- Splitting
- Advisory Bank
- Reserved for MII
- Reserved for MSE
- Bid to RA Enabled
- Evaluation Method
- MSE Purchase Preference
- MSE Exemption
Splitting
Advisory Bank
Reserved for MII
Reserved for MSE
Bid to RA Enabled
Evaluation Method
MSE Purchase Preference
MSE Exemption
Showing 9900 to 9925 of 10,000 results.
Urban Administration and Development Department
Supply Of Manpower (skilled, Semi-skilled And Un-skilled) At Sargaon
Indian Space Research Organisation
Fabrication, Assembly, Load Testing And Commisioning Of Sc120 Stage Horizantal Integration Fixture-1set (isr Fe-1no, Isr Ae-1no, Lox Fe-1no, Lox Ae-1no And Sits Saddle Support-3nos)
Indian Space Research Organisation
Vacuum Bagging Consumables For Paff Lab
Indian Space Research Organisation
Firewall At Ssa Control Centre
Indian Space Research Organisation
Gas Distribution Bank For Ssl
THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD.
Biennial Service Contract 2025to27 Regarding Mechanical Maintenance And Boiler Tube Leakage Rectification Job Of Unit 3 And 4 2x500mw At Sgtpp
UTTAR PRADESH POWER TRANSMISSION CORPORATION LIMITED
Civil Work For Construction Of Increasing Capacity From (1x160 Plus 1x100) Mva To (2x160 Plus 1x100) Mva Transformer At 220kv Substation Dadri Greater Noida
Director Cum Chief Engineer RED
Under District Barabanki, Construction Of Remaining Work Of Government Industrial Training Institute (iti) Sirauligauspur Under Pradhan Mantri Jan Kaushal Program, Lot No 1
Indraprastha Power Generation Company Limited
Annual Contract For Housekeeping And Equipments Cleaning At Pps Iii Bawana - Contract For Housekeeping & Equipments Cleaning At Pps-iii Bawana For Three Months, Clng Entire Flr Area Gt#1&2, Dusting Wall Door Window Gt#1&2, Washing Flr Gts&around, Gt Accries Coment Floor & Encloser 1&2, Dusting Clng Structural Member Gt#1&2, Clng Ent Flr Ar Gt#1&2 Air Inl Fil House, Clng Entire Flr Area Sos 1&2 ,jop 1&2, Clng Entire Flr Area Gcs 1& 2, Clng Entir Road ,drain Around Gcs 1&2, Dusting Clng Structurl Membr Gcs 1&2, Clng Entire Flr Area Of Et,pt,gbdpu, Dust Clng Wall Door Win Around Pt,gbdpu, Generator & Gcb Flr Of Unit#1 &2, Clng Entire Flr Area Of Exciaon Room1&2, Dust Clng Wall Door Win Of Exci Room 1&2, Cln Enti Flr Area Of Hydn Room 1&2,stg 1, Dust Cln Wall Dr Wn Of Hyd Rm Gt1&2,stg1, Clng Entire Flr Area Of Dmcw & Phe Room, Dust Cln Wall ,dr Wind Of Dmcw & Phe Rm, Cln Enti(gtgt1&2&stgt#1)sat1&2, Lt Tr Ar, Clng Entire Flr Area Of Package Ac Room, Clng Entire Ground Area Dsb, Dusting Wall Door Window Dsb, Clng Entire Ground Flr Area Hrsg I&ii, Clng Drains & Roads Around Hrsg I&i, Washing Roads Around Hrsg I&ii, Cln Enti Flr From Gf To 3rd Flr Bfp Bldg, Clng Drain & Road Around Bfp Bldg, Cln Ent Flr Ar Stg Hall Bldg, Mot&gd Flr, Dusting Clng Structural Member Stg Hall, Clng Entire Flr Area Of Control Room, Dust Cln Cab Wall Dr Wind Of Conl Room, Clng Entire Flr Area Of Battery Room, Clng Enti Flr Ar Of Cable Gallery Room, Clng Entire Flr Area Mcc Room, Dusting Clng Structural Member Mcc Room, Clng Entire Flr Area Of Nn100 Room, Clng Entire Flr Area Chiller Room, Clng Entire Flr Area Of Lp Co2 Tank, Cln Toilet Near By Gas Turbine, Clng Entire Flr Area Comp House, Dust Clng Door Window., Clng Entire Flr Area Of Fire Pump House, Dust Clng Door Window., Clng Entire Areas Of Cwpp House, Clng Entire Flr Area Rwr Pp House, Clng Entire Flr Area Gcs, Clng Entir...
