Filters
More filters
North Frontier Railway
Showing 1 to 17 of 17 results for North Frontier Railway Tenders
North Frontier Railway
27 Aug 2025
Multi State - Multi City
Refer doc
0

Construction Of 2nd Rail Cum Road Bridge Over Riverbrahmaputra Including Viaduct, Retaining Walls,embankment And Minor Bridges Including Track Work,ohe Work, Signalling And Telecom Work,commissioning Of Stations And General Work Betweenagthori And Kamakhya Station From Km 393.980 To Km 401.120.

North Frontier Railway
22 Aug 2025
West Bengal - Balurghat
Refer doc
0

Civil Engineering Works, Electrification Works And Signalling Works Of New Single Broad Gauge Line In Kamarpara-hilli Section (length: 15.187 Km) In Connection With Construction Of Balurghat-hilli New Bg Railway Line Project Of Northeast Frontier Railway (construction On Epc Mode )

North Frontier Railway
04 Aug 2025
Bihar - Katihar
Refer doc
0

Corrigendum : Supply Of Elastic Rail Clip

North Frontier Railway
05 Aug 2025
Assam - Maligaon
Refer doc
0

Up-keeping Of One No. Passenger Elevator At Nilachal Rest House/con/n.f.rly. At Maligaon For The Period Of Three (3) Years. (say 1095 Days.)

North Frontier Railway
14 Aug 2025
West Bengal - Cooch Behar
Refer doc
0

Supply Of Mini Dcdp Box Containing 12 Numbers Of 24-40v/05 Amp Dc-dc Convertor Having Tech. Spe C. No. Rdso/spn/165/2023 Ver. 4.0 Amendt.-1 Or Latest. [ Warranty Period: 30 Months After The Date Of D Elivery ]

North Frontier Railway
04 Aug 2025
Multi State - Multi City
Refer doc
0

Supply Of Wall Scenery [ Warranty Period: 30 Months After The Date Of Delivery ]

North Frontier Railway
05 Aug 2025
Multi State - Multi City
Refer doc
0

Supply Of Banner Flag Red Terry Cotton To Size 1.50 Mtr. X 0.75 Mtr. With Folds On Bot H Sides For Inserting Handles Of 30 Mm Dia. To Is: 11248/1985 Or Latest [ Warranty Period: 30 Months After The Date Of Delivery ]

North Frontier Railway
05 Aug 2025
Multi State - Multi City
Refer doc
0

Supply, Installation And Testing Of Passenger Elevator Door Motor And Vvvf Drive Assembly A S Per Specification Of Motor Type: 3-phase Asynchronous Motor, Voltage: Ac 380 V Speed: Variable Controlle D By Vvvf Drive, Torque: Variable, Brake Voltage Control: Dc 24 V, Features Of Vvvf Drive Assembly: Perma Nent Magnet Variable Frequency & Voltage Regulation, Ac Variable Frequency Control Of Make: Kinetic Energ Y/schindler Or Similar Isi Approved Make. [ Warranty Period: 30 Months After The Date Of Delivery ]

North Frontier Railway
04 Aug 2025
West Bengal - Alipurduar
Refer doc
0

Supply Of Engineer Grade Retro Reflective Sheet Of 0.25 To 0.3 Mm Thickness.pressure Sensitive Type Confirming To Astm-d,4956 Of Size 305 X 290 Mm.colour.red. [ Warranty Peri Od: 30 Months After The Date Of Delivery ]

North Frontier Railway
04 Aug 2025
Bihar - Katihar
Refer doc
0

Supply Of Toe Load Measuring Device Electronic Should Be Capable For Measuring Toe Load Of Erc Mark 5 And Erc Mark 3 Both. Make Laxmi, Pie, Vandana Or Similar Rates Inclusive With Gst [ Warrant Y Period: 30 Months After The Date Of Delivery ]

North Frontier Railway
16 Aug 2025
Multi State - Multi City
Refer doc
0

Link Connectivity Of Scada From Station Optical Fiber Cable Room To Ssp Through Optical Fiber Cable And Quad/pijf Cables Which Includes Supply, Installation, Testing And Commissioning Of The System For Rhmp Ssp, Kwpr Sp, Lxmp Ssp, Bada Ssp And Kagj Tss.

