Govt. Tenders
Found 1293 tenders for your search .
Supply Of Hose Clamp 90 Galvanised, As Per Drawing: Is:4762-2002, Table-1. Make : Klipco/ N Orma/klamp King [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Capacitor 3 Kvar As Per Rcf Drg. No. Cc 71521 Item No. 7 Suitable For Capacitor Bank O F Lhb Ac Coaches. Make - M/s. Epcos (part No.) B25671r4032a 80 Or M/s. Vishay (part No.) Acmkphd 480.3.3,00 [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Two Legged Polyester Webbing Sling With Forged Ring At Top And 2 Forged Steel D-shackle & E Ye Hooks At Bottom (with Full Length Heavy Duty Anti Abrasive Sleeve For Both Sling). Effective Length: 3.5 M. Safe Working Load: 5 Ton. Safety Factor: 5:1. Material Conforming To Bs: 3481 Part 2. Note: (1) Item Should Be Supplied With Load Test Certificate Issued By Government /certified Testing Agency. (2) Item Should Be Of Branded Make Like Greenfield Material Handling Or Bombay Lifting Or Duplex Webbings Or Similar. [ Warrant Y Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Dynamically Balanced Rotor With Shaft Suitable For Samal Harand Make Sctmb Motor For 3 Phase Locomotive. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 17 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 17 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Dynamically Balanced Rotor With Shaft Suitable For Ranjan Make Scmrb Motor F Or 3 Phase Locomotive [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 17 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 17 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Maintenance Kit For Brake Cylinder Of Coco Bogie Comprising Of 08 Items 70 No S. As Per Sk. No. Bsl/elw/sk.no. 7013 Alt-3. Each Unit Should Be Embossed Engraved With Ma Kers Name, Month, Year & Batch No. Of Manufactring At A Conspuicuous Place. (this Item Is Reserved For Clw Approved Sources Only.)(firms To Pay 10% Security Deposit Of Value Of Purchase Order.) [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 17 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 17 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Mn. Bushes For Wam4/wag5 Locomotive Comprising Of 24 Items 552 Nos. As Per Ske Tch No. Bsl/elw/sk.no.7019 Alt-9. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 17 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 17 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Dynamically Balanced Rotor With Shaft Suitable For Ranjan Make Sctmb Motor F Or 3 Phase Locomotive [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 17 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 17 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Rubber Components For Wag-5 Loco Wabco Pneumatic Valve Of Air Brake Type Loco Comprising Of 41 Items 148 Nos As Per Sketch No.elw/bsl/sk.no. 9045.alt-2. (thi S Item Is Reserved For Rdso Approved Source Only.) [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 17 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 17 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Dynamically Balanced Rotor With Shaft Suitable For Samal Harand Make Scmrb Motor For 3 Phase Locomotive [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 17 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 17 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Auto Adhesive Tape [kapton ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 10 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 10 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Cover For Earth Contact Of Axle Box As Per Clw Drawing No.1209-01.011-010 Alt-3. [ Warran Ty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 10 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 10 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Set Of Items For Traction Motor Dropping Detection System In Three Phase Loco Motives As Per Drawing No. A)ngp/trs/4/25.254 Qty =04 Nos. B) Ngp/trs/4/25.252 Qty= 06 Nos. C) Ngp/trs/4/25.253 Qty =06 Nos. D) Ngp/trs/4/25.251 Qty 06+02+04=12 Nos. One Set Consists Of 04 Items In 28 Nos. (one Sample Must Be Approved Before Bulk Supply) [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 10 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 10 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Design ,manufacturing, Supply, Installation, Testing , Commissioning And Proving Of The Baki Ng Oven With Trolley Type System On Turnkey Basis The Technical Specification For The Oven Is Attached As A Nnexure-a And Leading Parameter As Per Annexure - A1. [ Warranty Period: 24 Months After The Date Of D Elivery ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 10 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 10 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Frp Sheet Of Size 900mm X 900mm X 5mm Thick Made Of Iso Polyester Resin Reinforced With Fibre Glass Suitable For Ac-dc Siemens Rakes. [ Warranty Period: 30 Months After The Date Of Del Ivery ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 10 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 10 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply And Installation Of Air Dryer-250 Cfm- Refrigerant Type For Air Compressors Of C&w De Pot, Daund As Per Specifications Attached. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 10 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 10 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Spring Pad For Wap-1 And Wap-4 Locomotive Bogie To Rdso Specn. No. Mp. O.40.99.01 [rev-latest ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Motor Contactor (mc) To Clw Drg. No. 0twd.112.001 Alt-12 & 4twd.112.043. Alt- 4 Specn. No. 4tes 110.001 Alt-4. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 18 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Procurement Of Prosense Datalogger Part No-jk-fsd1124 As Per Rdso/2008/cg-04 Rev.6.0 M/s Jk Exim Private Limited [ Warranty Period: 48 Months After The Date Of Delivery ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 25 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 25 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Porcelain 9 Tonne Insulator Ri-6020-i (minimum Cd 1050 Mm) Conforming To Rdso Specification No. Ti/spc/ohe/ins/0071 Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 20 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
A) Hiring Of Jcb & Hydraulic Excavator For 2 Years In Se Ghat Under Aden (n) Lnl Section.
Read MorePublish Date | 20 Feb 2025 | |
Bid Submission End Date | 24 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Feb 2025 | |
Bid Submission End Date | 24 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
100; Anti Pest Repellent Q3 MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Bidder Turnover In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ Yes Bid to RA enabled/ No Type of Bid/Single Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 15 Days Inspection Required By Empanelled Inspection Authority / Agencies pre- registered with GeM No
Read MorePublish Date | 06 Feb 2025 | |
Bid Submission End Date | 22 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 06 Feb 2025 | |
Bid Submission End Date | 22 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Custom Bid for Services - Hiring of vehicle for transportation of railway material from anywhere to anywhere all over India Similar Category/ Vehicle Hiring Service - Per Vehicle-Day basis Contract Period/ 1 Years MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Bid to RA enabled/ No Type of Bid/Single Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 2 Days Estimated Bid Value/ 4722900 Evaluation Method/ Total value wise evaluation Arbitration Clause No Mediation Clause No
Read MorePublish Date | 06 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | 94.5 K | |
Tender Amount | Refer Doc |
Publish Date | 06 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | 94.5 K | |
Tender Amount | Refer Doc |
Custom Bid for Services - General upkeep and Management of TTE Rest House at CSMT along with provision of subsidized meals and other associated work for a period of two years 730 days Similar Category/ Facility Management Service - Outcome Based Contract Period/ 2 Years Past Experience of Similar Services required/ Yes MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaBidder TurnoverCertificate Requested in ATCAdditional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATCAdditional Doc 3 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ No
Read MorePublish Date | 06 Feb 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | 2.11 L | |
Tender Amount | 1.22 Cr |
Publish Date | 06 Feb 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | 2.11 L | |
Tender Amount | 1.22 Cr |
Manpower Outsourcing Services - Minimum wage - Skilled Secondary School Admin Manpower Outsourcing Services - Minimum wage - Skilled Secondary School Others Manpower Outsourcing Services - Minimum wage - Semi- skilled Not Required Others Contract Period/ 1 Years Years of Past Experience Required for same/similar service/ /0 /0 3 Year s Past Experience of Similar Services required/ Yes MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaAdditional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATCAdditional Doc 3 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Read MorePublish Date | 21 Feb 2025 | |
Bid Submission End Date | 14 Mar 2025 | |
Earnest Amount | 42.43 K | |
Tender Amount | 21.21 L |
Publish Date | 21 Feb 2025 | |
Bid Submission End Date | 14 Mar 2025 | |
Earnest Amount | 42.43 K | |
Tender Amount | 21.21 L |