GeM Tenders
Found 238 tenders for your search .
Engineering, Procurement And Construction (epc) Document For Construction Of New Railway Line In Km 111/150 To 124/400 In Between Gajrahi And Deosar Stations Including Earthwork, Minor Bridges, Station Building, Tunnels (04 Nos) And Important Bridge (01 No.) In Connection With Sidhi-singrauli New Rail Link Project In The State Of Madhya Pradesh
Read MorePublish Date | 04 Jan 2025 | |
Bid Submission End Date | 04 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 04 Jan 2025 | |
Bid Submission End Date | 04 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Procurement Of Rubber Pad For Primary Suspension For Fiat Ir Bogie Of Lhb Coaches To Drawing No. 1901097 Ver.08 Read Along With T.s. 17.531.100.03, T.s. 17.617.100.02, Mdts-148 Rev.01 & Mdts-122 Rev.03 Or Latest. The Material Will Be Supplied As Per Drawing And Qap Approved By Rcf / Icf.
Read MorePublish Date | 07 Jan 2025 | |
Bid Submission End Date | 01 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 07 Jan 2025 | |
Bid Submission End Date | 01 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Procurement Of Draw Hook Beam Reinforced For Draw Gear Arrangement To Drg. No.- T-2-1-602, Alt-2/m, Col.-i. Item 1 To 4 In Assembled Condition. As Per Drg.no. Drg. No.- T-2-1-602, Alt-2/m, Col.-i.
Read MorePublish Date | 07 Jan 2025 | |
Bid Submission End Date | 03 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 07 Jan 2025 | |
Bid Submission End Date | 03 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Mirror For Lhb Coaches To Rcf's Drg. No. Lw 63198 Alt. No.-'c'.
Read MorePublish Date | 07 Jan 2025 | |
Bid Submission End Date | 08 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 07 Jan 2025 | |
Bid Submission End Date | 08 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
1364; Stationary Valve Regulated Lead Acid Batteries V2 as per IS 15549 Q3 MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Past PerformanceCertificate Requested in ATCOEM Authorization Certificate In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ No Past Performance/20 Bid to RA enabled/4/ 4/ No Type of Bid/Single Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 2 Days
Read MorePublish Date | 14 Jan 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | 1.19 L | |
Tender Amount | Refer Doc |
Publish Date | 14 Jan 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | 1.19 L | |
Tender Amount | Refer Doc |
Supply Of Ball Joint Traction Lever To Fiat Drg. No C53 973 Ref Bred 8403 Rev.02 (ff1521728 Mod 01), To Be Read With T.s. 17.532 100 00 , T.s. 17.617.100 02, Mdts-148 Rev.01 & Mdts-122 Rev. '03' . [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 08 Jan 2025 | |
Bid Submission End Date | 19 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 08 Jan 2025 | |
Bid Submission End Date | 19 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Pressure Transformer Complete Du-111a For Keo Type D.v With 04 Nos. Hex Head Screw S & 04 Nos. Locking Rings (spring Washers) Per Set. [ Warranty Period: 36 Months After The Date Of D Elivery ]
Read MorePublish Date | 28 Jan 2025 | |
Bid Submission End Date | 19 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 28 Jan 2025 | |
Bid Submission End Date | 19 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Modified Terminal Box Cover For 4.5 Kw Alternator With Hinges 65 Mm Isi Marked, Gasket And Captive Screw To Rdso Drg. No.rdso/pe/sk/tl/0027-2002 (rev-1) As Per Drg.no. Rdso/pe/sk/tl/0 027-2002 (rev-1) [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 03 Feb 2025 | |
Bid Submission End Date | 19 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 03 Feb 2025 | |
Bid Submission End Date | 19 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Attendant Indicator Complete With Pcb Electronic Circuit As Per Drg. No. Icf/std/7-6-014 Alt-a With Separate Reset Switch And Led Type Indication Lamp Size 105x61 Mm With Buzzer. Make- Ram Yaa Electro Gear, D.r. Auto, Pep Electronics And Psa (princip Supply Agency) Or Equivalent. As Per Drg. No. Drg. No. Icf/std/7-6-014 Alt-a [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 03 Feb 2025 | |
Bid Submission End Date | 19 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 03 Feb 2025 | |
Bid Submission End Date | 19 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Procurement Of Drain Cock Assembly For Auxiliary Reservoir 200 Liters
Read MorePublish Date | 05 Feb 2025 | |
Bid Submission End Date | 19 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Feb 2025 | |
Bid Submission End Date | 19 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Mpcb For Exhaust Fan 1,2and 3 Wc Mbs 25 Auxiliarycontact (1no+1nc) Andterminal Block
Read MorePublish Date | 05 Feb 2025 | |
Bid Submission End Date | 19 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Feb 2025 | |
Bid Submission End Date | 19 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Hot Forged Steel Rivets
Read MorePublish Date | 05 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Washer Spring Steel
Read MorePublish Date | 05 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Split Pin Steel
Read MorePublish Date | 05 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Bulb Type Split Cotter
Read MorePublish Date | 05 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Electronic Time Delay Relay
Read MorePublish Date | 05 Feb 2025 | |
Bid Submission End Date | 21 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Feb 2025 | |
Bid Submission End Date | 21 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Piping Assly. For Air Dryer Type
Read MorePublish Date | 05 Feb 2025 | |
Bid Submission End Date | 21 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Feb 2025 | |
Bid Submission End Date | 21 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Pipe Clamp One Set Consisting
Read MorePublish Date | 05 Feb 2025 | |
Bid Submission End Date | 21 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Feb 2025 | |
Bid Submission End Date | 21 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Safety Helmet As Per Crws Specification. No. 17(rev. Ii)
Read MorePublish Date | 05 Feb 2025 | |
Bid Submission End Date | 21 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Feb 2025 | |
Bid Submission End Date | 21 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Bolts Hex Head High Tensile
Read MorePublish Date | 05 Feb 2025 | |
Bid Submission End Date | 21 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Feb 2025 | |
Bid Submission End Date | 21 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Horizontal Leveling Valve For Air Spring Assembly For Fiat Bogie
Read MorePublish Date | 05 Feb 2025 | |
Bid Submission End Date | 24 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Feb 2025 | |
Bid Submission End Date | 24 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Speed Sensor 8-pin Single Cable
Read MorePublish Date | 05 Feb 2025 | |
Bid Submission End Date | 24 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Feb 2025 | |
Bid Submission End Date | 24 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Knuckle Pivot Pin For Improved High Tensile Tight Lock Centre Buffer Coupler With Aar-h Type Head For Fitment Of Bg Passenger Coaches
Read MorePublish Date | 05 Feb 2025 | |
Bid Submission End Date | 24 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Feb 2025 | |
Bid Submission End Date | 24 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Laminated Glass For Wag-9 Loco
Read MorePublish Date | 05 Feb 2025 | |
Bid Submission End Date | 24 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Feb 2025 | |
Bid Submission End Date | 24 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Stainless Steel Dust Bin Fixing Arrangement With Frame For Lhb Coaches As Per Rcf Drawing Mi004725, Alt-h.
Read MorePublish Date | 05 Feb 2025 | |
Bid Submission End Date | 24 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Feb 2025 | |
Bid Submission End Date | 24 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |