Filters
More filters
South East Central Railway
Showing 1 to 25 of 714 results for South East Central Railway Tenders
South East Central Railway
23 Aug 2025
Chhattisgarh - Durg
Refer doc
0

Replacement Of Existing Overaged Scada System As Per Rdso Spec Ti/spc/rcc/scada/0134 Or Latest For Durg-ngp Section Over Nagpur Division (including Supply, Erection, Testing And Commissioning Of Scada System As Per Rdso Spec Ti/spc/rcc/ Scada/0134 Or Latest , Dismantle Of Existing Scada System And Workstation Modification At Rcc).

South East Central Railway
22 Sept 2025
Chhattisgarh - Bilaspur
Refer doc
0

Design/modification, Supply, Erection, Testing And Commissioning Of 220kv/2x25 Kv Scott Connected Traction Sub Station And Switching Posts With At Feeding Between Bilaspur (excl.) - Anuppur (incl.) Section Of Bilaspur Division Sec Railway In Connection With Up- Gradation Of Electric Traction System From 1x25 Kv To 2x25 Kv Traction System For Bilaspur-anuppur Section Of Secr To Meet 3000 Mt Loading Target.

South East Central Railway
02 Sept 2025
Multi State - Multi City
Refer doc
0

Construction Of Road Over Bridge (rob) Proper (over Rail Track) Cum Road Under Bridge (rub) At Km 15/1-15/2 At Lc No. Ar-12 Between Abhanpur-rajim, On Engineering, Procurement & Construction (epc) Mode

South East Central Railway
06 Oct 2025
Multi State - Multi City
Refer doc
0

Construction Of Road Over Bridge (rob) Proper (over Rail Track) Cum Road Under Bridge (rub) At Km 15/1-15/2 At Lc No. Ar-12 Between Abhanpur-rajim, On Engineering, Procurement & Construction (epc) Mode

South East Central Railway
25 Aug 2025
Multi State - Multi City
Refer doc
0

Supply Of Set Of Transformer Fixing Bolts With Nuts(16 Nos Each).hex Bolt M 24x220mm Long Threaded

South East Central Railway
12 Sept 2025
Chhattisgarh - Bilaspur
Refer doc
0

Upgradation Of Existing Scada System Over Bsp Division Of Sec Railway.

South East Central Railway
01 Sept 2025
Chhattisgarh - Bhilai
Refer doc
0

Supply Of Oxy-acetylene Regulator.

South East Central Railway
02 Sept 2025
Maharashtra - Nagpur
Refer doc
0

Supply, Installation, Commissioning And Testing Of Electric Surface Traverser , Capacity-80 Ton Etc.

South East Central Railway
20 Nov 2025
Chhattisgarh - Bilaspur
Refer doc
0

Design, Supply, Erection, Testing And Commissioning Of 220kv/2x25 Kv Scott Connected Traction Sub Station And Switching Posts With At Feeding Between Bilaspur (incl.) - Raigarh (incl.) And Champa- Gevra Road- Surakachhar Section Of Bilaspur Division Sec Railway In Connection With Up- Gradation Of Electric Traction System From 1x25 Kv To 2x25 Kv Traction System Of Secr To Meet 3000 Mt Loading Target."

South East Central Railway
25 Aug 2025
Chhattisgarh - Bilaspur
Refer doc
0

Supply, Installation, Testing & Commissioning Of 500kva (336kw), 750v, 3-phase Di Esel Alternator Set, Cpcb-iv Or Latest For Lhb Power Car With Pcc Panel (power Commond And C Ontrol Panel) Conforming To Rdso/pe/spec/ac/0084-2008 Rev-1, With Rcf Annex.-a And Icf Amen Dment-1 Along With Manual Isolating Switch As Per Edml-208, And Remote Monitoring System As Per Mcf/rbl Medts-0006, Rev-0. The Da Set Shall Be With Noise Reduction Features (without Acoustic Panels) As Per Spec. No. Rdso/pe/ms/ac/0045-2008 Rev-0, Amdt-1 With Rcf Annex-c. [ W Arranty Period: 30 Months After The Date Of Delivery ]

South East Central Railway
23 Sept 2025
Multi State - Multi City
Refer doc
0

Request For Proposal (rfp) For Appointment Of Authority Engineer For Providing Project Management Services For Construction Of New Railway Bg Electrified Line Between Rowghat- Jagdalpur (140 Km) Of South East Central Railway.

South East Central Railway
25 Aug 2025
Chhattisgarh - Bilaspur
Refer doc
0

Supply Of Piston Rod Bush Part No-w37.2093-1529 Make: Plasser [ Warranty Period: 30 Mont Hs After The Date Of Delivery ]

South East Central Railway
25 Aug 2025
Chhattisgarh - Bilaspur
Refer doc
0

Supply Of Piston Screw

South East Central Railway
25 Aug 2025
Chhattisgarh - Bilaspur
Refer doc
0

Supply Of Hex Bolt Half Thread

South East Central Railway
15 Dec 2025
Maharashtra - Nagpur
Refer doc
0

Supply Of Internal Micrometer 3-point Metric, Series: 468 Digimatic Holtests, 175 To 200mm Measuring +/-5um Accuracy, 0.001 Mm Resolution, Lcd Display, Sr44 Battery Power Source Similar Equivalent To Mit Utoyo 468-177 Along With Calibration Certificates Of Nabl Approved Lab Or Npl Make-mitutoyo Or Equivalent With Customized Ring Of Size 180mm For Calibration Purpose, Make -mitutoyo/tesa/forbes Only. [ Warra Nty Period: 30 Months After The Date Of Delivery ]

South East Central Railway
23 Aug 2025
Chhattisgarh - Bilaspur
Refer doc
0

Repair/reconditioning Of 6531 Kva Transformer For 3-phase Electric Locomotive I.e.wag9 Of Electric Loco Shed, Bilaspur.

