Rail Coach Factory Tenders — Updated July 2026
Latest Rail Coach Factory Tenders — Updated Daily
GeMTech PARAS helps vendors tap into Rail Coach Factory tenders with full GeM railway tenders access, e-tender solutions, and filing support. Whether you deal in coach components, fabrication, painting, or supply chain logistics, we ensure you're properly registered and fully compliant. Our platform simplifies participation in coach manufacturing tenders and govt etender filings with real-time updates, bid alerts, and expert GeM support. We help vendors become competitive players in the expanding Indian railway production ecosystem.
Read More
Rail Coach Factory Tenders Overview
267
Rail Coach Factory Tenders Tracked
354+
Clients Across India
4.9★
Google Rating
24hr
Response Turnaround
98%
Compliance Rate
Showing 1 to 25 of 267
for Rail Coach Factory Tenders
Rail Coach Factory
1 day left
Supply And Installation Of One Coach Set Of Entrance Hand Rail For Train Set Dtc Coaches, As Per Drawing: Train18/dtc/ac-6-4-001 Alt Er Col - Iii, Packing Instruction: Pi018 Ver1.0, Biodegradable Packaging. Transit Damage If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
28 Jul 2026 12:00 PM
1 day left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
19 hours left
Supply Of End Wall Complete For Bangladesh Lhb First Ac Coaches. .note: Make/manufacturer Of Raw Material Shall Be M/s Jsl Or M/s Sail., As Per Drawing: Bae15001 Alt 'd' Fitted Along With Shutter Complete To Drg No. 2 10113.0.76.300.012 Alt '-r1', Packing Instruction: Pi187ver2.0. [ Warranty Period: 84 Months After The Date Of Delivery ] ]
End Date
27 Jul 2026 12:00 PM
19 hours left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
1 day left
Supply Of Set Of Honey Comb Partition Frame For Lhb Scn With Al Fr Hpl Sheet As Per Spec Mdts-097 Rev.01 In Which Hpl Is As Per Mdts-26337 Rev. 00 Instead Of Mdts-086, As Per Drawing: Mp24scnfr Version 1, Packing Instruction No.pi100: No Special Packing Required [ Warranty Period: 84 Months After The Date Of Delivery ] ]
End Date
28 Jul 2026 12:00 PM
1 day left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
19 hours left
Supply Of Set Of Seats For 3-phase Memu/dmc Coaches. Follow Cushioning Material Either Pu Foam To Rdso Spec. Rdso/2007/cg-04 Rev. 01 Or Silicon Foam To Spec. Rdso/2013/cg-13 Rev. 01 And Upholstery To Rdso Spec. Rdso/2008/cg-07 Rev-nil With Amendment Slip No-5 With Corrigendum 1 Of May 2015. Colour Shade Alac-01 For Upholstery As Per Lno.md22151 Dtd.18.06.2019 , As Per Drawing: Memu/dmc/3ph-6-1-001 Alt-ar W/o Item No.6, Packing Instruction No.pi183 Ver2.0 [ Warranty Period: 54 Months After The Date Of Delivery ] ]
End Date
27 Jul 2026 12:00 PM
19 hours left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Arrangement Of Uic Rubber Vestibule, As Per Drawing: Assembly Of Dmu/tc/v/ss-2-5-001 Alt R Col- I Item 1 And 10 And Rdso/2007/cg-05 Rev. 01, Packing Instruction No.pi110 Ver3.0 [ Warranty Period: 60 Months After The Date Of Delivery ] ]
End Date
30 Jul 2026 12:00 PM
3 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Bogie Bolster For Lhb Coaches (qr Code As Per Cde/rcf Letter No. Md44121 Dt. 24.11.2021.), As Per Drawing: 1267420 Ver. 04r1 & Mdts-204001 Rev.01 [ Warranty Period: 36 Months After The Date Of Delivery ] ]
End Date
30 Jul 2026 12:00 PM
3 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Stainless Steel Tubes And Double Ferrule Fittings For Lhb Chair Car., As Per Drawing: Material Schedule As Per Set List No. Rcf/md/mat Schedule/lwsczac,lwfczac & Lwscz Ver 00. Seperate Packing: - - Box 01: - Marked As Furnishing/air Brake Fittings And Containingset List Items Group A, B & F In Coach Set. - Box 02: - Marked As Bogie Fittings And Containing Set List Items Group C & D In Coach Set. - Pipes : - Marked As ?tubes/pipes? And Containing Set List Items Group E In Coach Set. , Packing Instruction: No Special Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be Protected With Suitable Covering To Prevent It From Damage. However Transit Damage If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
