We are not affiliated with, endorsed by, authorised by, or otherwise connected in any manner whatsoever with the Government e-Marketplace (GeM) or the Government of India. We provide independent advisory and consultancy services only and do not act as or represent ourselves as agents, representatives of any government authority or government entity or government company.

🔴  3 National Highway Authority Of India tenders closing in under 3 days — review & act now —  Review & act now
NHAI Tenders — Updated March 2026

Latest NHAI Tenders — Live National Highway Tender Listings

GeMTech PARAS aggregates live NHAI tenders from National Highway Authority of India across all project corridors and regional offices. Our AI checks your eligibility for every nhai e tender instantly — and our expert team prepares your complete bid documentation for qualifying contracts.
Read More

Every active NHAI e tender — highway construction, maintenance, tolling, and consultancy — in one platform. AI eligibility before you bid.

335
National Highway Authority Of India Tenders Tracked
405+
Clients Across India
4.9
Google Rating
24hr
Response Turnaround
98%
Compliance Rate

    National Highway Authority Of India
    Showing 1 to 25 of 335 for National Highway Authority Of India Tenders
    National Highway Authority Of India
    Corrigendum : Construction Of 4l Gf Corridor Ghazipur Zamania Saiyad Raja Of Nh24 Old Nh97 With Extens. Up To Varanasi Ranchi Kolkata Corridor Km 0.000 To Km 51.850 Tl 51.850 Km In Uttar Pradesh On Ham Mode Pkg Ii
    End Date 21 Aug 2026 12:00 PM 45 days left
    Location Delhi, Delhi
    Department Refer doc
    Amount ₹ 2,176.23 Cr
    Amount: ₹ 2,176.23 Cr
    National Highway Authority Of India
    Corrigendum : Upgrad Of Exist. 4l Corridor From Km 71.000 From Purvanchal Expressway To Km 102.000 Start Of Ghazipur Zamania Saiyad Raja Sec Of Nh24 Tl 30 Km In Uttar Pradesh On Ham Mode Pkg I
    End Date 21 Aug 2026 12:00 PM 45 days left
    Location Delhi, Delhi
    Department Refer doc
    Amount ₹ 394.92 Cr
    Amount: ₹ 394.92 Cr
    National Highway Authority Of India
    1 day left
    Construction Of 6 Lane Viaduct And Service Road From Baikampady (km.365.200) To Kiocl Junction (km.368.275) Of Nh-66 In The State Of Karnataka On Epc Mode
    End Date 08 Jul 2026 12:00 PM 1 day left
    Location Delhi, Delhi
    Department Refer doc
    Amount ₹ 311.33 Cr
    Amount: ₹ 311.33 Cr
    National Highway Authority Of India
    Expired Today
    One Time Improvement Work On Bypassed Section Of Nh39 From Design Ch. Km 235.510 To Km 238.030 Left Out Portion Of Ramna Bypass From Design Ch. Km. 246.990 To Km. 253.170 Left Out Portion Of Nagar Untari Bypsss In The State Of Jharkhand
    End Date Expired
    Location Ranchi, Jharkhand
    Department Refer doc
    Amount ₹ 6.44 Cr
    Amount: ₹ 6.44 Cr
    National Highway Authority Of India
    Expired Today
    Develop Of 4l Badvel To Nellore Highway From Badvel Gopavaram Vill On Nh67 Ch.630.960 To Guruvindapudi Vill On Nh-16 Ch.739.094 In Andhra Pradesh On Build-operate-transfer (toll) Mode For A Total Length Of 108.134 Km
    End Date Expired
    Location Delhi, Delhi
    Department Refer doc
    Amount ₹ 3,352.83 Cr
    Amount: ₹ 3,352.83 Cr
    National Highway Authority Of India
    Construction Of 6 Lane Vup At Km. 317.430, Nagria Mod Shahjahanpur For Improvement Of Morth Identified Blackspot On Bareilly-sitapur Section Of Nh-30 (old Nh-24) From Km. 262.000 To 419.590 In The State Of Uttar Pradesh On Epc Mode
    End Date 13 Jul 2026 12:00 PM 6 days left
    Location Lucknow, Uttar Pradesh