South East Central Railway
25 Aug 2025
Chhattisgarh - Bilaspur
Refer doc
0

Supply Of Mas91.065 Piston Guide Ring Part No 63x58x5,51pom Make: Plasser [ Warranty Per Iod: 30 Months After The Date Of Delivery ]

South East Central Railway
25 Aug 2025
Chhattisgarh - Bilaspur
Refer doc
0

Supply Of Steel Chord, Plasser Part No. El-t576.10b, Make:plasser [ Warranty Period: 30 Months After The Date Of Delivery ]

South East Central Railway
25 Aug 2025
Himachal Pradesh - Bilaspur (HP)
Refer doc
0

Supply Of Helical Spring For Bogie Bolster Suspension

South East Central Railway
25 Aug 2025
Chhattisgarh - Bilaspur
Refer doc
0

Supply Of O-ring & Support Ring

South East Central Railway
25 Aug 2025
Maharashtra - Nagpur
Refer doc
0

Supply Of Uic Type Elastomer Flange Connection (top) For Intercommunication Betwee N Passenger Coaches (uic Vestibule Bellow Set) Suitably Packed In A Packing Case (item.1 6) Items 1,4,6,7,12,13,14 And 15 Of Icf/std-2-5-001, Alt.l/2, Col.ii To Rdso Spec. No. Rdso/2007/ Cg-05, (rev.1 Of Nov' 2018). [ Warranty Period: 30 Months After The Date Of Delivery ]

South East Central Railway
25 Aug 2025
West Bengal - Kolkata
Refer doc
0

Supply Of Tab. Vericiguat 2.5 Mg ]

South East Central Railway
25 Aug 2025
Maharashtra - Nagpur
Refer doc
0

Corrigendum : Supply Of Ohk For Check Valve With Choke Kit Consisting Of 5 Items. (1) Filter Item No. 2- Qty /kit-1. (2) Valve Sealing Ring Item No 4-qty/kit-1. (3) Compreession Sring Item No.6-qty/kit-1. (4) S Ealing Ring A 3946 Item No 7- Qty/kit-1. (5) Choke, Item No 3 Qty/kit-1 To Drg. Rdso Sk. 98111, Alt. 1, Items 2,3,4,6 And 7 And To Appendix I Spec. Rdso Spec.02-abr-02, Amendment No 04, Of Sep. 201 6. Rdso Sk.98111, Alt. 1, Item 2,4,6 And 7 Spec: Rdso Spec. 02-abr-02, Amendment No 4, Of Sep-2016 . [ Warranty Period: 36 Months After The Date Of Delivery ]

South East Central Railway
01 Sept 2025
Chhattisgarh - Bhilai
Refer doc
0

Corrigendum : Supply Of Set Of Door Latch Assembly For Sb 1, 2 & Hb 1, 2 Doors Of 3-phase Locos As Per Els/lgd Drg. No. C/els/lgd/b.f/3/42, Ref Nos. 01 To 07 Or Latest. Set Consisting Of 07 Items As Follows. (1) Ref No. 01 Bas E Plate As Per Is: 6603, Material: Stainless Steel, Qty/set -01 No. (2) Ref No. 02 Lock Plate As Per Is: 6603, M Aterial :stainless Steel, Qty/set-01 No. (3) Ref No. 03 Support Plate As Per Is: 6603, Material: Stainless Steel. Qty/set - 01 No. (4) Ref No. 04 Fixing Screw As Per Is: 1364/1367, Material: Steel, Qty/set- 04 Nos. (5) Ref No . 05 Flat Washer As Per Is: 2016, Material: Steel, Qty/set- 04 Nos. (6) Ref No. 06 Spring Washer As Per Is: 30 63, Material: Steel, Qty/set- 04 Nos. (7) Ref No. 07 Hex Nut As Per Is: 1364/1367, Material: Steel, Qty/set- 0 4 Nos. [ Warranty Period: 30 Months After The Date Of Delivery ]

South East Central Railway
01 Sept 2025
Chhattisgarh - Bhilai
Refer doc
0

Corrigendum : Supply Of Compression Set Apparatus For Testing Under Constant Strain (quick Clamping Type). Technical Specification Details: (1) Material Of Compression Plates, Spec-should Be Stainless Steel, (2) Dimention Requi Red (min) Spec-45 Mm X 10 Mm X 130 Mm, (3) No. Of Specimen Tested At A Time, Spec- 03 Nos. (min.), (4) Operating Temperature Range, Spec- 0 Degree Celsius To 120 Degree Celsius, (5) Spacer, Spec- 06 Sets Of S Pacers, (6) Operational Ambience Required, Spec- Open Air, Oven & Hot Water & Is : 3400 (pt-10)/1977, Mak E: Prolific Or Elastocon Or Uniframe Or Pec Or Equivalent. [ Warranty Period: 30 Months After The Dat E Of Delivery ]

Select a tender

South East Central Railway Tenders

With an ever-growing demand for infrastructure and transport solutions, GeMTech PARAS keeps you connected with South East Central Railway tenders through dedicated updates and real-time notifications. We cover every relevant keyword, including South East Central Railway, South East Central Railway tender, and South East Central Railway etenders. Whether you're a vendor looking to work with railway divisions or supply materials and services, our platform ensures you never miss a procurement opportunity. From construction projects to maintenance and supply contracts, GeMTech PARAS offers seamless access and vendor-friendly insights for South East Central Railway e-tender listings. Stay ahead with timely alerts and detailed tender information curated to help businesses thrive in the railway procurement ecosystem.