Tripura State Electricity Corporation Limited
Maintenance Of Line Through Under Ground Cabling In Kunjaban Extension Area Where Key Installations Including State Disaster Response Control Room Is Situated And Creation Of Infrastructure And Installation Of 17 Nos Dt At Different Areas Under Ed Ca
Ministry of Road Trasnsport and Highways
Cs For Supervision Of Dubrajpur Bypass With 4-lane Configuration Of Length 5.676 Km On Nh 60 (new Nh-14) From Design Chainage 0.00 (existing Km 316.135 On Nh60) To Design Chainage 5.676 (existing Km 320.980 On Nh 60) In Birbhum West Bengal In Epc Mod
Ministry of Road Trasnsport and Highways
Consultancy Services For Preparation Of Detailed Project Report (dpr) For Construction Of 4 Lane Elevated Corridor From Natesan Nagar Rob (km 38.220 Of Nh-45a) To Ariyankuppam Bridge (km 40.780 Of Nh-45a) And Widening Of Existing Road To 4 Lane Road
Madras Fertilizers Limited
Procurement Of Steam Pressure Control To Evaporator (mfl Tag Pcv002) And Boiler Feed Pump Steam Inlet Control Valve
Ministry of Road Trasnsport and Highways
Corrigendum : Improvement From Km167/600 To 187/600 Of Nh85 (old Nh-49e) (kochi -madurai-thondi Road) On (epc) Basis Contract Under Annual Plan 2025-26 In The State Of Tamilnadu
DELHI METRO RAIL CORPORATION LIMITED
Des, Storage, Cwe Of Suitable Supply, Installation, Testing And Commissioning Of 5 Mwp Rooftop Solar Pv Project Including Operation And Maintenance Of The Project In Resco Model For A Period Of 25 Years Overdmrcs Phase-iv Network (part-ii) Comprising Of Line-08 Ext ,line-10 And Rss.
Security Printing and Minting Corporation of India Limited
National Pre-qualificiation Bid Document For Purchase Of 1,20,000 Km Of 2mm Colour Shift Security Thread For Cwbn Paper.
University Of Hyderabad
Operating Catering Services At Lake View Guest House (lvgh), Uoh, Hyderabad,
Department of Defence Production
Lean To Shed Covered Area For Various Places And Extension Of Covered Roof Storage Area In Rdq Yard With Rcc Flooring And Side Coverage Of Open Area To Avoid Rain Water Entry During Rain Bangalore Complex, Beml Limited.
Department of Defence Production
Providing Waterproofing Treatment To Rcc Roof And Associated Civil Works Of Various Buildings Inside Beml Factory Bangalore Complex, Beml Ltd, Bc
Department of Defence Production
Construction Of Phase Two Non Executive Quarters 48 Numbers At Beml Kanjikkode Palakkad Kerala
V O CHIDAMBARANAR PORT TRUST
Refurbishment Upgradation Development Operation And Maintenance Of The Existing Hospital At Voc Port Tuticorin To A 100 Bedded Super Speciality Hospital On Dbfot Basis Through Ppp
Urban Administration and Development Department
Laying Of Reflective Paver Block In Ward 03 Near Shoping Complex, Near Shivshakti Gate And Other Area
Urban Administration and Development Department
Construction Of Cc Drain From Rajasthan Sweets To Sbi Bank, Station Road In Ward No. 28-29 Dewas
Urban Administration and Development Department
Construction Of Community Hall At Bherugadh In Ward 37 Dewas
Urban Administration and Development Department
Construction Of Cc Road From Hss To Kutiya Balaji Mandir At Ward 05 And 06 Under Kayakalp 2 Abhiyan