    Department Refer doc
    Amount ₹ 44.7 Cr
    Amount: ₹ 44.7 Cr
    National Highway Authority Of India
    1 day left
    Develop Of 6l Access Controlled Greenfield Highway Starting From Junction With Nh60 At Adgaon Km. 138.00 To Ahilyanagar Km. 290.000 (ahilyanagar Bypass Pkg I)
    End Date 08 Jul 2026 12:00 PM 1 day left
    Location Delhi, Delhi
    Department Refer doc
    Amount ₹ 7,596.33 Cr
    Amount: ₹ 7,596.33 Cr
    National Highway Authority Of India
    23 hours left
    Develop. Of 6l Ac Gf Regional Expressway On Northern Side Of Hyderabad From Pragnapur Vill Design Ch82.000 To Tangad Palle Vill Design Ch160.000 For A Design L Of 78.000 Km In The State Of Telangana Under Nh(o) On Ham Pkgii
    End Date 07 Jul 2026 12:00 PM 23 hours left
    Location Delhi, Delhi
    Department Refer doc
    Amount ₹ 3,727.32 Cr
    Amount: ₹ 3,727.32 Cr
    National Highway Authority Of India
    23 hours left
    Devel. Of 6l Ac Gf Regional Expressway On Northern Side Of Hyderabad From Girmapur Vill Ch1.518 To Pragnapur Ch.82.000 For A Design Length Of 83.518 Km In Telangana Under Nh O On Hybrid Annuity Mode Pkg I
    End Date 07 Jul 2026 12:00 PM 23 hours left
    Location Delhi, Delhi
    Department Refer doc
    Amount ₹ 4,135.6 Cr
    Amount: ₹ 4,135.6 Cr
    National Highway Authority Of India
    Expired Today
    Consultancy Services For A E During Operation And Maintenance Period Rail Cum Road Bridge Across River Ganga At Munger Ghat Near Munger From Km. 0.00 (km. 74.7 Of Nh 80) To Km. 9.394 (start Point Of Rail Cum Road Viaduct) And Km. 0.75 (end Point Of Rail Cum Road Via
    End Date Expired
    Location Patna, Bihar
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    National Highway Authority Of India
    Rfp For Ie Services During Om For Supervision Of 4 Lane Access Control Of Khammam Devarapalle Inter Corridor Route Under Bharatmala Pariyojana From Km 105.236 Recherla To Km 162.126 Devarapalle In Ap On Ham Mode
    End Date 13 Jul 2026 12:00 PM 6 days left
    Location West Godavari, Andhra Pradesh
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    National Highway Authority Of India
    Rectification, Rehabilitation, And Reconstruction Works Of Distressed Re Walls And High Embankment Locations Of Sargaon Bilaspur Nh130 Based On The Geotechnical Expert Dr. Gv Rao Reports At The Risk And Cost Of The Epc Contractor, On Epc Mode
    End Date 13 Jul 2026 12:00 PM 6 days left
    Location Bilaspur, Chhattisgarh
    Department Refer doc
    Amount ₹ 65.23 Cr
    Amount: ₹ 65.23 Cr
    National Highway Authority Of India
    Request For Proposal (rfp) For Design Development Deployment And Maintenance Of Unified Nhai Atms Software
    End Date 13 Jul 2026 12:00 PM 6 days left
    Location Delhi, Delhi
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    National Highway Authority Of India
    Balance Work For Construction Of 8-lane Access-controlled Expressway From Km 128.0 To Km 154.6 Of Vadodara Mumbai Expressway (karvad To Jujuwa Section) In Gujarat On Epc Mode (pkg-ix)
    End Date 14 Jul 2026 12:00 PM 7 days left
    Location Delhi, Delhi
    Department Refer doc
    Amount ₹ 873.62 Cr
    Amount: ₹ 873.62 Cr
    National Highway Authority Of India
    Request For Proposal For Empanelment Of Transaction Advisory Services For Projects To Be Taken Up For Assets Monetization Through Toll Operate Transfer (tot) Mode
    End Date 13 Jul 2026 12:00 PM 6 days left
    Location Delhi, Delhi
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    National Highway Authority Of India
