- Splitting
- Advisory Bank
- Reserved for MII
- Reserved for MSE
- Bid to RA Enabled
- Evaluation Method
- MSE Purchase Preference
- MSE Exemption
Splitting
Advisory Bank
Reserved for MII
Reserved for MSE
Bid to RA Enabled
Evaluation Method
MSE Purchase Preference
MSE Exemption
Showing 1 to 25 of 714 results for South East Central Railway Tenders
South East Central Railway
Replacement Of Existing Overaged Scada System As Per Rdso Spec Ti/spc/rcc/scada/0134 Or Latest For Durg-ngp Section Over Nagpur Division (including Supply, Erection, Testing And Commissioning Of Scada System As Per Rdso Spec Ti/spc/rcc/ Scada/0134 Or Latest , Dismantle Of Existing Scada System And Workstation Modification At Rcc).
South East Central Railway
Design/modification, Supply, Erection, Testing And Commissioning Of 220kv/2x25 Kv Scott Connected Traction Sub Station And Switching Posts With At Feeding Between Bilaspur (excl.) - Anuppur (incl.) Section Of Bilaspur Division Sec Railway In Connection With Up- Gradation Of Electric Traction System From 1x25 Kv To 2x25 Kv Traction System For Bilaspur-anuppur Section Of Secr To Meet 3000 Mt Loading Target.
South East Central Railway
Construction Of Road Over Bridge (rob) Proper (over Rail Track) Cum Road Under Bridge (rub) At Km 15/1-15/2 At Lc No. Ar-12 Between Abhanpur-rajim, On Engineering, Procurement & Construction (epc) Mode
South East Central Railway
Construction Of Road Over Bridge (rob) Proper (over Rail Track) Cum Road Under Bridge (rub) At Km 15/1-15/2 At Lc No. Ar-12 Between Abhanpur-rajim, On Engineering, Procurement & Construction (epc) Mode
South East Central Railway
Supply Of Set Of Transformer Fixing Bolts With Nuts(16 Nos Each).hex Bolt M 24x220mm Long Threaded
South East Central Railway
Upgradation Of Existing Scada System Over Bsp Division Of Sec Railway.
South East Central Railway
Supply Of Oxy-acetylene Regulator.
South East Central Railway
Supply, Installation, Commissioning And Testing Of Electric Surface Traverser , Capacity-80 Ton Etc.
South East Central Railway
Design, Supply, Erection, Testing And Commissioning Of 220kv/2x25 Kv Scott Connected Traction Sub Station And Switching Posts With At Feeding Between Bilaspur (incl.) - Raigarh (incl.) And Champa- Gevra Road- Surakachhar Section Of Bilaspur Division Sec Railway In Connection With Up- Gradation Of Electric Traction System From 1x25 Kv To 2x25 Kv Traction System Of Secr To Meet 3000 Mt Loading Target."
South East Central Railway
Supply, Installation, Testing & Commissioning Of 500kva (336kw), 750v, 3-phase Di Esel Alternator Set, Cpcb-iv Or Latest For Lhb Power Car With Pcc Panel (power Commond And C Ontrol Panel) Conforming To Rdso/pe/spec/ac/0084-2008 Rev-1, With Rcf Annex.-a And Icf Amen Dment-1 Along With Manual Isolating Switch As Per Edml-208, And Remote Monitoring System As Per Mcf/rbl Medts-0006, Rev-0. The Da Set Shall Be With Noise Reduction Features (without Acoustic Panels) As Per Spec. No. Rdso/pe/ms/ac/0045-2008 Rev-0, Amdt-1 With Rcf Annex-c. [ W Arranty Period: 30 Months After The Date Of Delivery ]
South East Central Railway
Request For Proposal (rfp) For Appointment Of Authority Engineer For Providing Project Management Services For Construction Of New Railway Bg Electrified Line Between Rowghat- Jagdalpur (140 Km) Of South East Central Railway.
South East Central Railway
Supply Of Piston Rod Bush Part No-w37.2093-1529 Make: Plasser [ Warranty Period: 30 Mont Hs After The Date Of Delivery ]
South East Central Railway
Supply Of Piston Screw
South East Central Railway
Supply Of Hex Bolt Half Thread
South East Central Railway
Supply Of Internal Micrometer 3-point Metric, Series: 468 Digimatic Holtests, 175 To 200mm Measuring +/-5um Accuracy, 0.001 Mm Resolution, Lcd Display, Sr44 Battery Power Source Similar Equivalent To Mit Utoyo 468-177 Along With Calibration Certificates Of Nabl Approved Lab Or Npl Make-mitutoyo Or Equivalent With Customized Ring Of Size 180mm For Calibration Purpose, Make -mitutoyo/tesa/forbes Only. [ Warra Nty Period: 30 Months After The Date Of Delivery ]
South East Central Railway
Repair/reconditioning Of 6531 Kva Transformer For 3-phase Electric Locomotive I.e.wag9 Of Electric Loco Shed, Bilaspur.
South East Central Railway
Supply Of Mas91.065 Piston Guide Ring Part No 63x58x5,51pom Make: Plasser [ Warranty Per Iod: 30 Months After The Date Of Delivery ]
South East Central Railway
Supply Of Steel Chord, Plasser Part No. El-t576.10b, Make:plasser [ Warranty Period: 30 Months After The Date Of Delivery ]
South East Central Railway
Supply Of Helical Spring For Bogie Bolster Suspension
South East Central Railway
Supply Of O-ring & Support Ring
South East Central Railway
Supply Of Uic Type Elastomer Flange Connection (top) For Intercommunication Betwee N Passenger Coaches (uic Vestibule Bellow Set) Suitably Packed In A Packing Case (item.1 6) Items 1,4,6,7,12,13,14 And 15 Of Icf/std-2-5-001, Alt.l/2, Col.ii To Rdso Spec. No. Rdso/2007/ Cg-05, (rev.1 Of Nov' 2018). [ Warranty Period: 30 Months After The Date Of Delivery ]
South East Central Railway
Supply Of Tab. Vericiguat 2.5 Mg ]
South East Central Railway
Corrigendum : Supply Of Ohk For Check Valve With Choke Kit Consisting Of 5 Items. (1) Filter Item No. 2- Qty /kit-1. (2) Valve Sealing Ring Item No 4-qty/kit-1. (3) Compreession Sring Item No.6-qty/kit-1. (4) S Ealing Ring A 3946 Item No 7- Qty/kit-1. (5) Choke, Item No 3 Qty/kit-1 To Drg. Rdso Sk. 98111, Alt. 1, Items 2,3,4,6 And 7 And To Appendix I Spec. Rdso Spec.02-abr-02, Amendment No 04, Of Sep. 201 6. Rdso Sk.98111, Alt. 1, Item 2,4,6 And 7 Spec: Rdso Spec. 02-abr-02, Amendment No 4, Of Sep-2016 . [ Warranty Period: 36 Months After The Date Of Delivery ]
South East Central Railway
Corrigendum : Supply Of Set Of Door Latch Assembly For Sb 1, 2 & Hb 1, 2 Doors Of 3-phase Locos As Per Els/lgd Drg. No. C/els/lgd/b.f/3/42, Ref Nos. 01 To 07 Or Latest. Set Consisting Of 07 Items As Follows. (1) Ref No. 01 Bas E Plate As Per Is: 6603, Material: Stainless Steel, Qty/set -01 No. (2) Ref No. 02 Lock Plate As Per Is: 6603, M Aterial :stainless Steel, Qty/set-01 No. (3) Ref No. 03 Support Plate As Per Is: 6603, Material: Stainless Steel. Qty/set - 01 No. (4) Ref No. 04 Fixing Screw As Per Is: 1364/1367, Material: Steel, Qty/set- 04 Nos. (5) Ref No . 05 Flat Washer As Per Is: 2016, Material: Steel, Qty/set- 04 Nos. (6) Ref No. 06 Spring Washer As Per Is: 30 63, Material: Steel, Qty/set- 04 Nos. (7) Ref No. 07 Hex Nut As Per Is: 1364/1367, Material: Steel, Qty/set- 0 4 Nos. [ Warranty Period: 30 Months After The Date Of Delivery ]
South East Central Railway
Corrigendum : Supply Of Compression Set Apparatus For Testing Under Constant Strain (quick Clamping Type). Technical Specification Details: (1) Material Of Compression Plates, Spec-should Be Stainless Steel, (2) Dimention Requi Red (min) Spec-45 Mm X 10 Mm X 130 Mm, (3) No. Of Specimen Tested At A Time, Spec- 03 Nos. (min.), (4) Operating Temperature Range, Spec- 0 Degree Celsius To 120 Degree Celsius, (5) Spacer, Spec- 06 Sets Of S Pacers, (6) Operational Ambience Required, Spec- Open Air, Oven & Hot Water & Is : 3400 (pt-10)/1977, Mak E: Prolific Or Elastocon Or Uniframe Or Pec Or Equivalent. [ Warranty Period: 30 Months After The Dat E Of Delivery ]
Select a tender
South East Central Railway Tenders
With an ever-growing demand for infrastructure and transport solutions, GeMTech PARAS keeps you connected with South East Central Railway tenders through dedicated updates and real-time notifications. We cover every relevant keyword, including South East Central Railway, South East Central Railway tender, and South East Central Railway etenders. Whether you're a vendor looking to work with railway divisions or supply materials and services, our platform ensures you never miss a procurement opportunity. From construction projects to maintenance and supply contracts, GeMTech PARAS offers seamless access and vendor-friendly insights for South East Central Railway e-tender listings. Stay ahead with timely alerts and detailed tender information curated to help businesses thrive in the railway procurement ecosystem.