30 Jul 2026 12:00 PM
3 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply , Installation, Commissioning & Testing Of Stainless Steel Tubes And Double Ferrule Fittings For Lgs Coaches. Note:-installation Charges Are To Be Given/quoted Separately., As Per Drawing: Material Schedule As Per Set List No. Rcf/md/mat Sch/lgs, Ver 02 Dated 30/04/2026 Without Items Of Group "tube Length", Packing Instruction: No Special Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. Ifany Are To Be Protected With Suitable Covering To Prevent It From Damage. However Transit Damage If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After Thedate Of Delivery ] ]
End Date
30 Jul 2026 12:00 PM
3 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Stainless Steel Tubes And Double Ferrule Fittings For 3 Phase Memu/tc Coaches As Per Rcf Document No. Mp23fit/3ph/bom/002 Layout Drg. No. Et36293 Confining To Icf/md/spec-166 Issue Status-01 Rev.-04, As Per Drawing: Mp23fit/3ph/bom/002 Issue Status 00, Ver.0.0 Dtd 07/08/2023 With Correction Slip No. 1,2 ,3 ,4 & 5,, Packing Instruction: No Special Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be Protected With Suitable Covering To Prevent It From Damage. However Transit Damage If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
30 Jul 2026 12:00 PM
3 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply,installation,commissioning & Testing Of Stainless Steel Tubes And Double Ferrule Fittings For Lhb Non-ac Hot Buffet Car Coaches. Note:-installation Charges Are To Be Given/quoted Separately., As Per Drawing: Material Schedule As Per Fur/air Brake Set List No. Rcf/md/mat Schedule/ Hot Buffet Coach, Ver-02 Dated 30/4/26 And Bogie Set List No Rcf/mpbg/mat Sch/lwaccn/lwaccw/ Lvph/lwfac/lwsczac/lwfczac/lwcsz/ Lgs/lscn/lwcbac Ver-01 Dated 5/5/26. Note: Seperate Packing Marked As Fur/air Brake Or Bogie., Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transitdamage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
30 Jul 2026 12:00 PM
3 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Set Of Carline For Lhb Bangladesh Ac Sleeper Car Coaches., As Per Drawing: Mp26banglacslcl Version 0, Packing Instruction: Pi185 Version 02 Carline Assly:- The Supplier Shall Pack The One C/set (segments) Of Carlines In A Suitably Designed Robust Returnable Mettalic Cage/ Structure In Such A Way That Carlines Shall Not Get Entangled, Damaged, Twisted , Dented During Transportation, Storage, Handling And Lifting And To Avoidscratches On Outer Surface Suitable Enviroment Friendly Cushioning Material Is To Be Placed Between Two Segmemts. Transit Damage If Any Shall Be At The Cost Of Supplier. The Packing Cage/structure To Be Fabricated By Using Sq. Tubes Channels/angles Having Sufficient Strength To Bear Approximate One Tonne Material Load In Static & Moving Condition Of One Coach Set Of Carline. The Bottom Part Of This Packing Cage//pallet Should Be Such That Curvature Profile Of Bottom Carline Should Match With The Profile Of Packing Cage And It Can Accomodate Fork Lifter Arms For Lifting & Transportation. It Should Have Standard Clamping/fastening Mechanism To Facilitate Easy Unpacking & Unloading. It Should Have Firm's Dentification/colour Mark. The Packing Cages Along With Setof Carlines Supplied In One Lot Be Retained By Rcf & This Cage Set Shall Be Exchanged In The Second Lot Supply And So On. At The End Of The Contract, The Firm Shall Collectthe Remaining Returnable Packing Cages From Rcf. It Should Also Be Suitable For Storage Of Carline Under Open Sky. Packing Slip Should Be Pasted On Each Cage Showing P.o. No., Pl No., Description , Drg No./spec., Qty., Firm's Name & Address And Despatch Date Etc. For Identification. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
31 Jul 2026 12:00 PM