    Request For Proposal For Empanelment Of Transaction Advisory Services For Projects To Be Taken Up For Assets Monetization Through Infrastructure Investment Trust (invit) Mode
    End Date 13 Jul 2026 12:00 PM 6 days left
    Location Delhi, Delhi
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    National Highway Authority Of India
    2 days left
    Corrigendum : Ie Services For 4laning Of Jagtial-karimnagar Section Of Nh-563 From Jagtial Bypass Start At Design Ch.0.000 (ex.chainage 90-500 On Nh-63) To Design Ch.58.866 Km (ch.170.400 Km) At Karimnagar Bypass End (58.866 Km) To Be Executed On Bot Mode Nh O
    End Date 09 Jul 2026 12:00 PM 2 days left
    Location Delhi, Delhi
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    National Highway Authority Of India
    Corrigendum : Construction Of Grade Separators At Rabarika Chowkdi Kutiyana Bypass Near Vill. Mal Choliyana N Vup Near Kutiyana Vill Along With Standalone Service Road 2.20 Km On Porbanadar Jetpur Sec Of Nh27 In Gujarat
    End Date 18 Jul 2026 12:00 PM 11 days left
    Location Delhi, Delhi
    Department Refer doc
    Amount ₹ 123.55 Cr
    Amount: ₹ 123.55 Cr
    National Highway Authority Of India
    Construction Of 4 Lane Thiruvananthapuram Outer Ring Road (orr) From Navaikulam (ch. 0.000) To Vizhinjam (ch. 62.700) Section Of Nh 866 Design Length 62.7 Km In Kerala On Bot Mode
    End Date 06 Aug 2026 12:00 PM 30 days left
    Location Delhi, Delhi
    Department Refer doc
    Amount ₹ 8,004.72 Cr
    Amount: ₹ 8,004.72 Cr
    National Highway Authority Of India
    Upgradation N Strengthening Of Kamrej Chalthan Sec Of Nh48 From Km249.00 To Km 262.875 To 6l Divided Carriageway With Service Road On Both Sides L 13.875 Km In Gujarat On Epc Mode 2nd Call
    End Date 23 Jul 2026 12:00 PM 16 days left
    Location Delhi, Delhi
    Department Refer doc
    Amount ₹ 291.27 Cr
    Amount: ₹ 291.27 Cr
    National Highway Authority Of India
    Ie Services For Const Of New 4l Ac Coastal Highway From Rameshwar To Konark Km.0 To Km. 79.400 On Hybrid Annuity Mode In The State Of Odisha Pkg I
    End Date 13 Jul 2026 12:00 PM 6 days left
    Location Delhi, Delhi
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    National Highway Authority Of India
    Ie Services For Const Of New 2lane With Paved Shoulder Coastal Highway From Konark To Paradeep Km.79.400 To Km. 160.180 On Hybrid Annuity Mode In The State Of Odisha Pkg Ii
    End Date 13 Jul 2026 12:00 PM 6 days left
    Location Delhi, Delhi
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    National Highway Authority Of India
    Proposal For Initiation Of Dpr Study For 6laning Of Nagpur Amravati Section Of Nh 53 Old Nh 06 In The State Of Maharashtra.
    End Date 21 Jul 2026 12:00 PM 14 days left
    Location Delhi, Delhi
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    National Highway Authority Of India
    23 hours left
    Supply, Installation, Testing and Commissioning And Operation And Maintenance Of Ccms For Street Lighting On (i) Pipli-bhavnagar Section (l 33.303 Km) (ii) Bhavnagar-talaja-mahuva- Kagvadar-una-kodinar-veraval Including Kodinar Bypass Section Of Nh 8e (l 257.085 Km) Under Piu Bhavnagar On 5 Yr Contract Basis
    End Date 07 Jul 2026 12:00 PM 23 hours left
    Location Gandhinagar, Gujarat
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    National Highway Authority Of India
    1 day left
    Consultancy Services For Preparation Of Detailed Project Report For Sumbal Bandipora Gurez Stretch In The Ut Of J And K
    End Date 08 Jul 2026 12:00 PM 1 day left
    Location Delhi, Delhi
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc

    Select a tender to view details

    The Problem

    Why NHAI Tenders Get Rejected

    These are the most common rejection reasons our team sees — all 100% avoidable with the right support.

    📄
    NHAI Vendor Registration Missing
    Valid NHAI vendor registration or SAP code is a prerequisite — unregistered vendors are rejected before evaluation.
    📄
    Incorrect EMD Instrument
    EMD not submitted as a Bank Guarantee from an approved bank — NHAI rejects non-compliant instruments immediately.
    📄
    QR Threshold Not Met
    Annual turnover or similar work experience falling below the NIT-specified threshold — always verify QR before bidding.
    📄
    Missing Experience Certificate
    Similar work completion certificate not in NHAI's prescribed format or not covering the required period/value.
    📄
    Non-Compliant Bid Format
    Technical bid not formatted, indexed, and encrypted as per NHAI's standard tender conditions.
    📄
    Expired GST/PAN Documents
    GST registration or PAN card copies not current — ensure all statutory documents are valid at submission date.
    The Solution

    Everything You Need to Win NHAI Tenders

    End-to-end bid support from documentation to order confirmation.

    Documentation
    Complete NHAI bid documentation — vendor registration, EMD, QR certificates, and all compliance documents prepared by our team.
    AI Eligibility + Expert Docs
    AI checks your eligibility against NHAI tender criteria instantly — expert team handles document creation for qualifying bids.
    Post-Bid Support
    Post-bid support including TQ responses and liaisoning with NHAI procurement teams through evaluation and award.
    Our Process

    How It Works — 4 Simple Steps

    1
    Eligibility Check
    WhatsApp company profile, AI checks QR fit within 2 hours
    2
    Document Review
    we audit existing documents against tender requirements
    3
    Bid Preparation
    we prepare all technical & financial folders, 100% compliant
    4
    Submit & Win
    submission supported through evaluation
    FREE DOWNLOAD
    National Highway Authority Of India Tender Checklist:
    10 Must-Have Documents
    The exact checklist our team uses for every National Highway Authority Of India bid — never get rejected for a missing document.
    FAQ

    Frequently Asked Questions about National Highway Authority Of India Bidding

    GeMTech PARAS tracks all live NHAI tenders from the authority's regional offices and project directorates across India. Filter by project type (EPC, HAM, O&M), state, or value to find active nhai e tender listings.

    NHAI EPC/HAM tenders have strict eligibility criteria including: minimum net worth, annual turnover multiple of bid project cost, and similar work experience in highway construction. These vary by project size. Our AI checks all conditions against your financial profile.

    GeMTech PARAS monitors all NIT amendments, BOQ revisions, and deadline changes for active NHAI tenders. Instant alerts are sent for any changes on tenders you're tracking.

    EPC (Engineering Procurement Construction) contracts have full upfront payment from NHAI. HAM (Hybrid Annuity Model) contracts require the contractor to fund 40% of project cost, with NHAI paying the balance in annuity instalments. Eligibility criteria and net worth requirements differ significantly between the two.

    Chat with a National Highway Authority Of India tender Expert