
    Incorrect formats or missing mandatory certificates often lead to rejection.
    Submission Delays
    Waiting until the last minute often leads to technical glitches & failure.
    The Solution

    Everything You Need to Win MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY Tenders — In One Platform

    End-to-end bid support from documentation to order confirmation.

    📁
    Documentation Support
    We prepare your complete technical & financial bid folders — rejection-proof.
    • EMD / Bank Guarantee preparation
    • QR certificate compilation & verification
    • MAF & OEM authorization letters
    💻
    Portal Management
    End-to-end bid submission so you never miss a deadline.
    • Bid submission on portal
    • Document upload & correct tagging
    • Deadline alerts & reminders
    🤝
    Post-Bid Support
    We stay with you from submission to order confirmation.
    • Technical Query (TQ) response
    • Evaluation stage liaisoning
    • LOI / Work Order follow-up
    Our Process

    How It Works — 4 Simple Steps

    1
    Free Eligibility Check
    WhatsApp company profile, AI checks QR fit within 2 hours
    2
    Document Review
    we audit existing documents against tender NIT requirements
    3
    Bid Preparation
    we prepare all technical & financial folders, 100% compliant
    4
    Submit & Win
    submission supported, liaisoning through evaluation
    FREE DOWNLOAD
    MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY Tender Checklist:
    10 Must-Have Documents
    The exact checklist our team uses for every MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY bid — never get rejected for a missing document.
    FAQ

    Frequently Asked Questions about MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY Bidding

    How to register as a vendor for MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY?

    Submit the required registration form along with your company registration documents, GST certificate, PAN, and relevant experience certificates on the MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY vendor portal. You'll also need to clear a financial assessment. GeMTech PARAS manages the entire empanelment process — contact us for a free eligibility assessment.

    What is the EMD requirement for MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY tenders?

    EMD is typically 2–3% of the estimated tender value, submitted as a Bank Guarantee (BG) from a scheduled commercial bank. The bank branch and BG format must be pre-approved. Submitting a DD or an incorrect BG format is the single most common rejection reason. The exact amount and format are always specified in the NIT — we verify this for every bid we manage.

    Chat with a MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY Expert