🔴  3 rail wheel plant tenders closing in under 3 days — review & act now —  Review & act now
rail wheel plant Tenders — Updated April 2026

Latest rail wheel plant Tenders — Updated Daily

GeMTech PARAS streamlines vendor participation in rail wheel tenders issued by India’s Rail Wheel Plants, with dedicated support for GeM railway tenders, engineering tenders, and full govt procurement compliance. Whether you're supplying castings, axles, machining tools, or ancillary services, our e-tender support ensures your bid is complete and correctly submitted. With our tools, vendors can participate confidently in this niche yet vital segment of railway manufacturing and supply.
Read More

GeMTech PARAS aggregates live rail wheel plant tenders in one searchable platform. Every active tender is indexed, filtered, and matched to your company profile automatically. Stop manually checking portals — let the data come to you.

313
rail wheel plant Tenders Tracked
348+
Clients Across India
4.9
Google Rating
24hr
Response Turnaround
98%
Compliance Rate

    rail wheel plant
    Showing 1 to 25 of 313 for Rail Wheel Plant Tenders
    rail wheel plant
    One hour left
    Carriage Of Condemned Wheelsets Of Railways From Various Locations Of Indian Railways To Rail Wheel Factory, Yelahanka, Bengaluru,karnataka- 560064 Under The Distance Slab Of Above 500kms & Upto 1000kms,by Road. Loading And Unloading By Railways At Free Of Cost. Quantity:1300 Mt. Special Note: (1) Tenderers Should Quote The Rates Based On The Diesel Price Of Rs.90.99 Per Litre Prevailing At Bengaluru As On The Estimation Date I.e.11.11.2025 And The Same Shall Be Considered For The Purpose Of Evaluation. (2)mandatory Documents Should Be Submitted In Compliance Of: Bid Security Conditions Including Annexure-vi(a), Annexure-v, Annexure-v(a), Annexure-vi(b), Power Of Attorney And Iba Certification. (3) Non-submission Of Necessary Documents In Support Of The Above May Result In Rejection Of Bids.(e Office No.330862.)
    End Date 30 Apr 2026 12:00 PM One hour left
    Location Bengaluru, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    One hour left
    Supply Of Phosphate Easter Fire Resistant Hydraulic Fluid
    End Date 30 Apr 2026 12:00 PM One hour left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    One hour left
    Corrigendum : Supply Of "25.4 Mm (1") 8 Unc Hex Head Bolt Made Of Hdpe To Wap Drg No Wap/sk/ma-338 Alt. Nil." ]
    End Date 30 Apr 2026 12:00 PM One hour left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    One hour left
    Corrigendum : Supply Of 1 1/8" 7 Unc 2b Hex Head Bolt(hdpe) To Rwf Drg.no.rwf-p-081. ]
    End Date 30 Apr 2026 12:00 PM One hour left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    Corrigendum : Supply Of Hearth Border Bricks For External Hearth Type-"d" To Rwf Drg. No.734210111030 Alt 3. ]
    End Date 04 May 2026 12:00 PM 4 days left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    Corrigendum : Supply Of Rotor Part No.3604080025 For Hf Grinder Of Bosch Germany Made Model No.hf 0602240136 ]
    End Date 04 May 2026 12:00 PM 4 days left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    Supply Of 25 Ton Axle Journal Hdpe End Cover
    End Date 04 May 2026 12:00 PM 4 days left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    Supply Of Grease - Special Purpose
    End Date 04 May 2026 12:00 PM 4 days left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    Supply Of Semiconductor Fuse 110a
    End Date 04 May 2026 12:00 PM 4 days left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    Supply Of Biodegradable - Algecide "aquaclean"
    End Date 06 May 2026 12:00 PM 6 days left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    Supply Of Regulated Ac/dc Power Supply
    End Date 11 May 2026 12:00 PM 11 days left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    Supply Of Graphite Electrode As Per Rwf Specification
    End Date 29 Jun 2026 12:00 PM 60 days left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    Three Piece Design Ball Valve,carbon Steel Body With Both Ends Female Threaded To 1"bsp,ball,stem & Gland Of Ss 304 Quality,body Seal & Gland Packing Of Ptfe Quality,valve Fasterners Of High Tensile Quality,application:air/water,make:audco/amco/flocon/sap Only,note:1)the Firm Shall Be Required To Submit Authorised Dealership Certificate.2)one Number Sample To Be Supplied For Approval Before Bulk Supply.3)warranty Minimum 06 Months From The Date Of Supply. [ Warranty Period: 6 Months After The Date Of Delivery ]
    End Date 06 May 2026 12:00 PM 6 days left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    Supply Of Vacuum Pin Tubes Made Up Of Pyrex Glass As Per The Drawing No.wap/misc/m-1043. Vacuum Should Be The Order Of 10^-3 Bar/0.76 Mm Of Hg. ]
    End Date 11 May 2026 12:00 PM 11 days left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    Supply Of Hose Rubber With Woven Textile Reinforcment Black/blue Colour 10 Mm Id For Oxygen Gas As Per Is: 447/1988. Make: Dunlop, Advani, Esab, Messer Or Parker ]
    End Date 04 May 2026 12:00 PM 4 days left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    One hour left
    Supply Of "pillow Block With Double Row Spherical Roller Bearing With Steel Cage Normal Duty 2000 Series To Model No.za 2207-78 Of M/s.rexnord Or P2b-s2-207r Of M/s Dodge Or Syr2-7/16 (collar Mount Type)of M/s Skf Make To Suit 2-7/16" Dia Shaft." ]
    End Date 30 Apr 2026 12:00 PM One hour left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    2 days left
    Supply, Installation,testing And Commissioning Of New Cold And Fresh Air Ventilation System At Mould Room As Per Tehnical Specification And Scope Of Work. Rate Is Inclusive Gst
    End Date 02 May 2026 12:00 PM 2 days left
    Location Multi City, Multi State
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    Corrigendum : Self Aligned Double Row Spherical Roller Bearing (steel Cage)no.22212e Of M/s.skf / 22212 E1 Of M/s. Fag / 22212 Bd1 Of M/s.ntn Only. Special Conditions For Supply Ofbearings As Below.1)vendors Are Requested To Quote Only For The Brands They Are Approved For. 2) The Authorised Agents Shall Supply Bearings With Original Manufacturer's Tamper Proof Seal. 3) The Authorized Agents Shall Furnish Inspection Certificate Frommanufacturers Or Their Authorized Testing Agents. 4) Tenderers Are Required To Quotefor Skf/fag/ntn Make Only. 5) Non Compliance Of Any Of The Conditions By The Tenderer May Result In Their Offer Getting Ignored. ]
    End Date 04 May 2026 12:00 PM 4 days left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    Supply, Installation And Commissioning Of 10t Goliath Crane For Ready Axle Storage And Dispatch Complex As Per Technical Specification No: Rwf/m/m&p/ams/2025/10t Golliath Crane Enclosed. ]
    End Date 11 May 2026 12:00 PM 11 days left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    One hour left
    Supply Of Cutting Compound To Is: 1115-1986/reaffirmed 2002, With Bacteriacide Test Of The Folowing Make: (1)ioc-servocut's' (2)hpc-koolcut-40 (3)bpc-sherol-b (4)balmer & Lawrie-protosol-mc (5)ibp-ibp Easy Cut (6) Sah Petroleum-ipol-cut-105 (7)sun-sunol-solcut Spl M -1000 (8)phoenix Oil-phoenix Ocs-1115 (9)raj-rajepsol Super S (10)mineral Oil-minrol Cut S (11) Gulf Oil Corporation Ltd -gulf Emulsil Na. ]
    End Date 30 Apr 2026 12:00 PM One hour left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    2 days left
    Testing, Inspection And Certification Of Lifting Machines, Lifting Tackles, Fork Lifts, Safety Items, Handling Equipments And Pressure Vessels Used In The Factory For 2026-2027.
    End Date 02 May 2026 12:00 PM 2 days left
    Location Multi City, Multi State
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    Supply Of Modified 10" Pitch (254mm)chain For Flight Roller Conveyor To Wap Drawingno.702064610880 With 14 Sub Drawings" As Furnished In The Above Drawing. Special Conditions: 1 Tenderer Should Be In The Line Of Manufacturing Industrial Chain And Shall Have In House Facilities To Manufactur And Test The Manufactured Chain However Heat Treat Ment Process Can Be Out Sourced. 2.raw Material For Chain Manufacturing Shall Be Procured Through Reputed Sources M/s Sail, Tisco, Isp&t, Ismt, Jindal, Msl, Kalyani Or Tata And The Documents For Having Procured The Raw Material From The Above Sources To Be Furnished At The Time Of Inspection. 3.material Test Certificate For All The Components Of The Chain Shall Be Furnished At The Time Of Inspection. 4.the Tenderer Shall Produce Documentary Evidence For Having Manufactured And Successfuly Supplied Industrial Conveyor Chains To Rwf Or Any Other Organiztion In The Last 10 Years. 5.the Chain Shall Be Coated With Anti-corrosive Coating After Assembly Of Chain Before Packing. 6.the Chain Shall Be Covered With Thick Polythene Sheet And Packed In Wooden Pallets. ]
    End Date 04 May 2026 12:00 PM 4 days left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    One hour left
    Corrigendum : Supply Of Piston Rod Seal Kit To Part No.rk2ahlo171 For Hyd. Cylinder Fitted With 1-3/4" Rod Dia Of M/s Parker Hannifin." ]
    End Date 30 Apr 2026 12:00 PM One hour left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    One hour left
    Corrigendum : Parker Make Gland Cartridge Kit To Part No Rg2ahl0405 For Rod Dia 101.6 Mm Of Fluorocarbon (viton) Material Suitable To Hydraulic Cylinder Model No. 203.2-c-t-c2h Rls-3-3-c-500 Make Parker Only.the Kit Consisting Of: (a) P.b.gland- 1no (b)wiper Seal (viton)- 1no (c) Lip Seal (viton)-1no (d) Back Up Ring (ptfe)- 1 No. Note: (1) The Offer Should Accompany Detailed Technical Catalogue/literature. (2) Valid Authorisation Certificate From O.e.m. Should Be Enclosed Along With Supply. (3) Warranty/guarantee: 09 Months From Date Of Supply Or 06 Months Date Of Fitment Whichever Is Early. Warranty/guarantee: Certificate Should Be Submitted. (4) All Other Warranty/guarantee Conditions Shall Be As Per Indian Railway Standard (irs) Conditions Of Contract. [ Warranty Period: 9 Months After The Date Of Delivery ]
    End Date 30 Apr 2026 12:00 PM One hour left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc
    rail wheel plant
    One hour left
    Corrigendum : Supply Of Piston Seal Kit Part No.pk 9202a005 For Pnumatic Cylinder Of 12"bore Of M/s Parker Hannifin ." ]
    End Date 30 Apr 2026 12:00 PM One hour left
    Location Bangalore, Karnataka
    Department Refer doc
    Amount Refer doc
    Amount: Refer doc