4 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Fixing Arrangement Of Rolling Shutter Assembly For 3-phase Memu/tc Coaches, As Per Drawing: Dmu/tc/v/ss-2-5-002 Alt Cr1 Col I,packing Instruction No.pi042 Ver1.0 [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
03 Aug 2026 12:00 PM
7 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
2 days left
Supply Of Set Of Body Side Doors For Lhb Amrit Bharat 3.0 Coaches. (note- Colour Scheme Is As As Per Design Letter No-md48161 Dated- 15/05/2026 ), As Per Drawing: Mp26doorab3.0 Version 0, Packing Instruction: (1) The Transportation Arrangement Should Be As Per Drawing No Icf/j&t/sk-1866 Alt. `nil?. (2) A List Should Be Pasted Showing Interior Color Scheme, Purchase Order No., Pl No., Description Of Item, Drg. No./spec. No. , Order Quantity, Firm's Name, Address And Date Of Dispatch. Etc. (3) Transit Damage (if Any) Shall Be At The Cost Of Supplier. ]
End Date
29 Jul 2026 12:00 PM
2 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Air Spring 180 Kn For Memu 3 Phase Dmc & Tc Coaches To Rdso Spec No. Rdso/cg/s/23002, Rev. Nil-(qr Code As Per Cde/rcf Letter No. Md44121 Dt. 24.11.2021.), As Per Drawing: Mplbgasmemu3ph Version 4 [ Warranty Period: 72 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
05 Aug 2026 12:00 PM
9 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Set Of Control Arms (finished) For Lhb Bogies And Its Components (qr Code As Per Cde/rcf Letter No. Md44121 Dt. 24.11.2021.) Marking ( Punched/laser-etched) As Per Dy.cme/bd Letter Md44121 Dt.30.04.2025, As Per Drawing: Mplgconfinlhb Version 5 Set Doc: Mplgconfinlhb [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted:max 8 Lacs ] ]
End Date
05 Aug 2026 12:00 PM
9 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Honeycomb Partition Frame Set With Al Fr Hpl Sheet For Lhb Scn Amritbharat 3.0 Coaches. (note- Colour Scheme Is As Per Design Letter No Md48161 Dated- 15/05/2026 ), As Per Drawing: Mp26hplscnab3.0 Version 0, Packing Instruction No.pi118 Ver-1 [ Warranty Period: 84 Months After The Date Of Delivery ] ]
End Date
03 Aug 2026 12:00 PM
7 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Set Of Floor Plate For Ac Power Car Of Bangladesh Railway (blwjpclr)., As Per Drawing: Mplalfpwjpclr Version 2, Packing Instruction: Pi042 Ver 3.0 (1) Drawing No. Icf/j&t/misc-2487 Alt. `b? To Be Followed. (2) It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Damage, If Any, Shall Be At The Cost Of Supplier. For Underframes: Both (1) & (2) To Be Followed As Stated Above. For Other Items Except Underframes: Only (2) Need To Followed. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
05 Aug 2026 12:00 PM
9 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
19 hours left
Electrification Arrangement For New Deep Tube Well In Placed Of Pump No. 22 Near Lpg Yard With Re-boring Of New Pump& Electrification Arrangement For Up Gradation Of Various Toilet Blocks In Workshop Area Rcf Kapurthala.
End Date
27 Jul 2026 12:00 PM
19 hours left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Air Inlet Duct Complete Mounting For Bg Air Conditioned Chair Car (wjcc)., As Per Drawing: Bze44401, Packing Instruction: Items Will Be Individually Wrapped In Corrugated Paper With Jute Fabric, Collectively Packed In Wooden Cage. A List Should Be Pasted Oneach Box Showing Order No., Pl No, Description Of Item, Drg No/spec No/set List No With Version,qty, Firm's Name & Address, Date Of Dispatch. Transit Damage If Any Shall Be At The Cost Of Supplier [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
04 Aug 2026 12:00 PM
8 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Corrigendum : Supply Of Fully Assembled Improved Bogies Compatible With Ir-lhb Coaches.quantity:1600 Bogies (800 Lwaccn + 400 Lws + 400 Lscn), As Per Drawing: Specification No. Rcf-md-ps-2023-5 Rev. 05, Packing Instruction: Packing As Per Drawing [ Warranty Period: 48 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