North Frontier Railway
22 Aug 2025
Multi State - Multi City
Refer doc
0

Corrigendum : Conducting Final Location Survey (fls) For (i) New Bg Railway Line Projects(900.00km) & (ii) Gauge Conversion / Doubling / Third Line / 3rd & 4th Line (600.00km) Of Variousprojects In India, Nepal And Bangladesh With Geo-technical Investigation, Preparing Eirr, Epcdocument & Submission Of Dpr Etc. As Per Railway Board's Latest Guide Lines Complete In All Respect.

North Frontier Railway
19 Aug 2025
Multi State - Multi City
Refer doc
0

"design, Supply, Erection, Testing And Commissioning Of 25 Kv, 50 Hz, Single Phase, Ac, Electrification Work" For Leftover Work In Ghy-lmg Section (2.7 Tkm) Along With Modification Of Lmg/ssp, Cpk/ssp, Rectification Of Defects & Deficiencies In Ghy-lmg Section And Construction Of One Ohe Model Setup At Cpk Ohe And Psi Depot".

North Frontier Railway
22 Aug 2025
Multi State - Multi City
Refer doc
0

Conducting Final Location Survey (fls) For (i) New Bg Railway Line Projects(900.00km) & (ii) Gauge Conversion / Doubling / Third Line / 3rd & 4th Line (600.00km) Of Variousprojects In India, Nepal And Bangladesh With Geo-technical Investigation, Preparing Eirr, Epcdocument & Submission Of Dpr Etc. As Per Railway Board's Latest Guide Lines Complete In All Respect.

North Frontier Railway
10 Sept 2025
Assam - Guwahati
Refer doc
0

Appointment Of Authority Engineer For Providing Project Management Services For Engineering, Procurement And Construction (epc) Contracts & Other Works Contracts (item Rate Contracts) For Earthwork In Formation And In Cutting, Blanketing, Construction Of Rcc Box, Rcc & Pcc Drain, Retaining Wall, Toe Wall, Minor Bridges, 1 No.major Bridge,1 No Rob, Signalling & Telecom Works In Connection With Construction Of Third Line Between Kamakhya To Guwahati Of Northeast Frontier Railway In The State Of Assam.

North Frontier Railway
21 Aug 2025
Multi State - Multi City
Refer doc
0

Supply, Installation, Testing & Commissioning Of Electric Traction Passenger Elevator Capable Of Carrying 13 Persons Minm (884kgs Minm) From Ground Floor To 1st Floor (rise 36.0 Mtr Approx), Speed=1 .0mps, Stops: 2 Stops With All Opening On The Same Side, Control:vvvf. Ard System, With Speed Encoder, Op Eration: Simple Full Corrective Operations (with/without Attendant), Controller: Microprocessor Based On Mod Ular System (location: Door Column At Top Floor, Drive: Vf Regenerative Communication, Power Supply: 3-p Hase Ac - 415 V 5% Variation, Machine : Gearless With Permanent Magnet Motor Located In The Shaft At The Top As Per Rdso Specification No. Rdso/2013/em/spec/0016 (rev'1')-2019 Dtd. 26.12.2019. Make: Firefo X Elevators Private Limited/ Omega Elevators/ Tke Elevator/ Otis/ Kone Or Similar Isi Marked [ W Arranty Period: 30 Months After The Date Of Delivery ]

North Frontier Railway
06 Aug 2025
Multi State - Multi City
Refer doc
0

The Voltage Stabilizer Is Used Additionally To Ensure A Stable And Consentient Voltage Supply T O The Lift System Protecting The Later From Voltage Fluctuation, Surges, Dip Etc. Specification: -10 Kva, Input Voltage 340-480 Volt Ac, Output Voltage 415 Volt Ac, Cooling Onan, Protection Degree- As Per Ip 32. Make :- Servo [ Warranty Period: 30 Months After The Date Of Delivery ]

Select a tender

North Frontier Railway Tenders

GeMTech PARAS offers reliable access to North Frontier Railway tenders, focusing on railway infrastructure GeM and government e-tenders for Northeast India. Our platform helps vendors track tenders related to rail construction, maintenance, and procurement projects efficiently. With GeMTech PARAS, suppliers gain a competitive edge by accessing timely North Frontier Railway tender updates and resources.