    Select a tender to view details

    The Problem

    Why rail wheel plant Tenders Get Rejected at the Technical Stage

    These are the most common rejection reasons our team sees — all 100% avoidable with the right support.

    Documentation Errors
    Incorrect formats or missing mandatory certificates often lead to rejection.
    Submission Delays
    Waiting until the last minute often leads to technical glitches & failure.
    The Solution

    Everything You Need to Win rail wheel plant Tenders — In One Platform

    End-to-end bid support from documentation to order confirmation.

    📁
    Documentation Support
    We prepare your complete technical & financial bid folders — rejection-proof.
    • EMD / Bank Guarantee preparation
    • QR certificate compilation & verification
    • MAF & OEM authorization letters
    💻
    Portal Management
    End-to-end bid submission so you never miss a deadline.
    • Bid submission on portal
    • Document upload & correct tagging
    • Deadline alerts & reminders
    🤝
    Post-Bid Support
    We stay with you from submission to order confirmation.
    • Technical Query (TQ) response
    • Evaluation stage liaisoning
    • LOI / Work Order follow-up
    Our Process

    How It Works — 4 Simple Steps

    1
    Eligibility Check
    WhatsApp company profile, AI checks QR fit within 2 hours
    2
    Document Review
    we audit existing documents against tender requirements
    3
    Bid Preparation
    we prepare all technical & financial folders, 100% compliant
    4
    Submit & Win
    submission supported through evaluation
    FREE DOWNLOAD
    rail wheel plant Tender Checklist:
    10 Must-Have Documents
    The exact checklist our team uses for every rail wheel plant bid — never get rejected for a missing document.
    FAQ

    Frequently Asked Questions about rail wheel plant Bidding

    How to register as a vendor for rail wheel plant?

    Submit the required registration form along with your company registration documents, GST certificate, PAN, and relevant experience certificates on the rail wheel plant vendor portal. You'll also need to clear a financial assessment. GeMTech PARAS manages the entire empanelment process — contact us for a free eligibility assessment.

    What is the EMD requirement for rail wheel plant tenders?

    EMD is typically 2–3% of the estimated tender value, submitted as a Bank Guarantee (BG) from a scheduled commercial bank. The bank branch and BG format must be pre-approved. Submitting a DD or an incorrect BG format is the single most common rejection reason. The exact amount and format are always specified in the NIT — we verify this for every bid we manage.

    Chat with a rail wheel plant tender Expert