End Date
11 Aug 2026 12:00 PM
15 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
5 Years Annual Maintenance Contract Of Cnc 3d Coordinate Measuring Machine M/s No 0105-001 As Per Scope Of Work.
End Date
06 Aug 2026 12:00 PM
10 days left
Location
Multi City, Multi State
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
1 day left
Supply Of Media Converters, Multi Mode, Gigabit To Ethernet Media Converter ]
End Date
28 Jul 2026 12:00 PM
1 day left
Location
Mysore, Karnataka
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Entrance Hand Rail Complete, As Per Drawing: Mi004202 Alt C, Packing Instruction:corrugated Paper [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
04 Aug 2026 12:00 PM
8 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Set Of Seats & Berths For Lhb Ac 3t Amrit Bharat Coaches. Follow Cushioning Material Either Pu Foam To Rdso Spec. Rdso/2007/cg-04 Rev. 01 Or Silicon Foam To Rdso Spec. Rdso/2013/cg-13 Rev. 01 And Upholstery To Rdso Spec.rdso/2008/cg-07 Rev.-01. Follow Colour Scheme As Per Design L.no. Md48161 Dated 15.05.2026, Follow Special Conditions As Per Design L.no. Md46221 Dated 24.06.2026, As Per Drawing: Lwaccn/pp2-6-1-001 Without Item 34, Packing Instruction No.pi117 Ver 10.0. [ Warranty Period: 54 Months After The Date Ofdelivery ] ]
End Date
03 Aug 2026 12:00 PM
7 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Rail Coach Factory
Supply Of Set Of Side Wall & Roof Assly For Lhb Scn Coaches. Note:-(1)crf Items Are To Bemanufactured As Per Dy. Cple-iii Letter No. Rcf/hsq/plg/mpsh/510003/lhb Dated 04/04/2024 (2)in Drawings "mig Welding (131) Is To Be Read As Tig Welding (141)" As Per Design Letter No. Md46231 Dated 16.03.2024., As Per Drawing: Mp25swrscn Version 2 [ Warranty Period: 30 Months After The Date Of Delivery ] ]
End Date
04 Aug 2026 12:00 PM
8 days left
Location
Kapurthala, Punjab
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Select a tender to view details
The Problem
Why Rail Coach Factory Tenders Get Rejected at the Technical Stage
These are the most common rejection reasons our team sees — all 100% avoidable with the right support.
Documentation Errors
Incorrect formats or missing mandatory certificates often lead to rejection.
Submission Delays
Waiting until the last minute often leads to technical glitches & failure.
The Solution
Everything You Need to Win Rail Coach Factory Tenders — In One Platform
End-to-end bid support from documentation to order confirmation.
Documentation Support
We prepare your complete technical & financial bid folders — rejection-proof.
- EMD / Bank Guarantee preparation
- QR certificate compilation & verification
- MAF & OEM authorization letters
Portal Management
End-to-end bid submission so you never miss a deadline.
- Bid submission on portal
- Document upload & correct tagging
- Deadline alerts & reminders
Post-Bid Support
We stay with you from submission to order confirmation.
- Technical Query (TQ) response
- Evaluation stage liaisoning
- LOI / Work Order follow-up
Our Process
How It Works — 4 Simple Steps
1
Eligibility Check
WhatsApp company profile, AI checks QR fit within 2 hours
2
Document Review
we audit existing documents against tender requirements
3
Bid Preparation
we prepare all technical & financial folders, 100% compliant
4
Submit & Win
submission supported through evaluation
FREE DOWNLOAD
Rail Coach Factory Tender Checklist:
10 Must-Have Documents
10 Must-Have Documents
The exact checklist our team uses for every Rail Coach Factory bid — never get
rejected for a missing document.
FAQ
Frequently Asked Questions about Rail Coach Factory Bidding
Chat with a Rail Coach Factory tender Expert