- Splitting
- Advisory Bank
- Reserved for MII
- Reserved for MSE
- Bid to RA Enabled
- Evaluation Method
- MSE Purchase Preference
- MSE Exemption
Splitting
Advisory Bank
Reserved for MII
Reserved for MSE
Bid to RA Enabled
Evaluation Method
MSE Purchase Preference
MSE Exemption
Showing 1 to 25 of 298 results for Rail Coach Factory Tenders
Rail Coach Factory
Supply Of Aluminium Pipe 71mmx3.15mm In Length Of 5400mm., As Per Drawing: Din En 755 (p Art 1 , 3) Almg1sio.8 / Din 1795 And Is:2673-1979, Packing Instruction: As Per Standard Packing. I T Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supp Lier. [ Warranty Period: 30 Months After The Date Of Delivery ]
Rail Coach Factory
Supply Of Final Roof Element, As Per Drawing: Lr10161 Alt 'nil', Packing Instruction: Return Able & Re-usable Metallic Pallet Item Should Be Supplied In Returnable & Re-usable Palle T Made Of Steel. The Design Of The Pallet Should Be : " Water And Fire Proof. " Rust Free. " Having Good Strength To Weight Ratio. " Suitable For Stacking In Several Layers, Comp Atible With Each Other When Stacked. " Able To Withstand The Rough Handling Of Comm On Logistic Systems Such As Fork Lifter, Cranes Etc. " Able To Facilitate The Storing, Handling And Unloading With Minimum Labour And Time. " Having The Interior Of The Pall Et Lined With Suitable Material (like Frp ) So As To Prevent Damage To The Item Being Tra Nsported. While Stacking The Item Inside The Pallet, There Should Be Minimum Use Of Disp Osable Packing. " The Pallet Should Have Firm's Logo For Identification. Firm Should Als O Indicate Pl No., Description Of Item On The Pallet. Note : 1.for Packing The Individual It Em(s), The Use Of Material Which Are Not Environment Friendly Such As Wood/polyethen E/plastic Is Prohibited, However The Environment Friendly Plastic Can Be Used. 2.the Ite M Should Be Packed In Such A Way That It Should Not Rub During Transportation. The In- Transit Damage, If Any, Shall Be At Cost Of The Supplier. 3.the Design To Be Got Approved By The Firm From Cde/rcf Before Initiating Manufacturing. [ Warranty Period: 30 Months Af Ter The Date Of Delivery ]
Rail Coach Factory
Supply Of Final Roof Element, As Per Drawing: Lr10161 Alt 'nil', Packing Instruction: Return Able & Re-usable Metallic Pallet Item Should Be Supplied In Returnable & Re-usable Palle T Made Of Steel. The Design Of The Pallet Should Be : " Water And Fire Proof. " Rust Free. " Having Good Strength To Weight Ratio. " Suitable For Stacking In Several Layers, Comp Atible With Each Other When Stacked. " Able To Withstand The Rough Handling Of Comm On Logistic Systems Such As Fork Lifter, Cranes Etc. " Able To Facilitate The Storing, Handling And Unloading With Minimum Labour And Time. " Having The Interior Of The Pall Et Lined With Suitable Material (like Frp ) So As To Prevent Damage To The Item Being Tra Nsported. While Stacking The Item Inside The Pallet, There Should Be Minimum Use Of Disp Osable Packing. " The Pallet Should Have Firm's Logo For Identification. Firm Should Als O Indicate Pl No., Description Of Item On The Pallet. Note : 1.for Packing The Individual It Em(s), The Use Of Material Which Are Not Environment Friendly Such As Wood/polyethen E/plastic Is Prohibited, However The Environment Friendly Plastic Can Be Used. 2.the Ite M Should Be Packed In Such A Way That It Should Not Rub During Transportation. The In- Transit Damage, If Any, Shall Be At Cost Of The Supplier. 3.the Design To Be Got Approved By The Firm From Cde/rcf Before Initiating Manufacturing. [ Warranty Period: 30 Months Af Ter The Date Of Delivery ]
Rail Coach Factory
Supply Of Holding Bracket Complete, As Per Drawing: Lw44243 Alt B, Packing Instruction: Pi 001: Suitably Packed In Jute Bags [ Warranty Period: 30 Months After The Date Of Delivery ]
Rail Coach Factory
Supply Of Cross Section, As Per Drawing: 1267405 Ver. 02r1 And Mdts 150 Rev. Nil Or Late St & Mdts 166 Rev. 1 Or Latest, Packing Instruction: No Special Packing Required [ Warranty Period: 30 Months After The Date Of Delivery ]
Rail Coach Factory
Intergrated Wtcc With End Assly For Lhb Non Ac Coaches., As Per Drawing: Lg 10180 Except Item No. 1 Alt. 'k', Packing Instruction: 1. The Supplier Shall Pack The Integrate D Wtcc In A Suitably Designed Returnable Fixture In Such A Way That Integrated Wtcc S Hall Not Get Scratched, Damaged, Twisted During Transportation, Storage And Lifting And To Avoid Scratches On Outer Surface. It Should Be Wrapped With Enviroment Friend Ly Material And It Should Have Standard Clamping /fastening Mechanism So That It Can B E Opened Easily. It Should Have Firm's Identification Mark. 2. First Returanable Fixture Al Ong With Integrated Wtcc Be Retained By Rcf & This Fixture Shall Be Exchanged In The Se Cond Lot Supply And So On. At The End Of The Contact, The Firm Shall Collect The Remain Ing Returnable Packing Fixture From Rcf. 3. The Packing Fixture/frame To Be Fabricated Having Sufficient Strenght To Bear Approximate 1 Tonne Load In Static & Moving Conditi On Of Two Coach Set Of Integrated Wtcc. 4. The Fixture /frame/pallet Should Be Designe D So That The Packed Wtcc Remain Preferably In Horizontal Position To Minimize Surface Area. 5. It Should Also Be Suitable For Storage Of Integrated Wtcc Under Open Sky. [ Wa Rranty Period: 30 Months After The Date Of Delivery ]
Rail Coach Factory
Supply Of Handle For Water Tank Flap Arrgt. (acp) For Amrit Bharat Coaches. It Shoul D Be Powder Coated To Ral090 9005., As Per Drawing: Mi008051 Alt Nil Item 6, Packing Instructi On: Pi013: Brown Papper Wrapping For Individual Item Collectively Packed In Jute Bags [ W Arranty Period: 30 Months After The Date Of Delivery ]
Rail Coach Factory
Supply Of Flexible Connector Hose With Stainless Steel Mesh Protection, As Per Drawin G: Ae63201, Packing Instruction: Pi021: Card Board Boxes [ Warranty Period: 30 Months After The Date Of Delivery ]
Rail Coach Factory
Supply Of Set Of Aluminium Panel For End Wall For Memut3ph (bhel) Coaches
Rail Coach Factory
Supply Of Endwall For Lhb
Rail Coach Factory
Part A:- Lighting Arrangement In Furnishing Yard In Rcf Workshop Kapurthalapart B: Provision Of Led Flood Light In Shower Testing Rig For Shell Assembly Shop In Workshop Rcf Kapurthala
Rail Coach Factory
Annual Maintenance Contract For Repairing Of Bosch Makes Double Insulated Electric Small Tools In Rcf Kapurthala.
Rail Coach Factory
Supply Of Bracket For Fixing Industrial Lock Of Attachment Wall For Lhb Slr Coaches To Pl No- 33682343.
Rail Coach Factory
Supply Of Bracket, As Per Drawing: Lg16165 'b', Packing Instruction: Pi100 Ver 1.0: No Special Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be Protected With Suitable Covering To Prevent It From Damage. However Transi T Damage If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ]
Rail Coach Factory
Supply Of Set Of Integrated Wtcc
Rail Coach Factory
Supply Of Stress Relieving, Shot Blasting, Painting And Machining & Transportation O F Bogie Frame For Ir-fiat Bogies, As Per Drawing/specification: Lg03001 Sheet 1 Alt. 'f' (to Be M Achined From Drawing No. Lg03001 Alt.'f' Sheet 2) /lw03002 Sheet 1 Alt.'k' (to Be Machined From Drawing No. Lw03002 Alt.'k' Sheet 2) And Mdts 213 Rev.'04' Or Latest.the New Painting Scheme Is To Be Followed As Per Dy.cme/design (s&b) Letter No. Md44121 Dtd. 08.01.2024. [ Warran Ty Period: 84 Months After The Date Of Delivery ]
Rail Coach Factory
Supply Of Switch Plate Assembly For Lhb Eog Non Ac Lgs Coaches (with Wider Window S), As Per Drawing: Edml-242, Rev-nil, Cor.1, Table-1, Packing Instruction: Packing As Per Drawi Ng [ Warranty Period: 30 Months After The Date Of Delivery ]
Rail Coach Factory
Supply Of Set Of Door Cut Out Complete For Lhb Gs Amrit Bharat Coaches Note:-firm S Hall Collect All Latest/final Drawings Before Manufacturing. There May Be Minor Modi Fication In Design., As Per Drawing: Mp24dcolwsab Version 2, Packing Instruction: No Special P Acking Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be Protected With Suitable Covering To Prevent It From Damage. However Transi T Damage If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ]
Rail Coach Factory
Supply Of Axle Mounted Disc Brake System & Ep Assist Brake System For Lslr D Amrit Bharat Coaches. As Per Drg/spec. Rdso Specification Rdso/2011/cg-04 (rev.03) Issue May'2024' Without Brake Disc And Emergency Brake Cable Box Or Passenger Emergency Pi Lot Valve. Packing Instruction: Pi042 Ver1.0 [ Warranty Period: 36 Months After The Date Of Deliver Y ]
Rail Coach Factory
Supply Of One Rake Set Of Cutaway Sealing Arrangement For Vande Bharat Coaches. ( 16 Coaches Rake), As Per Drawing: Mplcsavb Version 2, Packing Instruction: Jute Fabric [ Warra Nty Period: 30 Months After The Date Of Delivery ]
Rail Coach Factory
Complete Grinding Activities Of Coaches And Other Grinding Activities In Different Coach Variants As Per Scope Of Work.
Rail Coach Factory
Supply Of Funnel For Slr Coaches, As Per Drawing: Lb64140 (colour Shade Ral-9006, Md4 6271 Dt 18.01.2021), Packing Instruction: Pi042 Ver 1.0: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed Wi Th Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warra Nty Period: 30 Months After The Date Of Delivery ]
Rail Coach Factory
Supply Of Ofloxacin 50 Mg With Metronidazole 100mg/5ml Suspension Packing At Least 30 Ml Bottl E. ]
Rail Coach Factory
Supply Of Torasemide 20 Mg Tablet ]
Rail Coach Factory
Electrical Wiring In Additional Room Constructed Existing Type-i Qtrs. At Rcf Kapurthala.
Select a tender
Rail Coach Factory Tenders
GeMTech PARAS helps vendors tap into Rail Coach Factory tenders with full GeM railway tenders access, e-tender solutions, and filing support. Whether you deal in coach components, fabrication, painting, or supply chain logistics, we ensure you're properly registered and fully compliant. Our platform simplifies participation in coach manufacturing tenders and govt etender filings with real-time updates, bid alerts, and expert GeM support. We help vendors become competitive players in the expanding Indian railway production ecosystem.